The builder’s RERA record, explained

Shankeshwar World

Nitin Chhaganlal Jain · PM1260002500768

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For Shankeshwar World (PM1260002500768), 314 of 326 entries were marked unsold in the MahaRERA home list read 11 September 2026.

MahaRERA · per-home inventory · read 11 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

326 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 11 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Building A400040045.04–61.08 sq m≈ 485–657 sq ft
Building B420042045.04–61.06 sq m≈ 485–657 sq ft
Building C423039045.04–61.06 sq m≈ 485–657 sq ft
Building D420042045.04–61.06 sq m≈ 485–657 sq ft
Building E421041045.04–61.06 sq m≈ 485–657 sq ft
Building F420042045.04–61.06 sq m≈ 485–657 sq ft
Building G420042045.04–61.06 sq m≈ 485–657 sq ft
Commercial Building260026025.53–74.57 sq m≈ 275–803 sq ft
Unit A B20002142.86 sq m≈ 1,538 sq ft
Unit C D20002127.91 sq m≈ 1,377 sq ft
Unit E F20002127.91 sq m≈ 1,377 sq ft
Unit G H20002127.91 sq m≈ 1,377 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

326 listed entries

MahaRERA · per-home inventory · read 11 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
102Building A145.04 sq m≈ 485 sq ftMarked unsoldNot stated
103Building A148.78 sq m≈ 525 sq ftMarked unsoldNot stated
104Building A161.06 sq m≈ 657 sq ftMarked unsoldNot stated
105Building A145.04 sq m≈ 485 sq ftMarked unsoldNot stated
201Building A261.06 sq m≈ 657 sq ftMarked unsoldNot stated
202Building A245.04 sq m≈ 485 sq ftMarked unsoldNot stated
203Building A248.78 sq m≈ 525 sq ftMarked unsoldNot stated
204Building A261.06 sq m≈ 657 sq ftMarked unsoldNot stated
205Building A245.04 sq m≈ 485 sq ftMarked unsoldNot stated
206Building A261.06 sq m≈ 657 sq ftMarked unsoldNot stated
301Building A361.08 sq m≈ 657 sq ftMarked unsoldNot stated
302Building A345.04 sq m≈ 485 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹10,929,939 of an estimated ₹330,000,000 was reported as incurred (3.3%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration PM1260002500768

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Commercial BuildingExcavation0.0%
Commercial BuildingBasement (if any)0.0%
Commercial BuildingPlinth0.0%
Commercial BuildingSlabs of Super Structure0.0%
Commercial BuildingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Commercial BuildingSanitary Fittings within the flats / premises0.0%
Commercial BuildingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Commercial BuildingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Commercial BuildingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building AExcavation0.0%
Building ABasement (if any)0.0%
Building APlinth0.0%
Building AStilt Floor 0.0%
Building ASlabs of Super Structure0.0%
Building AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building ASanitary Fittings within the flats / premises0.0%
Building AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building BExcavation90.0%
Building BBasement (if any)0.0%
Building BPlinth0.0%
Building BStilt Floor 0.0%
Building BSlabs of Super Structure0.0%
Building BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building BSanitary Fittings within the flats / premises0.0%
Building BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building CExcavation90.0%
Building CBasement (if any)0.0%
Building CPlinth0.0%
Building CStilt Floor 0.0%
Building CSlabs of Super Structure0.0%
Building CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building CSanitary Fittings within the flats / premises0.0%
Building CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building DExcavation90.0%
Building DBasement (if any)0.0%
Building DPlinth0.0%
Building DStilt Floor 0.0%
Building DSlabs of Super Structure0.0%
Building DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building DSanitary Fittings within the flats / premises0.0%
Building DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building EExcavation100.0%
Building EBasement (if any)0.0%
Building EPlinth0.0%
Building EStilt Floor 0.0%
Building ESlabs of Super Structure0.0%
Building EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building ESanitary Fittings within the flats / premises0.0%
Building EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building FExcavation100.0%
Building FBasement (if any)0.0%
Building FPlinth0.0%
Building FStilt Floor 0.0%
Building FSlabs of Super Structure0.0%
Building FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building FSanitary Fittings within the flats / premises0.0%
Building FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Building GExcavation100.0%
Building GBasement (if any)0.0%
Building GPlinth0.0%
Building GStilt Floor 0.0%
Building GSlabs of Super Structure0.0%
Building GInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Building GSanitary Fittings within the flats / premises0.0%
Building GStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Building GExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Building GInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit A BExcavation0.0%
Unit A BBasement (if any)0.0%
Unit A BPlinth0.0%
Unit A BSlabs of Super Structure0.0%
Unit A BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit A BSanitary Fittings within the flats / premises0.0%
Unit A BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit A BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit A BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit A BExcavation0.0%
Unit A BBasement (if any)0.0%
Unit A BPlinth0.0%
Unit A BSlabs of Super Structure0.0%
Unit A BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit A BSanitary Fittings within the flats / premises0.0%
Unit A BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit A BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit A BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit C DExcavation0.0%
Unit C DBasement (if any)0.0%
Unit C DPlinth0.0%
Unit C DSlabs of Super Structure0.0%
Unit C DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit C DSanitary Fittings within the flats / premises0.0%
Unit C DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit C DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit C DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit C DExcavation0.0%
Unit C DBasement (if any)0.0%
Unit C DPlinth0.0%
Unit C DSlabs of Super Structure0.0%
Unit C DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit C DSanitary Fittings within the flats / premises0.0%
Unit C DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit C DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit C DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit E FExcavation0.0%
Unit E FBasement (if any)0.0%
Unit E FPlinth0.0%
Unit E FSlabs of Super Structure0.0%
Unit E FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit E FSanitary Fittings within the flats / premises0.0%
Unit E FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit E FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit E FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit E FExcavation0.0%
Unit E FBasement (if any)0.0%
Unit E FPlinth0.0%
Unit E FSlabs of Super Structure0.0%
Unit E FInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit E FSanitary Fittings within the flats / premises0.0%
Unit E FStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit E FExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit E FInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit G HExcavation0.0%
Unit G HBasement (if any)0.0%
Unit G HPlinth0.0%
Unit G HSlabs of Super Structure0.0%
Unit G HInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit G HSanitary Fittings within the flats / premises0.0%
Unit G HStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit G HExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit G HInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Unit G HExcavation0.0%
Unit G HBasement (if any)0.0%
Unit G HPlinth0.0%
Unit G HSlabs of Super Structure0.0%
Unit G HInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Unit G HSanitary Fittings within the flats / premises0.0%
Unit G HStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Unit G HExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Unit G HInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration PM1260002500768

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹408,000,000₹0₹0₹408,000,000
Actual raised₹78,382,812₹0₹0₹78,382,812

MahaRERA project filing · read 19 July 2026 · registration PM1260002500768

Quarterly filing record

3 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration PM1260002500768

Documents named in the filing

  • Sanctioned layout plan · 2 listed
  • Sanctioned building plan · 20 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Commencement certificate · 2 listed
  • Promoter PAN · 1 listed
  • Occupancy / completion certificate · 6 listed
  • Form 3 — CA certificate · 2 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration PM1260002500768

Builder and past records

What else does the record show?

Projects registered under this company

Nitin Chhaganlal Jain

5Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 20 September 2026

    314 marked unsold · 4 sold · 0 booked.

    Saved MahaRERA home list

  2. 11 September 2026

    314 marked unsold · 4 sold · 0 booked.

    Saved MahaRERA home list

  3. 19 July 2026

    318 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA home list

  4. 18 July 2026

    318 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA home list, date based on the saved file

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · read 11 September 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.