homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Infini Jagtap City

Infini Modern Builders LLP · PM1261012600140

MahaRERA · registration record · read 2 July 2026

Choose a report ↓

What does the RERA record show?

For Infini Jagtap City (PM1261012600140), 175 of 265 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

265 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
Wing C1100010061.52–81.23 sq m≈ 662–874 sq ft
Wing C29900792061.52–81.23 sq m≈ 662–874 sq ft
Wing D8008061.31–81.24 sq m≈ 660–874 sq ft
Wing E5600381861.29–77.34 sq m≈ 660–832 sq ft
Wing H520005236.12–49.97 sq m≈ 389–538 sq ft
Wing I400040020.57–96.32 sq m≈ 221–1,037 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

265 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
101Wing C1 / Wing NA161.54 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
102Wing C1 / Wing NA161.52 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
103Wing C1 / Wing NA161.52 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
104Wing C1 / Wing NA161.97 sq m≈ 667 sq ft · RERA carpet areaMarked unsoldNot stated
105Wing C1 / Wing NA161.52 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
106Wing C1 / Wing NA161.52 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
107Wing C1 / Wing NA161.52 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
108Wing C1 / Wing NA162.6 sq m≈ 674 sq ft · RERA carpet areaMarked unsoldNot stated
109Wing C1 / Wing NA181.23 sq m≈ 874 sq ft · RERA carpet areaMarked unsoldNot stated
110Wing C1 / Wing NA181.23 sq m≈ 874 sq ft · RERA carpet areaMarked unsoldNot stated
1001Wing C2 / Wing NA1061.54 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated
1002Wing C2 / Wing NA1061.52 sq m≈ 662 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Wing AExcavation6.0%
Wing ABasement (if any)0.0%
Wing APlinth0.0%
Wing AStilt Floor 0.0%
Wing ASlabs of Super Structure0.0%
Wing AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing ASanitary Fittings within the flats / premises0.0%
Wing AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing BExcavation6.0%
Wing BBasement (if any)0.0%
Wing BPlinth0.0%
Wing BStilt Floor 0.0%
Wing BSlabs of Super Structure0.0%
Wing BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing BSanitary Fittings within the flats / premises0.0%
Wing BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing C1Excavation5.0%
Wing C1Basement (if any)0.0%
Wing C1Plinth0.0%
Wing C1Stilt Floor 0.0%
Wing C1Slabs of Super Structure0.0%
Wing C1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing C1Sanitary Fittings within the flats / premises0.0%
Wing C1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing C1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing C1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing C2Excavation10.0%
Wing C2Basement (if any)0.0%
Wing C2Plinth0.0%
Wing C2Stilt Floor 0.0%
Wing C2Slabs of Super Structure0.0%
Wing C2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing C2Sanitary Fittings within the flats / premises0.0%
Wing C2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing C2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing C2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing DExcavation85.0%
Wing DBasement (if any)85.0%
Wing DPlinth80.0%
Wing DStilt Floor 0.0%
Wing DSlabs of Super Structure20.0%
Wing DInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing DSanitary Fittings within the flats / premises0.0%
Wing DStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing DExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing DInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing EExcavation85.0%
Wing EBasement (if any)85.0%
Wing EPlinth80.0%
Wing EStilt Floor 0.0%
Wing ESlabs of Super Structure20.0%
Wing EInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing ESanitary Fittings within the flats / premises0.0%
Wing EStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing EExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing EInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing GExcavation5.0%
Wing GBasement (if any)0.0%
Wing GPlinth0.0%
Wing GStilt Floor 0.0%
Wing GSlabs of Super Structure0.0%
Wing GInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing GSanitary Fittings within the flats / premises0.0%
Wing GStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing GExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing GInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing HExcavation5.0%
Wing HBasement (if any)0.0%
Wing HPlinth0.0%
Wing HStilt Floor 0.0%
Wing HSlabs of Super Structure0.0%
Wing HInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing HSanitary Fittings within the flats / premises0.0%
Wing HStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing HExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing HInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Wing IExcavation0.0%
Wing IBasement (if any)0.0%
Wing IPlinth0.0%
Wing IStilt Floor 0.0%
Wing ISlabs of Super Structure0.0%
Wing IInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Wing ISanitary Fittings within the flats / premises0.0%
Wing IStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Wing IExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Wing IInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PM1261012600140

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹100,000,000₹0₹654,710,242₹854,710,242
Actual raised₹76,500,000₹0₹0₹119,891,630

MahaRERA project filing · read 18 July 2026 · registration PM1261012600140

Documents named in the filing

  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned building plan · 22 listed
  • Occupancy / completion certificate · 10 listed
  • Promoter PAN · 8 listed
  • Commencement certificate · 4 listed
  • Form 3 — CA certificate · 1 listed
  • Sanctioned layout plan · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PM1261012600140

Builder and past records

What else does the record show?

Projects registered under this company

Infini Modern Builders LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 30 September 2026

      175 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    2. 21 September 2026

      175 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    3. 12 September 2026

      175 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    4. 4 September 2026

      175 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, property type and price.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 2 July 2026

    MahaRERA · per-unit inventory · saved-file date 18 July 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    The unit-list date is based on the saved file’s details.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search PM1261012600140 ↗
    homeonpaper