For Majestique Rhythm County Phase V (PR1260002501002), 336 of 336 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Inside this registered phase
336 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| WING B15 | 56 | 0 | 0 | 56 | 0 | 48.42–73.00 sq m≈ 521–786 sq ft |
| WING B16 | 56 | 0 | 0 | 56 | 0 | 48.42–58.49 sq m≈ 521–630 sq ft |
| WING B17 | 56 | 0 | 0 | 56 | 0 | 45.74–55.79 sq m≈ 492–601 sq ft |
| WING B18 | 56 | 0 | 0 | 56 | 0 | 45.74–55.79 sq m≈ 492–601 sq ft |
| WING B19 | 56 | 0 | 0 | 56 | 0 | 48.42–58.49 sq m≈ 521–630 sq ft |
| WING B20 | 56 | 0 | 0 | 56 | 0 | 48.42–73.00 sq m≈ 521–786 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001WING B15 | 10 | 58.81 sq m≈ 633 sq ft | Marked unsold | Not stated | |
| 1002WING B15 | 10 | 73.0 sq m≈ 786 sq ft | Marked unsold | Not stated | |
| 1003WING B15 | 10 | 73.0 sq m≈ 786 sq ft | Marked unsold | Not stated | |
| 1004WING B15 | 10 | 58.81 sq m≈ 633 sq ft | Marked unsold | Not stated | |
| 101WING B15 | 1 | 58.81 sq m≈ 633 sq ft | Marked unsold | Not stated | |
| 102WING B15 | 1 | 73.0 sq m≈ 786 sq ft | Marked unsold | Not stated | |
| 103WING B15 | 1 | 73.0 sq m≈ 786 sq ft | Marked unsold | Not stated | |
| 104WING B15 | 1 | 58.81 sq m≈ 633 sq ft | Marked unsold | Not stated | |
| 1101WING B15 | 11 | 58.81 sq m≈ 633 sq ft | Marked unsold | Not stated | |
| 1102WING B15 | 11 | 73.0 sq m≈ 786 sq ft | Marked unsold | Not stated | |
| 1103WING B15 | 11 | 73.0 sq m≈ 786 sq ft | Marked unsold | Not stated | |
| 1104WING B15 | 11 | 58.81 sq m≈ 633 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹0 of an estimated ₹1,173,469,000 was reported as incurred (0.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration PR1260002501002
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| WING B15 | Excavation | 0.0% |
| WING B15 | Basement (if any) | 0.0% |
| WING B15 | Plinth | 0.0% |
| WING B15 | Stilt Floor | 0.0% |
| WING B15 | Slabs of Super Structure | 0.0% |
| WING B15 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B15 | Sanitary Fittings within the flats / premises | 0.0% |
| WING B15 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B15 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B15 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| WING B16 | Excavation | 0.0% |
| WING B16 | Basement (if any) | 0.0% |
| WING B16 | Plinth | 0.0% |
| WING B16 | Stilt Floor | 0.0% |
| WING B16 | Slabs of Super Structure | 0.0% |
| WING B16 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B16 | Sanitary Fittings within the flats / premises | 0.0% |
| WING B16 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B16 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B16 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| WING B17 | Excavation | 0.0% |
| WING B17 | Basement (if any) | 0.0% |
| WING B17 | Plinth | 0.0% |
| WING B17 | Stilt Floor | 0.0% |
| WING B17 | Slabs of Super Structure | 0.0% |
| WING B17 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B17 | Sanitary Fittings within the flats / premises | 0.0% |
| WING B17 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B17 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B17 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| WING B18 | Excavation | 0.0% |
| WING B18 | Basement (if any) | 0.0% |
| WING B18 | Plinth | 0.0% |
| WING B18 | Stilt Floor | 0.0% |
| WING B18 | Slabs of Super Structure | 0.0% |
| WING B18 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B18 | Sanitary Fittings within the flats / premises | 0.0% |
| WING B18 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B18 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B18 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| WING B19 | Excavation | 0.0% |
| WING B19 | Basement (if any) | 0.0% |
| WING B19 | Plinth | 0.0% |
| WING B19 | Stilt Floor | 0.0% |
| WING B19 | Slabs of Super Structure | 0.0% |
| WING B19 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B19 | Sanitary Fittings within the flats / premises | 0.0% |
| WING B19 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B19 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B19 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| WING B20 | Excavation | 0.0% |
| WING B20 | Basement (if any) | 0.0% |
| WING B20 | Plinth | 0.0% |
| WING B20 | Stilt Floor | 0.0% |
| WING B20 | Slabs of Super Structure | 0.0% |
| WING B20 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| WING B20 | Sanitary Fittings within the flats / premises | 0.0% |
| WING B20 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| WING B20 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| WING B20 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration PR1260002501002
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹79,542,535 | ₹0 | ₹1,293,394,931 | ₹1,372,937,466 |
| Actual raised | ₹57,423,770 | ₹0 | ₹1,666,376 | ₹59,090,146 |
MahaRERA project filing · read 19 July 2026 · registration PR1260002501002
3 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration PR1260002501002
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration PR1260002501002
Builder and past records
Projects registered under this company
6Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
20 September 2026
336 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
11 September 2026
336 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
336 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
18 July 2026
336 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list, date based on the saved file
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search PR1260002501002 ↗