homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

Hinjewadi Phase 3 - Tower 2

BELLISSIMO INFRATECH PRIVATE LIMITED · PR1260002502575

MahaRERA · registration record · read 2 July 2026

Choose a report ↓

What does the RERA record show?

For Hinjewadi Phase 3 - Tower 2 (PR1260002502575), 134 of 134 entries were marked unsold in the MahaRERA unit list read 30 September 2026.

MahaRERA · per-unit inventory · read 30 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

134 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 30 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
Tower 213400134091.95–119.69 sq m≈ 990–1,288 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

134 listed entries

MahaRERA · per-unit inventory · read 30 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
001Tower 2 / Wing NA205119.69 sq m≈ 1,288 sq ft · RERA carpet areaMarked unsoldNot stated
002Tower 2 / Wing NA205113.35 sq m≈ 1,220 sq ft · RERA carpet areaMarked unsoldNot stated
1001Tower 2 / Wing NA10113.35 sq m≈ 1,220 sq ft · RERA carpet areaMarked unsoldNot stated
1002Tower 2 / Wing NA10119.69 sq m≈ 1,288 sq ft · RERA carpet areaMarked unsoldNot stated
1004Tower 2 / Wing NA10109.64 sq m≈ 1,180 sq ft · RERA carpet areaMarked unsoldNot stated
101Tower 2 / Wing NA1113.35 sq m≈ 1,220 sq ft · RERA carpet areaMarked unsoldNot stated
102Tower 2 / Wing NA1113.35 sq m≈ 1,220 sq ft · RERA carpet areaMarked unsoldNot stated
1101Tower 2 / Wing NA11113.35 sq m≈ 1,220 sq ft · RERA carpet areaMarked unsoldNot stated
1102Tower 2 / Wing NA11119.69 sq m≈ 1,288 sq ft · RERA carpet areaMarked unsoldNot stated
1103Tower 2 / Wing NA1193.62 sq m≈ 1,008 sq ft · RERA carpet areaMarked unsoldNot stated
1104Tower 2 / Wing NA1193.62 sq m≈ 1,008 sq ft · RERA carpet areaMarked unsoldNot stated
1201Tower 2 / Wing NA12113.35 sq m≈ 1,220 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹0 of an estimated ₹1,407,549,683 was reported as incurred (0.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration PR1260002502575

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
BUILDING T2-TYPE A5Excavation100.0%
BUILDING T2-TYPE A5Podiums (if any) 0.0%
BUILDING T2-TYPE A5Plinth0.0%
BUILDING T2-TYPE A5Stilt Floor 0.0%
BUILDING T2-TYPE A5Slabs of Super Structure0.0%
BUILDING T2-TYPE A5Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING T2-TYPE A5Sanitary Fittings within the flats / premises0.0%
BUILDING T2-TYPE A5Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING T2-TYPE A5External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING T2-TYPE A5Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PR1260002502575

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹0₹0₹297,467,404₹2,186,149,332

MahaRERA project filing · read 18 July 2026 · registration PR1260002502575

Quarterly filing record

2 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration PR1260002502575

Documents named in the filing

  • Sanctioned building plan · 3 listed
  • Title / search report · 2 listed
  • Occupancy / completion certificate · 3 listed
  • Sanctioned layout plan · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Promoter PAN · 4 listed
  • Form B — Promoter declaration · 1 listed
  • Commencement certificate · 2 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PR1260002502575

Builder and past records

What else does the record show?

Projects registered under this company

BELLISSIMO INFRATECH PRIVATE LIMITED

7Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026

Explore other registrations

Past records of sales and unsold units

  1. 30 September 2026

    134 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

  2. 21 September 2026

    124 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

  3. 12 September 2026

    124 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

  4. 4 September 2026

    124 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, property type and price.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 2 July 2026

MahaRERA · per-unit inventory · read 30 September 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search PR1260002502575 ↗
homeonpaper