The builder’s RERA record, explained

SAI ANANTA

SHREE VENKATESHWARA GROUP · PR1260002502966

MahaRERA · registration record · read 2 July 2026

Choose a report ↓

What does the RERA record show?

For SAI ANANTA (PR1260002502966), 143 of 165 entries were marked unsold in the MahaRERA unit list read 4 September 2026.

MahaRERA · per-unit inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

165 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
B BUILDING200002049.78–49.95 sq m≈ 536–538 sq ft
C BUILDING14500143249.95–89.61 sq m≈ 538–965 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

165 listed entries

MahaRERA · per-unit inventory · read 4 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
1001 C BUILDING / Wing NA1064.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
1002 C BUILDING / Wing NA1064.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
1003 C BUILDING / Wing NA1089.61 sq m≈ 965 sq ft · RERA carpet areaMarked unsoldNot stated
1004 C BUILDING / Wing NA1089.61 sq m≈ 965 sq ft · RERA carpet areaMarked unsoldNot stated
1005 C BUILDING / Wing NA1064.36 sq m≈ 693 sq ft · RERA carpet areaMarked unsoldNot stated
101-MHADA C BUILDING / Wing NA149.95 sq m≈ 538 sq ft · RERA carpet areaReservedNot stated
102-MHADA C BUILDING / Wing NA149.95 sq m≈ 538 sq ft · RERA carpet areaReservedNot stated
103 C BUILDING / Wing NA189.61 sq m≈ 965 sq ft · RERA carpet areaMarked unsoldNot stated
104 C BUILDING / Wing NA189.61 sq m≈ 965 sq ft · RERA carpet areaMarked unsoldNot stated
105 C BUILDING / Wing NA164.36 sq m≈ 693 sq ft · RERA carpet areaMarked unsoldNot stated
1101 C BUILDING / Wing NA1164.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated
1102 C BUILDING / Wing NA1164.57 sq m≈ 695 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹12,650 of an estimated ₹53,620,924 was reported as incurred (0.0%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration PR1260002502966

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
A BUILDINGExcavation100.0%
A BUILDINGBasement (if any)0.0%
A BUILDINGPodiums (if any) 0.0%
A BUILDINGPlinth0.0%
A BUILDINGStilt Floor 0.0%
A BUILDINGSlabs of Super Structure0.0%
A BUILDINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
A BUILDINGSanitary Fittings within the flats / premises0.0%
A BUILDINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
A BUILDINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
A BUILDINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
B BUILDING Excavation100.0%
B BUILDING Basement (if any)0.0%
B BUILDING Podiums (if any) 0.0%
B BUILDING Plinth0.0%
B BUILDING Stilt Floor 0.0%
B BUILDING Slabs of Super Structure0.0%
B BUILDING Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
B BUILDING Sanitary Fittings within the flats / premises0.0%
B BUILDING Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
B BUILDING External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
B BUILDING Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
C BUILDINGExcavation100.0%
C BUILDINGBasement (if any)0.0%
C BUILDINGPodiums (if any) 0.0%
C BUILDINGPlinth0.0%
C BUILDINGStilt Floor 0.0%
C BUILDINGSlabs of Super Structure0.0%
C BUILDINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
C BUILDINGSanitary Fittings within the flats / premises0.0%
C BUILDINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
C BUILDINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
C BUILDINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PR1260002502966

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹23,419,901₹0₹90,818,117₹114,238,018
Actual raised₹8,790,000₹0₹0₹57,578,908

MahaRERA project filing · read 18 July 2026 · registration PR1260002502966

Quarterly filing record

2 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration PR1260002502966

Documents named in the filing

  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 5 listed
  • Form B — Promoter declaration · 1 listed
  • Commencement certificate · 6 listed
  • Promoter PAN · 5 listed
  • Occupancy / completion certificate · 3 listed
  • Form 3 — CA certificate · 1 listed
  • Title / search report · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PR1260002502966

Builder and past records

What else does the record show?

Projects registered under this company

SHREE VENKATESHWARA GROUP

2Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026 – 12 July 2026

Explore other registrations

Past records of sales and unsold units

  1. 30 September 2026

    143 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

  2. 21 September 2026

    143 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

  3. 12 September 2026

    143 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

  4. 4 September 2026

    143 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 2 July 2026

MahaRERA · per-unit inventory · read 4 September 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.