WESTERNHILLS BHUGAON PHASE 1

VISTAVERDE BUILDERS LLP · PR1261012502788

MahaRERA · registration record · read 2 July 2026

Choose a report ↓

What does the RERA record show?

For WESTERNHILLS BHUGAON PHASE 1 (PR1261012502788), 120 of 120 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

120 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
BUILDING 12400240120.00–198.27 sq m≈ 1,292–2,134 sq ft
BUILDING 22400240119.86–197.95 sq m≈ 1,290–2,131 sq ft
BUILDING 32400240120.00–198.27 sq m≈ 1,292–2,134 sq ft
BUILDING 42400240119.86–198.27 sq m≈ 1,290–2,134 sq ft
BUILDING 52400240120.00–198.27 sq m≈ 1,292–2,134 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

120 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1BUILDING 1205136.55 sq m≈ 1,470 sq ftMarked unsoldNot stated
101BUILDING 11154.44 sq m≈ 1,662 sq ftMarked unsoldNot stated
104BUILDING 11154.44 sq m≈ 1,662 sq ftMarked unsoldNot stated
2BUILDING 1205184.47 sq m≈ 1,986 sq ftMarked unsoldNot stated
201BUILDING 12149.61 sq m≈ 1,610 sq ftMarked unsoldNot stated
202BUILDING 12120.04 sq m≈ 1,292 sq ftMarked unsoldNot stated
203BUILDING 12120.15 sq m≈ 1,293 sq ftMarked unsoldNot stated
204BUILDING 12149.61 sq m≈ 1,610 sq ftMarked unsoldNot stated
3BUILDING 1205186.94 sq m≈ 2,012 sq ftMarked unsoldNot stated
301BUILDING 13143.97 sq m≈ 1,550 sq ftMarked unsoldNot stated
302BUILDING 13120.04 sq m≈ 1,292 sq ftMarked unsoldNot stated
303BUILDING 13120.15 sq m≈ 1,293 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹15,573,292 of an estimated ₹841,520,880 was reported as incurred (1.9%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration PR1261012502788

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
BUILDING 1Excavation80.0%
BUILDING 1Basement (if any)0.0%
BUILDING 1Podiums (if any) 0.0%
BUILDING 1Plinth0.0%
BUILDING 1Slabs of Super Structure0.0%
BUILDING 1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING 1Sanitary Fittings within the flats / premises0.0%
BUILDING 1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING 1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING 1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING 2Excavation80.0%
BUILDING 2Basement (if any)0.0%
BUILDING 2Podiums (if any) 0.0%
BUILDING 2Plinth0.0%
BUILDING 2Slabs of Super Structure0.0%
BUILDING 2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING 2Sanitary Fittings within the flats / premises0.0%
BUILDING 2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING 2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING 2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING 3Excavation0.0%
BUILDING 3Basement (if any)0.0%
BUILDING 3Podiums (if any) 0.0%
BUILDING 3Plinth0.0%
BUILDING 3Slabs of Super Structure0.0%
BUILDING 3Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING 3Sanitary Fittings within the flats / premises0.0%
BUILDING 3Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING 3External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING 3Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING 4Excavation0.0%
BUILDING 4Basement (if any)0.0%
BUILDING 4Podiums (if any) 0.0%
BUILDING 4Plinth0.0%
BUILDING 4Slabs of Super Structure0.0%
BUILDING 4Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING 4Sanitary Fittings within the flats / premises0.0%
BUILDING 4Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING 4External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING 4Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING 5Excavation0.0%
BUILDING 5Basement (if any)0.0%
BUILDING 5Podiums (if any) 0.0%
BUILDING 5Plinth0.0%
BUILDING 5Slabs of Super Structure0.0%
BUILDING 5Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING 5Sanitary Fittings within the flats / premises0.0%
BUILDING 5Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING 5External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING 5Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PR1261012502788

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹350,000,000₹350,000,000₹422,729,693₹1,122,729,693
Actual raised₹276,295,718₹0₹0₹276,295,718

MahaRERA project filing · read 18 July 2026 · registration PR1261012502788

Quarterly filing record

1 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration PR1261012502788

Documents named in the filing

  • Form B — Promoter declaration · 1 listed
  • Commencement certificate · 9 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 6 listed
  • Occupancy / completion certificate · 4 listed
  • Form 3 — CA certificate · 1 listed
  • Title / search report · 1 listed
  • Promoter PAN · 2 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Form 1 — Architect's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PR1261012502788

Builder and past records

What else does the record show?

Projects registered under this company

VISTAVERDE BUILDERS LLP

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 21 September 2026

      120 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    2. 12 September 2026

      120 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      120 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      120 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 2 July 2026

    MahaRERA · per-home inventory · saved-file date 18 July 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    The home-list date is based on the saved file’s details.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.