The builder’s RERA record, explained

THE WINDS PHASE-1, SECTOR 1B AT AVIAN VALLEY

KOLTE-PATIL DEVELOPERS LIMITED · PR1261012600258

MahaRERA · registration record · read 2 July 2026

Choose a report ↓

What does the RERA record show?

For THE WINDS PHASE-1, SECTOR 1B AT AVIAN VALLEY (PR1261012600258), 407 of 407 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

407 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Tower T1810081075.22–76.22 sq m≈ 810–820 sq ft
Tower T216500165064.53–66.52 sq m≈ 695–716 sq ft
Tower T316100161064.53–86.52 sq m≈ 695–931 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

407 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Tower T11076.22 sq m≈ 820 sq ftMarked unsoldNot stated
1002Tower T11076.22 sq m≈ 820 sq ftMarked unsoldNot stated
1003Tower T11075.22 sq m≈ 810 sq ftMarked unsoldNot stated
1004Tower T11076.22 sq m≈ 820 sq ftMarked unsoldNot stated
101Tower T1176.22 sq m≈ 820 sq ftMarked unsoldNot stated
102Tower T1176.22 sq m≈ 820 sq ftMarked unsoldNot stated
103Tower T1175.22 sq m≈ 810 sq ftMarked unsoldNot stated
104Tower T1176.22 sq m≈ 820 sq ftMarked unsoldNot stated
1101Tower T11176.22 sq m≈ 820 sq ftMarked unsoldNot stated
1102Tower T11176.22 sq m≈ 820 sq ftMarked unsoldNot stated
1103Tower T11175.22 sq m≈ 810 sq ftMarked unsoldNot stated
1104Tower T11176.22 sq m≈ 820 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Tower T1Excavation0.0%
Tower T1Basement (if any)0.0%
Tower T1Podiums (if any) 0.0%
Tower T1Plinth0.0%
Tower T1Stilt Floor 0.0%
Tower T1Slabs of Super Structure0.0%
Tower T1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower T1Sanitary Fittings within the flats / premises0.0%
Tower T1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower T1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower T1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower T2Excavation0.0%
Tower T2Basement (if any)0.0%
Tower T2Podiums (if any) 0.0%
Tower T2Plinth0.0%
Tower T2Stilt Floor 0.0%
Tower T2Slabs of Super Structure0.0%
Tower T2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower T2Sanitary Fittings within the flats / premises0.0%
Tower T2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower T2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower T2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower T3Excavation0.0%
Tower T3Basement (if any)0.0%
Tower T3Podiums (if any) 0.0%
Tower T3Plinth0.0%
Tower T3Stilt Floor 0.0%
Tower T3Slabs of Super Structure0.0%
Tower T3Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower T3Sanitary Fittings within the flats / premises0.0%
Tower T3Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower T3External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower T3Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PR1261012600258

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹845,376,823₹0₹1,972,545,921₹2,817,922,744
Actual raised₹132,379,881₹0₹0₹132,379,881

MahaRERA project filing · read 18 July 2026 · registration PR1261012600258

Documents named in the filing

  • Commencement certificate · 5 listed
  • Promoter PAN · 5 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 11 listed
  • Occupancy / completion certificate · 9 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 2 listed
  • Form 3 — CA certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PR1261012600258

Builder and past records

What else does the record show?

Projects registered under this company

KOLTE-PATIL DEVELOPERS LIMITED

49Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026 – 10 September 2026

Explore other registrations

Past records of sales and unsold homes

  1. 21 September 2026

    407 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA home list

  2. 12 September 2026

    407 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA home list

  3. 4 September 2026

    407 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA home list

  4. 18 July 2026

    407 marked unsold · 0 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 2 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.