The builder’s RERA record, explained
Classic Promoters and Builders Private Limited · P52100004877
For World One Solitaire World (P52100004877), 54 of 185 entries were marked unsold in the MahaRERA home list read 4 September 2026.
For World One Solitaire World, ₹13,234 per sq ft of carpet area is the median rate across 131 sold or booked entries with prices in the MahaRERA home list read 4 September 2026. These are historical agreement values, not current asking prices.
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹13,234/ sq ft carpet area
Across 131 sold or booked entries with reported prices. The middle 80% of rates fall between ₹11,212 and ₹17,241.
MahaRERA · per-home inventory · read 4 September 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
185 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · read 4 September 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Building -1 World One Up to 16th Floor | 101 | 79 | 0 | 22 | 0 | 99.50–222.13 sq m≈ 1,071–2,391 sq ft |
| Building -2 World One -17th to 30th FL | 84 | 52 | 0 | 32 | 0 | 99.50–222.13 sq m≈ 1,071–2,391 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · read 4 September 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001Building -1 World One Up to 16th Floor | 10 | 222.13 sq m≈ 2,391 sq ft | Sold | ₹41,223,397 | |
| 1002Building -1 World One Up to 16th Floor | 10 | 122.82 sq m≈ 1,322 sq ft | Marked unsold | Not stated | |
| 1003Building -1 World One Up to 16th Floor | 10 | 147.25 sq m≈ 1,585 sq ft | Sold | ₹18,723,215 | |
| 1004Building -1 World One Up to 16th Floor | 10 | 155.24 sq m≈ 1,671 sq ft | Sold | ₹18,386,885 | |
| 1005Building -1 World One Up to 16th Floor | 10 | 122.26 sq m≈ 1,316 sq ft | Sold | ₹25,251,750 | |
| 1006Building -1 World One Up to 16th Floor | 10 | 116.59 sq m≈ 1,255 sq ft | Sold | ₹21,058,816 | |
| 101Building -1 World One Up to 16th Floor | 1 | 222.13 sq m≈ 2,391 sq ft | Marked unsold | Not stated | |
| 102Building -1 World One Up to 16th Floor | 1 | 122.82 sq m≈ 1,322 sq ft | Marked unsold | Not stated | |
| 103Building -1 World One Up to 16th Floor | 1 | 147.25 sq m≈ 1,585 sq ft | Sold | ₹23,978,125 | |
| 104Building -1 World One Up to 16th Floor | 1 | 155.24 sq m≈ 1,671 sq ft | Sold | ₹19,384,001 | |
| 105Building -1 World One Up to 16th Floor | 1 | 122.26 sq m≈ 1,316 sq ft | Marked unsold | Not stated | |
| 106Building -1 World One Up to 16th Floor | 1 | 116.59 sq m≈ 1,255 sq ft | Sold | ₹16,304,829 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹1,251,828,015 of an estimated ₹1,340,630,966 was reported as incurred (93.4%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 18 July 2026 · registration P52100004877
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Building -1 World One Up to 16th Floor | Excavation | 100.0% |
| Building -1 World One Up to 16th Floor | Basement (if any) | 100.0% |
| Building -1 World One Up to 16th Floor | Podiums (if any) | 100.0% |
| Building -1 World One Up to 16th Floor | Plinth | 100.0% |
| Building -1 World One Up to 16th Floor | Stilt Floor | 0.0% |
| Building -1 World One Up to 16th Floor | Slabs of Super Structure | 100.0% |
| Building -1 World One Up to 16th Floor | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building -1 World One Up to 16th Floor | Sanitary Fittings within the flats / premises | 0.0% |
| Building -1 World One Up to 16th Floor | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 99.0% |
| Building -1 World One Up to 16th Floor | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 99.0% |
| Building -1 World One Up to 16th Floor | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97.0% |
| Building -2 World One -17th to 30th FL | Excavation | 100.0% |
| Building -2 World One -17th to 30th FL | Basement (if any) | 100.0% |
| Building -2 World One -17th to 30th FL | Podiums (if any) | 100.0% |
| Building -2 World One -17th to 30th FL | Plinth | 100.0% |
| Building -2 World One -17th to 30th FL | Stilt Floor | 0.0% |
| Building -2 World One -17th to 30th FL | Slabs of Super Structure | 100.0% |
| Building -2 World One -17th to 30th FL | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98.0% |
| Building -2 World One -17th to 30th FL | Sanitary Fittings within the flats / premises | 0.0% |
| Building -2 World One -17th to 30th FL | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 98.0% |
| Building -2 World One -17th to 30th FL | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 96.0% |
| Building -2 World One -17th to 30th FL | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 96.0% |
| Building 3 | Excavation | 0.0% |
| Building 3 | Basement (if any) | 0.0% |
| Building 3 | Podiums (if any) | 0.0% |
| Building 3 | Plinth | 0.0% |
| Building 3 | Stilt Floor | 0.0% |
| Building 3 | Slabs of Super Structure | 0.0% |
| Building 3 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Building 3 | Sanitary Fittings within the flats / premises | 0.0% |
| Building 3 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Building 3 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Building 3 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 18 July 2026 · registration P52100004877
| Revised target | Reason given by the builder |
|---|---|
| 29 December 2024 | due to the COVID-19 pandemic, we faced several challenges that adversely affected the construction activities and the sales of the project. Some of these challenges were: • Lack of availability of labour contractors as many of them migrated back to their native places during the lockdown. • Disruption of supply chain of essential construction materials such as cement, steel, sand, etc. • Poor market condition reduced the demand and sales of residential properties and affected our cash flow and liquidity. These factors were beyond our control and caused a significant delay in the completion of the project. We have already resumed the construction work after the reopening of lockdown, but the impact of this has caused a slowdown in construction and slow bookings of units. |
| 31 December 2025 | 1. We Classic Promoters and Builders Private Limited are developing the said Project which is part of a larger layout. 2. We state that the construction and development of the said Project got delayed due to the fact that after commencement of construction of the same, we faced numerous challenges as the Project layout was unforeseeably surrounded with the illegal huts and slum encroachments which were causing obstruction and unwarranted delays in carrying out smooth construction activities. We state that to deal with the same, we faced a lot of inconvenience and removing the illegal encroachments took considerable time, effort and resources all causing and leading to delay in construction and timely completion of the said Project. We state that the said issue of encroachments and encroachers still persist in part of the said Project layout, and we are tirelessly working towards resolution of the same so as to ensure expedited completion of the said Project. 3. The photographs showing the slums and encroachment around the layout of the said Project is herewith. 4. Furthermore, for completing finishing work of said Project, we had appointed a contractor B. D. Mistry and Company (‘Contractor’) by virtue of execution of Contract Agreement dated 22nd December’ 2022, wherein the said Contractor was onboarded for said finishing work for agreed sum of Rs. 24,02,12,888.89/-. However, despite of follow-ups and escalations from our end to comply with the terms of Contract Agreement, the Contractor failed to abide by the timelines set for completion of said finishing work, which led to delay in meeting the timelines of the said Project. 5. As on date the Project is 75% complete and for completion of the said project in all respects, we would require an extension of one year which extension is consistent with the extension granted for the World Plaza- Solitaire World Project. 6. In light of the same, we humbly request you to grant us an extension of 1 (One) Year till 31-12-2025 for the completion of the project as per the provision under Section 6 of The Real Estate (Regulation and Development) Act, 2016 and MahaRERA Rules, 2017. 7. We assure you that we have taken all the necessary measures to mitigate the impact of delay and expedite the construction work and the sales of the project. Thank you for your attention to this matter. We look forward to a positive response from the MahaRERA Authority at your earliest convenience. |
| 31 December 2026 | As per order of the Hon'ble Chairman (MahaRERA) Dated 09/03/2026 we request you kindly to grant us extension till 31/12/2026. |
MahaRERA project filing · read 18 July 2026 · registration P52100004877
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹721,807,900 | ₹606,000,000 | ₹1,698,100,821 | ₹3,025,908,721 |
| Actual raised | ₹52,354 | ₹356,210,222 | ₹1,743,545,141 | ₹2,099,807,717 |
MahaRERA project filing · read 18 July 2026 · registration P52100004877
35 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 18 July 2026 · registration P52100004877
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 18 July 2026 · registration P52100004877
Builder and past records
Projects registered under this company
15Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
22 September 2026
54 marked unsold · 131 sold · 0 booked.
Saved MahaRERA home list
13 September 2026
54 marked unsold · 131 sold · 0 booked.
Saved MahaRERA home list
4 September 2026
54 marked unsold · 131 sold · 0 booked.
Saved MahaRERA home list
18 July 2026
54 marked unsold · 128 sold · 3 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Bibwewadi · Pune
P52100050511
25 of 127 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Bibwewadi · Pune
P52100022645
561 of 1317 entries marked unsold
MahaRERA · per-home inventory · read 8 September 2026
View project details →Bibwewadi · Pune
P52100078873
150 of 256 entries marked unsold
MahaRERA · per-home inventory · read 11 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · read 4 September 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100004877 ↗