The builder’s RERA record, explained

AMRUTKALASH

AMRUTKALASH PROPERTIES · P52100004921

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For AMRUTKALASH (P52100004921), 101 of 164 entries were marked unsold in the MahaRERA home list read 4 September 2026.

MahaRERA · per-home inventory · read 4 September 2026

For AMRUTKALASH, ₹3,946 per sq ft of carpet area is the median rate across 63 sold or booked entries with prices in the MahaRERA home list read 4 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹3,946/ sq ft carpet area

Across 63 sold or booked entries with reported prices. The middle 80% of rates fall between ₹3,197 and ₹5,533.

MahaRERA · per-home inventory · read 4 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

164 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
A520052035.55–51.66 sq m≈ 383–556 sq ft
B565600035.57–49.74 sq m≈ 383–535 sq ft
C567049035.55–51.66 sq m≈ 383–556 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

164 listed entries

MahaRERA · per-home inventory · read 4 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
101A151.66 sq m≈ 556 sq ftMarked unsoldNot stated
102A137.75 sq m≈ 406 sq ftMarked unsoldNot stated
103A137.75 sq m≈ 406 sq ftMarked unsoldNot stated
104A151.66 sq m≈ 556 sq ftMarked unsoldNot stated
105A149.64 sq m≈ 534 sq ftMarked unsoldNot stated
106A135.55 sq m≈ 383 sq ftMarked unsoldNot stated
107A135.55 sq m≈ 383 sq ftMarked unsoldNot stated
108A149.64 sq m≈ 534 sq ftMarked unsoldNot stated
201A251.66 sq m≈ 556 sq ftMarked unsoldNot stated
202A237.75 sq m≈ 406 sq ftMarked unsoldNot stated
203A237.75 sq m≈ 406 sq ftMarked unsoldNot stated
204A251.66 sq m≈ 556 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹98,529,010 of an estimated ₹173,250,000 was reported as incurred (56.9%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100004921

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
CExcavation100.0%
CBasement (if any)100.0%
CPodiums (if any) 0.0%
CPlinth0.0%
CStilt Floor 0.0%
CSlabs of Super Structure70.0%
CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45.0%
CSanitary Fittings within the flats / premises0.0%
CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BExcavation100.0%
BBasement (if any)100.0%
BPodiums (if any) 0.0%
BPlinth100.0%
BStilt Floor 0.0%
BSlabs of Super Structure100.0%
BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BSanitary Fittings within the flats / premises100.0%
BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98.0%
BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70.0%
AExcavation100.0%
ABasement (if any)0.0%
APodiums (if any) 0.0%
APlinth0.0%
AStilt Floor 0.0%
ASlabs of Super Structure0.0%
AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
ASanitary Fittings within the flats / premises0.0%
AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration P52100004921

Reported deadline extensions

Revised targetReason given by the builder
31 December 2025Amrutkalash Properties project was Registered with Rera No.P52100004921 the said project sanctioned by PMRDA on 11.07. 2017 due to post demonetization. The construction was started in 2018. There was slow booking hence, only one building i.e. 'B' Building (56 Flats ) started and it is now under completion. Building 'A' (52flats)and building 'C' (56flats) construction not started and also booking not taken for 'A' and 'C' building. Due to Covid 2019 and because of labour problem construction could not done in 2019- 2020 for building B. Now, we require extension for 'A' and 'C' building till March 2025.and for under construction building B till MARCH 2023. We have obtained consent of 53% Flat purchasers (31 out of 38 sold flats in 'B' building. Kindly consider our extension request.
31 December 2027The Project Registration Certificate was obtained in 2017, due to post demonetization Booking of the Units were slow and same was continued in Covid-19 and post pandemic till 2020-2021 as the Project is in Rural / Suburban Area in Pune. Unfortunately, one of the Partner died in November 2021 and due to financial difficulties, the project construction work was slowed down. That as on date we have completed 90 percent work for Building B in the Project and we are also in process of obtaining Completion Certificate for B Building from the Local Authority i.e. Pune Metropolitan Region Development Authority (PMRDA). The construction work for C Building has been commenced from 2023 and more than 50 percent work of said Building is completed. The A Building is also under construction and we will complete it by the proposed Extension Date of Completion i.e. 31st December 2027. Therefore we Request you to consider our Date for Project Extension Request and grant us Project Extension Certificate for Completion of the Project.

MahaRERA project filing · read 18 July 2026 · registration P52100004921

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹64,280,000₹24,000,000₹120,000,000₹223,280,000
Actual raised₹56,921,440₹0₹79,383,087₹136,304,527

MahaRERA project filing · read 18 July 2026 · registration P52100004921

Quarterly filing record

38 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 18 July 2026 · registration P52100004921

Documents named in the filing

  • Promoter PAN · 4 listed
  • Form 1 — Architect's certificate · 3 listed
  • Form 3 — CA certificate · 2 listed
  • Form 2 — Engineer's certificate · 2 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100004921

Builder and past records

What else does the record show?

Projects registered under this company

AMRUTKALASH PROPERTIES

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 22 September 2026

      101 marked unsold · 63 sold · 0 booked.

      Saved MahaRERA home list

    2. 13 September 2026

      101 marked unsold · 63 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      101 marked unsold · 63 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      104 marked unsold · 60 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · read 4 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100004921 ↗