Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
M/s Pacific Orient Genesis Associates · P52100007941
For Engracia B C E F (P52100007941), 0 of 140 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Engracia B C E F, ₹2,707 per sq ft of carpet area is the median rate across 140 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹2,707/ sq ft carpet area
Across 140 sold or booked entries with reported prices. The middle 80% of rates fall between ₹2,057 and ₹6,056.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
140 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| B BUILDING | 42 | 23 | 19 | 0 | 0 | 99.10–110.82 sq m≈ 1,067–1,193 sq ft |
| C BUILDING | 28 | 19 | 9 | 0 | 0 | 110.82–166.44 sq m≈ 1,193–1,792 sq ft |
| E BUILDING | 42 | 19 | 23 | 0 | 0 | 99.10–110.82 sq m≈ 1,067–1,193 sq ft |
| F BUILDING | 28 | 19 | 9 | 0 | 0 | 110.28–147.68 sq m≈ 1,187–1,590 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| B-101B BUILDING | 1 | 99.1 sq m≈ 1,067 sq ft | Booked | ₹7,234,500 | |
| B-102B BUILDING | 1 | 99.1 sq m≈ 1,067 sq ft | Booked | ₹7,234,500 | |
| B-103B BUILDING | 1 | 99.1 sq m≈ 1,067 sq ft | Booked | ₹7,234,500 | |
| B-104B BUILDING | 1 | 99.1 sq m≈ 1,067 sq ft | Booked | ₹7,234,500 | |
| B-105B BUILDING | 1 | 99.1 sq m≈ 1,067 sq ft | Sold | ₹7,234,500 | |
| B-106B BUILDING | 1 | 99.1 sq m≈ 1,067 sq ft | Booked | ₹7,234,500 | |
| B-201B BUILDING | 2 | 110.82 sq m≈ 1,193 sq ft | Sold | ₹7,928,825 | |
| B-202B BUILDING | 2 | 110.82 sq m≈ 1,193 sq ft | Booked | ₹7,928,825 | |
| B-203B BUILDING | 2 | 110.82 sq m≈ 1,193 sq ft | Sold | ₹7,928,825 | |
| B-204B BUILDING | 2 | 110.82 sq m≈ 1,193 sq ft | Sold | ₹7,928,825 | |
| B-205B BUILDING | 2 | 110.82 sq m≈ 1,193 sq ft | Sold | ₹7,928,825 | |
| B-206B BUILDING | 2 | 110.82 sq m≈ 1,193 sq ft | Sold | ₹5,200,000 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹562,778,646 of an estimated ₹742,329,417 was reported as incurred (75.8%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 18 July 2026 · registration P52100007941
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| E BUILDING | Excavation | 100.0% |
| E BUILDING | Basement (if any) | 100.0% |
| E BUILDING | Podiums (if any) | 0.0% |
| E BUILDING | Plinth | 100.0% |
| E BUILDING | Stilt Floor | 100.0% |
| E BUILDING | Slabs of Super Structure | 100.0% |
| E BUILDING | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 86.0% |
| E BUILDING | Sanitary Fittings within the flats / premises | 30.0% |
| E BUILDING | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 84.0% |
| E BUILDING | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85.0% |
| E BUILDING | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30.0% |
| C BUILDING | Excavation | 100.0% |
| C BUILDING | Basement (if any) | 100.0% |
| C BUILDING | Podiums (if any) | 30.0% |
| C BUILDING | Plinth | 100.0% |
| C BUILDING | Stilt Floor | 100.0% |
| C BUILDING | Slabs of Super Structure | 100.0% |
| C BUILDING | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 88.0% |
| C BUILDING | Sanitary Fittings within the flats / premises | 30.0% |
| C BUILDING | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 77.0% |
| C BUILDING | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95.0% |
| C BUILDING | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35.0% |
| F BUILDING | Excavation | 100.0% |
| F BUILDING | Basement (if any) | 100.0% |
| F BUILDING | Podiums (if any) | 0.0% |
| F BUILDING | Plinth | 100.0% |
| F BUILDING | Stilt Floor | 100.0% |
| F BUILDING | Slabs of Super Structure | 100.0% |
| F BUILDING | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90.0% |
| F BUILDING | Sanitary Fittings within the flats / premises | 30.0% |
| F BUILDING | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85.0% |
| F BUILDING | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95.0% |
| F BUILDING | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 35.0% |
| B BUILDING | Excavation | 100.0% |
| B BUILDING | Basement (if any) | 100.0% |
| B BUILDING | Podiums (if any) | 30.0% |
| B BUILDING | Plinth | 100.0% |
| B BUILDING | Stilt Floor | 100.0% |
| B BUILDING | Slabs of Super Structure | 100.0% |
| B BUILDING | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 79.0% |
| B BUILDING | Sanitary Fittings within the flats / premises | 30.0% |
| B BUILDING | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 64.0% |
| B BUILDING | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85.0% |
| B BUILDING | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30.0% |
MahaRERA project filing · read 18 July 2026 · registration P52100007941
| Revised target | Reason given by the builder |
|---|---|
| 29 December 2024 | Due to the death of one promoter, the project has been stalled, but now the remaining promoters are restarting it. Construction is almost complete we will require 12 months for project completion. |
| 31 December 2025 | The unexpected rise in raw material costs, driven by inflation and heightened demand, has created significant financial challenges for the developer. To manage this issue, the developer has been forced to renegotiate contracts, explore alternative materials, and secure additional funding. These escalating material costs have resulted in budget overruns, causing a shortage of funds and further contributing to delays in the construction schedule. |
| 31 December 2026 | We would like to submit that the construction schedule of the project has been significantly impacted due to various genuine and unavoidable circumstances beyond the control of the promoter. These factors have cumulatively led to delays in the timely execution of the project as originally planned. The key reasons are detailed below: Disruption in Supply Chain and Delay in Procurement of Construction Materials: One of the primary causes of delay has been the disruption in the supply chain of essential construction materials such as cement, steel, sand, aggregates, plumbing components, electrical fittings, and finishing materials. The post-pandemic global and domestic logistical constraints have caused a considerable increase in lead times for procurement. Additionally, local market shortages and continuous price volatility of these key materials have further compounded the issue, leading to intermittent halts in construction activities. The irregular availability and unpredictability in costs have made it extremely challenging to adhere to the original construction timelines. Labour Shortage – Skilled and Unskilled Workforce: The project also encountered a consistent shortage of both skilled and unskilled labour. Due to reverse migration during the pandemic and an overall labour market imbalance in the construction sector, retaining a stable and sufficient workforce became increasingly difficult. Frequent attrition, increased wage demands, and limited availability of trained manpower adversely affected the pace and continuity of construction work. The labour shortfall directly impacted civil works, finishing activities, and other critical on-site operations. Price Escalation and Cost Overruns: The sudden and steep escalation in the cost of construction materials and labour wages resulted in substantial budgetary pressure. These unforeseen financial burdens led to cash flow mismatches, thereby impacting the timely mobilisation of vendors and contractors. While efforts were made to manage these cost escalations through re-negotiations and re-scheduling of work packages, the overall progress was affected. |
MahaRERA project filing · read 18 July 2026 · registration P52100007941
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹501,884,226 | ₹0 | ₹364,031,806 | ₹865,916,032 |
| Actual raised | ₹338,384,178 | ₹0 | ₹193,204,332 | ₹531,588,510 |
MahaRERA project filing · read 18 July 2026 · registration P52100007941
36 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.
MahaRERA project filing · read 18 July 2026 · registration P52100007941
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 18 July 2026 · registration P52100007941
Builder and past records
Projects registered under this company
1Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
22 September 2026
0 marked unsold · 80 sold · 60 booked.
Saved MahaRERA home list
13 September 2026
0 marked unsold · 80 sold · 60 booked.
Saved MahaRERA home list
4 September 2026
0 marked unsold · 80 sold · 60 booked.
Saved MahaRERA home list
18 July 2026
0 marked unsold · 80 sold · 60 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Pune · Pune
P52100077822
204 of 264 entries marked unsold
MahaRERA · per-home inventory · read 28 September 2026
View project details →Pune · Pune
P52100050290
88 of 128 entries marked unsold
MahaRERA · per-home inventory · read 10 September 2026
View project details →Pune · Pune
P52100027363
17 of 181 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100007941 ↗