The builder’s RERA record, explained

addressOne - Phase 1

Peninsula Land Limited · P52100015756

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For addressOne - Phase 1 (P52100015756), 3 of 254 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).

MahaRERA · per-unit inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

254 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
Building 1222200011.46–25.50 sq m≈ 123–274 sq ft
Building 10201901022.50–25.50 sq m≈ 242–274 sq ft
Building 11202000022.50–25.50 sq m≈ 242–274 sq ft
Building 12202000022.50–25.50 sq m≈ 242–274 sq ft
Building 2212100011.46–25.50 sq m≈ 123–274 sq ft
Building 3212001011.46–25.50 sq m≈ 123–274 sq ft
Building 4222200011.46–25.50 sq m≈ 123–274 sq ft
Building 5222200011.46–25.50 sq m≈ 123–274 sq ft
Building 6222101011.46–25.50 sq m≈ 123–274 sq ft
Building 7222200011.46–25.50 sq m≈ 123–274 sq ft
Building 8222200011.46–25.50 sq m≈ 123–274 sq ft
Building 9202000022.50–25.50 sq m≈ 242–274 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

254 listed entries

MahaRERA · per-unit inventory · saved-file date 18 July 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
001Building 1 / Wing NA20525.5 sq m≈ 274 sq ft · RERA carpet areaSoldNot stated
002Building 1 / Wing NA20525.5 sq m≈ 274 sq ft · RERA carpet areaSoldNot stated
01Building 1 / Wing NA20511.46 sq m≈ 123 sq ft · RERA carpet areaSoldNot stated
02Building 1 / Wing NA20513.97 sq m≈ 150 sq ft · RERA carpet areaSoldNot stated
03Building 1 / Wing NA20513.97 sq m≈ 150 sq ft · RERA carpet areaSoldNot stated
04Building 1 / Wing NA20511.46 sq m≈ 123 sq ft · RERA carpet areaSoldNot stated
101Building 1 / Wing NA122.5 sq m≈ 242 sq ft · RERA carpet areaSoldNot stated
102Building 1 / Wing NA122.72 sq m≈ 245 sq ft · RERA carpet areaSoldNot stated
103Building 1 / Wing NA122.72 sq m≈ 245 sq ft · RERA carpet areaSoldNot stated
104Building 1 / Wing NA122.5 sq m≈ 242 sq ft · RERA carpet areaSoldNot stated
201Building 1 / Wing NA222.5 sq m≈ 242 sq ft · RERA carpet areaSoldNot stated
202Building 1 / Wing NA222.72 sq m≈ 245 sq ft · RERA carpet areaSoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹139,127,394 of an estimated ₹157,874,763 was reported as incurred (88.1%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration P52100015756

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Building 1Excavation100.0%
Building 1Basement (if any)100.0%
Building 1Podiums (if any) 0.0%
Building 1Plinth100.0%
Building 1Stilt Floor 0.0%
Building 1Slabs of Super Structure100.0%
Building 1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Building 1Sanitary Fittings within the flats / premises26.0%
Building 1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82.0%
Building 1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 2Excavation100.0%
Building 2Basement (if any)100.0%
Building 2Podiums (if any) 0.0%
Building 2Plinth100.0%
Building 2Stilt Floor 0.0%
Building 2Slabs of Super Structure100.0%
Building 2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Building 2Sanitary Fittings within the flats / premises26.0%
Building 2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82.0%
Building 2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 3Excavation100.0%
Building 3Basement (if any)100.0%
Building 3Podiums (if any) 0.0%
Building 3Plinth100.0%
Building 3Stilt Floor 0.0%
Building 3Slabs of Super Structure100.0%
Building 3Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Building 3Sanitary Fittings within the flats / premises26.0%
Building 3Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82.0%
Building 3External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 3Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 4Excavation100.0%
Building 4Basement (if any)100.0%
Building 4Podiums (if any) 0.0%
Building 4Plinth100.0%
Building 4Stilt Floor 0.0%
Building 4Slabs of Super Structure100.0%
Building 4Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Building 4Sanitary Fittings within the flats / premises26.0%
Building 4Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82.0%
Building 4External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 4Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 5Excavation100.0%
Building 5Basement (if any)100.0%
Building 5Podiums (if any) 0.0%
Building 5Plinth100.0%
Building 5Stilt Floor 0.0%
Building 5Slabs of Super Structure100.0%
Building 5Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Building 5Sanitary Fittings within the flats / premises26.0%
Building 5Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks82.0%
Building 5External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 5Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 6Excavation100.0%
Building 6Basement (if any)100.0%
Building 6Podiums (if any) 0.0%
Building 6Plinth100.0%
Building 6Stilt Floor 0.0%
Building 6Slabs of Super Structure100.0%
Building 6Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97.0%
Building 6Sanitary Fittings within the flats / premises76.0%
Building 6Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building 6External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 6Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 7Excavation100.0%
Building 7Basement (if any)100.0%
Building 7Podiums (if any) 0.0%
Building 7Plinth100.0%
Building 7Stilt Floor 0.0%
Building 7Slabs of Super Structure100.0%
Building 7Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97.0%
Building 7Sanitary Fittings within the flats / premises76.0%
Building 7Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building 7External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 7Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 8Excavation100.0%
Building 8Basement (if any)100.0%
Building 8Podiums (if any) 0.0%
Building 8Plinth100.0%
Building 8Stilt Floor 0.0%
Building 8Slabs of Super Structure100.0%
Building 8Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
Building 8Sanitary Fittings within the flats / premises13.0%
Building 8Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72.0%
Building 8External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 8Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.79.0%
Building 9Excavation100.0%
Building 9Basement (if any)100.0%
Building 9Podiums (if any) 0.0%
Building 9Plinth100.0%
Building 9Stilt Floor 0.0%
Building 9Slabs of Super Structure100.0%
Building 9Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97.0%
Building 9Sanitary Fittings within the flats / premises76.0%
Building 9Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building 9External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 9Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 10Excavation100.0%
Building 10Basement (if any)100.0%
Building 10Podiums (if any) 0.0%
Building 10Plinth100.0%
Building 10Stilt Floor 0.0%
Building 10Slabs of Super Structure100.0%
Building 10Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99.0%
Building 10Sanitary Fittings within the flats / premises76.0%
Building 10Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building 10External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 10Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 11Excavation100.0%
Building 11Basement (if any)100.0%
Building 11Podiums (if any) 0.0%
Building 11Plinth100.0%
Building 11Stilt Floor 0.0%
Building 11Slabs of Super Structure100.0%
Building 11Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99.0%
Building 11Sanitary Fittings within the flats / premises76.0%
Building 11Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building 11External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 11Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%
Building 12Excavation100.0%
Building 12Basement (if any)100.0%
Building 12Podiums (if any) 0.0%
Building 12Plinth100.0%
Building 12Stilt Floor 0.0%
Building 12Slabs of Super Structure100.0%
Building 12Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises99.0%
Building 12Sanitary Fittings within the flats / premises76.0%
Building 12Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
Building 12External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.94.0%
Building 12Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.84.0%

MahaRERA project filing · read 18 July 2026 · registration P52100015756

Quarterly filing record

20 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration P52100015756

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration P52100015756

Builder and past records

What else does the record show?

Projects registered under this company

Peninsula Land Limited

12Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026 – 12 July 2026

Explore other registrations

Past records of sales and unsold units

  1. 25 September 2026

    3 marked unsold · 251 sold · 0 booked.

    Saved MahaRERA unit list

  2. 17 September 2026

    3 marked unsold · 251 sold · 0 booked.

    Saved MahaRERA unit list

  3. 8 September 2026

    3 marked unsold · 251 sold · 0 booked.

    Saved MahaRERA unit list

  4. 18 July 2026

    3 marked unsold · 251 sold · 0 booked.

    Saved MahaRERA unit list

These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

Project Comparison Report

Which project should you buy in?
And which unit?

Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-unit inventory · saved-file date 18 July 2026

This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

The unit-list date is based on the saved file’s details.

Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100015756 ↗