For addressOne - Phase 6 (P52100018788), 0 of 200 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For addressOne - Phase 6, ₹6,039 per sq ft of carpet area is the median rate across 200 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
This target date has passed. The record shown here does not confirm whether the project is complete or has received more time.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹6,039/ sq ft carpet area
Across 200 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,576 and ₹6,556.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
200 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Building 66 | 20 | 20 | 0 | 0 | 0 | 29.79–44.50 sq m≈ 321–479 sq ft |
| Building 67 | 20 | 20 | 0 | 0 | 0 | 29.83–44.53 sq m≈ 321–479 sq ft |
| Building 68 | 20 | 20 | 0 | 0 | 0 | 29.83–44.53 sq m≈ 321–479 sq ft |
| Building 69 | 20 | 20 | 0 | 0 | 0 | 29.79–44.50 sq m≈ 321–479 sq ft |
| Building 70 | 20 | 20 | 0 | 0 | 0 | 33.26–35.99 sq m≈ 358–387 sq ft |
| Building 71 | 20 | 20 | 0 | 0 | 0 | 33.26–35.99 sq m≈ 358–387 sq ft |
| Building 72 | 20 | 20 | 0 | 0 | 0 | 33.26–35.99 sq m≈ 358–387 sq ft |
| Building 73 | 20 | 20 | 0 | 0 | 0 | 33.26–35.99 sq m≈ 358–387 sq ft |
| Building 77 | 20 | 20 | 0 | 0 | 0 | 56.96–60.62 sq m≈ 613–653 sq ft |
| Building 78 | 20 | 20 | 0 | 0 | 0 | 56.96–60.62 sq m≈ 613–653 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 001Building 66 | 205 | 41.55 sq m≈ 447 sq ft | Sold | ₹2,661,180 | |
| 002Building 66 | 205 | 29.79 sq m≈ 321 sq ft | Sold | ₹1,922,520 | |
| 003Building 66 | 205 | 41.55 sq m≈ 447 sq ft | Sold | ₹2,742,680 | |
| 004Building 66 | 205 | 41.55 sq m≈ 447 sq ft | Sold | ₹2,667,230 | |
| 101Building 66 | 1 | 44.5 sq m≈ 479 sq ft | Sold | ₹3,017,221 | |
| 102Building 66 | 1 | 44.5 sq m≈ 479 sq ft | Sold | ₹2,982,686 | |
| 103Building 66 | 1 | 44.5 sq m≈ 479 sq ft | Sold | ₹2,670,970 | |
| 104Building 66 | 1 | 44.5 sq m≈ 479 sq ft | Sold | ₹2,866,070 | |
| 201Building 66 | 2 | 44.3 sq m≈ 477 sq ft | Sold | ₹3,263,265 | |
| 202Building 66 | 2 | 44.3 sq m≈ 477 sq ft | Sold | ₹2,998,348 | |
| 203Building 66 | 2 | 44.3 sq m≈ 477 sq ft | Sold | ₹2,846,695 | |
| 204Building 66 | 2 | 44.3 sq m≈ 477 sq ft | Sold | ₹2,878,970 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹190,690,299 of an estimated ₹190,690,299 was reported as incurred (100.0%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100018788
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Building 66 | Excavation | 100.0% |
| Building 66 | Basement (if any) | 100.0% |
| Building 66 | Podiums (if any) | 0.0% |
| Building 66 | Plinth | 100.0% |
| Building 66 | Stilt Floor | 0.0% |
| Building 66 | Slabs of Super Structure | 100.0% |
| Building 66 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 66 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 66 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 66 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 66 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 67 | Excavation | 100.0% |
| Building 67 | Basement (if any) | 100.0% |
| Building 67 | Podiums (if any) | 0.0% |
| Building 67 | Plinth | 100.0% |
| Building 67 | Stilt Floor | 0.0% |
| Building 67 | Slabs of Super Structure | 100.0% |
| Building 67 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 67 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 67 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 67 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 67 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 68 | Excavation | 100.0% |
| Building 68 | Basement (if any) | 100.0% |
| Building 68 | Podiums (if any) | 0.0% |
| Building 68 | Plinth | 100.0% |
| Building 68 | Stilt Floor | 0.0% |
| Building 68 | Slabs of Super Structure | 100.0% |
| Building 68 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 68 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 68 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 68 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 68 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 69 | Excavation | 100.0% |
| Building 69 | Basement (if any) | 100.0% |
| Building 69 | Podiums (if any) | 0.0% |
| Building 69 | Plinth | 100.0% |
| Building 69 | Stilt Floor | 0.0% |
| Building 69 | Slabs of Super Structure | 100.0% |
| Building 69 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 69 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 69 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 69 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 69 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 70 | Excavation | 100.0% |
| Building 70 | Basement (if any) | 100.0% |
| Building 70 | Podiums (if any) | 0.0% |
| Building 70 | Plinth | 100.0% |
| Building 70 | Stilt Floor | 0.0% |
| Building 70 | Slabs of Super Structure | 100.0% |
| Building 70 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 70 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 70 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 70 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 70 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 71 | Excavation | 100.0% |
| Building 71 | Basement (if any) | 100.0% |
| Building 71 | Podiums (if any) | 0.0% |
| Building 71 | Plinth | 100.0% |
| Building 71 | Stilt Floor | 0.0% |
| Building 71 | Slabs of Super Structure | 100.0% |
| Building 71 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 71 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 71 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 71 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 71 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 72 | Excavation | 100.0% |
| Building 72 | Basement (if any) | 100.0% |
| Building 72 | Podiums (if any) | 0.0% |
| Building 72 | Plinth | 100.0% |
| Building 72 | Stilt Floor | 0.0% |
| Building 72 | Slabs of Super Structure | 100.0% |
| Building 72 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 72 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 72 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 72 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 72 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 73 | Excavation | 100.0% |
| Building 73 | Basement (if any) | 100.0% |
| Building 73 | Podiums (if any) | 0.0% |
| Building 73 | Plinth | 100.0% |
| Building 73 | Stilt Floor | 0.0% |
| Building 73 | Slabs of Super Structure | 100.0% |
| Building 73 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 73 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 73 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 73 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 73 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 77 | Excavation | 100.0% |
| Building 77 | Basement (if any) | 100.0% |
| Building 77 | Podiums (if any) | 0.0% |
| Building 77 | Plinth | 100.0% |
| Building 77 | Stilt Floor | 0.0% |
| Building 77 | Slabs of Super Structure | 100.0% |
| Building 77 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 77 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 77 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 77 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 77 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| Building 78 | Excavation | 100.0% |
| Building 78 | Basement (if any) | 100.0% |
| Building 78 | Podiums (if any) | 0.0% |
| Building 78 | Plinth | 100.0% |
| Building 78 | Stilt Floor | 0.0% |
| Building 78 | Slabs of Super Structure | 100.0% |
| Building 78 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| Building 78 | Sanitary Fittings within the flats / premises | 100.0% |
| Building 78 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| Building 78 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| Building 78 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100018788
| Revised target | Reason given by the builder |
|---|---|
| 30 June 2025 | a) The said Project is a part of the larger layout/phase-wise development having phases 1-6. The original amended Environmental Clearance for larger layout including the Phase 6 was obtained on 10/01/2019. However, due to the impact of the COVID-19 pandemic, subsequent permissions for all the phases were significantly delayed. As a result, the revalidation of consent to operate permission could only be obtained in May 2022 for phase 1 to 4. Therefore, the consent to operate for the remaining phases i.e. Phase 5 and phase 6 experienced a delay. b) The Vendor- M/s Tricon Infra Buidtech Pvt. Ltd, appointed by the Promoter for completion of Building & Infra work faced challenges in deployment of specific material and manpower as per schedule timeline, which had an adverse effect on the timely completion of the said Project. The Promoter de-scoped some activities from the vendor and appointed other vendors to achieve the completion timeline of the said Project. Moreover, the vendor has not completed the shell & core work of STP which caused the delay in completion of STP MEP work. c) Further, the Vendor- M/s Eros Elevators & Escalators Pvt. Ltd, appointed by the Promoter faced challenges in procuring specific lift parts, which had a cascading effect on the timely completion of the said Project. The complexities of obtaining specific lift parts were hindered by unforeseen issues in the supply chain. This, in turn, created an obstacle in the procurement process and subsequently hampered our ability to secure the necessary PWD license for the lifts. The interdependence of these factors has played a major role and has delayed the construction timeline of the said Project. d) Another vendor, M/s Om Aluminium and Glass appointed by the Promoter encountered issue with respect to working capital. The repercussions were prominent in the procurement process for essential materials such as glass and aluminium frames. The delay in procuring these materials slowed down the construction pace of the said Project. The above-mentioned challenges have collectively contributed to the unforeseen delays in the said Project completion timelines. |
| 30 June 2026 | In Project Certificate No. P52100018788 and Extension Application No. EA10112518294 , application is filed under Section 7(3) of the MahaRERA Act, read with Order No. 40 of 2022. Please find attached herewith the Order passed by the Hon. Chairperson, MahaRERA, granting extension from 01.07.2025 to 30.06.2026, vide Order Regulatory Case No. 432 of 2025, in respect of addressOne Phase 6. The same is enclosed at Sr. No. 10 for your reference. we have uploaded the QPR upto December 2025 in the system. |
MahaRERA project filing · read 19 July 2026 · registration P52100018788
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹0 | ₹164,187,674 | ₹218,395,474 | ₹382,583,148 |
| Actual raised | ₹0 | ₹139,506,298 | ₹305,827,948 | ₹445,334,246 |
MahaRERA project filing · read 19 July 2026 · registration P52100018788
29 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100018788
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100018788
Builder and past records
Projects registered under this company
12Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 2 July 2026 – 12 July 2026
Past records of sales and unsold homes
26 September 2026
0 marked unsold · 200 sold · 0 booked.
Saved MahaRERA home list
17 September 2026
0 marked unsold · 200 sold · 0 booked.
Saved MahaRERA home list
8 September 2026
0 marked unsold · 200 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
0 marked unsold · 200 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.