What does the RERA record show?

For Vaarivana Phase A - 1 (P52100018391), 8 of 284 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Vaarivana Phase A - 1, ₹7,129 per sq ft of carpet area is the median rate across 276 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹7,129/ sq ft carpet area

Across 276 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,673 and ₹8,556.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

284 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
BUNGALOW NO A10011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A10111000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A10211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A10311000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A10411000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A10511000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A10611000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A10711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A10811000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A10911000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A11011000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A11111000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A11211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A11311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A11411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A11511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A11611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A11711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A11811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A11911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A12011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A12111000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A12211000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12311000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12411000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12511000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12811000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A12911000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A13011000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A13111000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A13211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A13311000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A13411000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A13511000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A13611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A13711000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A13811000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A13911000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A14011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A14111000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A14211000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A14311000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A14410010197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A14511000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A14611000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A14711000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A14810010197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A14910010197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A15011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A15111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A15211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A15311000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A15411000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A15511000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A15611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A15711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A15811000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A15911000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A16011000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A16111000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A16211000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A16311000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A16411000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A16511000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A16611000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A16711000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A16811000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A16911000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A17011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A17111000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A17210010152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A17311000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A17411000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A17511000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A17611000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A17711000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A17811000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A17911000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A18011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A18111000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A18211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A18311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A18411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A18511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A18611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A18711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A18811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A18911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A19011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A19111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A19211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A19311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A19411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A19511000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A19611000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A19711000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A19811000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A19911000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A20011000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A20111000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A20211000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A20311000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A20411000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A20511000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A20611000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A20711000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A20811000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A20911000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A21011000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A21111000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A21211000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A21311000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A21411000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A21511000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A21611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A21711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A21811000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A21911000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A22011000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A22111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A22211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A22311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A22411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A22511000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A22611000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A22711000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A22811000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A22911000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A23011000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A23111000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A23211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A23311000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A23411000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A23511000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A23611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A23711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A23811000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A23911000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A24011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A24111000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A24211000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A24311000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A24411000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A24511000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A24611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A24711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A24811000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A24911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A25011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A25111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A25211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A25311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A25411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A25511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A25611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A25711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A25811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A25911000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A26011000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A26111000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A35811000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A35911000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A36011000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A36111000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A36211000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A36311000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A36411000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A36511000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A36611000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A36711000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A36811000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A36911000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A37011000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A37111000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A37211000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A37310010156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A37411000150.90 sq m≈ 1,624 sq ft
BUNGALOW NO A37511000156.50 sq m≈ 1,685 sq ft
BUNGALOW NO A37610010198.14 sq m≈ 2,133 sq ft
BUNGALOW NO A37711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A37811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A37911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A38011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A38111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A38211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A38311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A38411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A38511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A38611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A38711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A38811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A38911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A39011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A39111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A39211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A39311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A39411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A39511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A39611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A39711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A39811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A39911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A40011000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A40111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A40211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A40311000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A40411000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A40511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A40611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A40711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A40811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A40911000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A41011000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A41111000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A41211000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A41311000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A41411000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A41511000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A41611000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A41711000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A41811000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A41911000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A42011000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A42111000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A42211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A42311000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A42411000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A42511000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A42611000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A42711000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A42811000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A42911000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A43011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A43111000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A43211000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A43311000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A43411000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A43511000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A43611000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A43711000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A43811000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A43911000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A44010010148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A44111000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A44211000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A44311000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A44411000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A44511000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A44611000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A44711000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A44811000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A44911000196.36 sq m≈ 2,114 sq ft
BUNGALOW NO A45011000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A45111000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A45211000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A45311000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A45410010197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A45511000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A45611000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A45711000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A45811000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A7911000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8011000154.40 sq m≈ 1,662 sq ft
BUNGALOW NO A8111000153.32 sq m≈ 1,650 sq ft
BUNGALOW NO A8211000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8311000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8411000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8511000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8611000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8711000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8811000197.80 sq m≈ 2,129 sq ft
BUNGALOW NO A8911000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A9011000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A9111000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A9211000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A9311000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A9411000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A9511000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A9611000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A9711000148.63 sq m≈ 1,600 sq ft
BUNGALOW NO A9811000152.86 sq m≈ 1,645 sq ft
BUNGALOW NO A9911000148.63 sq m≈ 1,600 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

284 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
100BUNGALOW NO A1001152.86 sq m≈ 1,645 sq ftSold₹10,028,167
101BUNGALOW NO A1011196.36 sq m≈ 2,114 sq ftSold₹14,811,100
102BUNGALOW NO A1021197.8 sq m≈ 2,129 sq ftSold₹12,500,000
103BUNGALOW NO A1031197.8 sq m≈ 2,129 sq ftSold₹12,297,770
104BUNGALOW NO A1041197.8 sq m≈ 2,129 sq ftSold₹14,500,000
105BUNGALOW NO A1051197.8 sq m≈ 2,129 sq ftSold₹18,405,000
106BUNGALOW NO A1061197.8 sq m≈ 2,129 sq ftSold₹19,787,456
107BUNGALOW NO A1071196.36 sq m≈ 2,114 sq ftSold₹19,142,373
108BUNGALOW NO A1081196.36 sq m≈ 2,114 sq ftSold₹12,875,014
109BUNGALOW NO A1091196.36 sq m≈ 2,114 sq ftSold₹12,875,014
110BUNGALOW NO A1101196.36 sq m≈ 2,114 sq ftSold₹17,740,232
111BUNGALOW NO A1111196.36 sq m≈ 2,114 sq ftSold₹14,741,373

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹1,867,959,472 of an estimated ₹2,353,750,974 was reported as incurred (79.4%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100018391

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
BUNGALOW NO A79Excavation100.0%
BUNGALOW NO A79Basement (if any)100.0%
BUNGALOW NO A79Podiums (if any) 0.0%
BUNGALOW NO A79Plinth100.0%
BUNGALOW NO A79Stilt Floor 0.0%
BUNGALOW NO A79Slabs of Super Structure100.0%
BUNGALOW NO A79Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A79Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A79Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A79External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A79Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A80Excavation100.0%
BUNGALOW NO A80Basement (if any)100.0%
BUNGALOW NO A80Podiums (if any) 0.0%
BUNGALOW NO A80Plinth100.0%
BUNGALOW NO A80Stilt Floor 0.0%
BUNGALOW NO A80Slabs of Super Structure100.0%
BUNGALOW NO A80Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A80Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A80Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A80External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A80Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92.0%
BUNGALOW NO A81Excavation100.0%
BUNGALOW NO A81Basement (if any)100.0%
BUNGALOW NO A81Podiums (if any) 0.0%
BUNGALOW NO A81Plinth100.0%
BUNGALOW NO A81Stilt Floor 0.0%
BUNGALOW NO A81Slabs of Super Structure100.0%
BUNGALOW NO A81Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A81Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A81Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A81External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A81Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A82Excavation100.0%
BUNGALOW NO A82Basement (if any)100.0%
BUNGALOW NO A82Podiums (if any) 0.0%
BUNGALOW NO A82Plinth100.0%
BUNGALOW NO A82Stilt Floor 100.0%
BUNGALOW NO A82Slabs of Super Structure100.0%
BUNGALOW NO A82Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A82Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A82Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A82External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A82Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A83Excavation100.0%
BUNGALOW NO A83Basement (if any)100.0%
BUNGALOW NO A83Podiums (if any) 0.0%
BUNGALOW NO A83Plinth100.0%
BUNGALOW NO A83Stilt Floor 0.0%
BUNGALOW NO A83Slabs of Super Structure100.0%
BUNGALOW NO A83Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A83Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A83Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A83External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A83Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A84Excavation100.0%
BUNGALOW NO A84Basement (if any)100.0%
BUNGALOW NO A84Podiums (if any) 0.0%
BUNGALOW NO A84Plinth100.0%
BUNGALOW NO A84Stilt Floor 0.0%
BUNGALOW NO A84Slabs of Super Structure100.0%
BUNGALOW NO A84Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A84Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A84Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A84External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A84Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A85Excavation100.0%
BUNGALOW NO A85Basement (if any)100.0%
BUNGALOW NO A85Podiums (if any) 0.0%
BUNGALOW NO A85Plinth100.0%
BUNGALOW NO A85Stilt Floor 0.0%
BUNGALOW NO A85Slabs of Super Structure100.0%
BUNGALOW NO A85Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A85Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A85Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A85External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A85Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95.0%
BUNGALOW NO A86Excavation100.0%
BUNGALOW NO A86Basement (if any)100.0%
BUNGALOW NO A86Podiums (if any) 0.0%
BUNGALOW NO A86Plinth100.0%
BUNGALOW NO A86Stilt Floor 0.0%
BUNGALOW NO A86Slabs of Super Structure100.0%
BUNGALOW NO A86Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
BUNGALOW NO A86Sanitary Fittings within the flats / premises50.0%
BUNGALOW NO A86Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93.0%
BUNGALOW NO A86External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A86Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A87Excavation100.0%
BUNGALOW NO A87Basement (if any)100.0%
BUNGALOW NO A87Podiums (if any) 0.0%
BUNGALOW NO A87Plinth100.0%
BUNGALOW NO A87Stilt Floor 0.0%
BUNGALOW NO A87Slabs of Super Structure100.0%
BUNGALOW NO A87Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A87Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A87Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A87External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A87Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A88Excavation100.0%
BUNGALOW NO A88Basement (if any)100.0%
BUNGALOW NO A88Podiums (if any) 0.0%
BUNGALOW NO A88Plinth100.0%
BUNGALOW NO A88Stilt Floor 0.0%
BUNGALOW NO A88Slabs of Super Structure100.0%
BUNGALOW NO A88Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25.0%
BUNGALOW NO A88Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A88Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57.0%
BUNGALOW NO A88External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.33.0%
BUNGALOW NO A88Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A89Excavation100.0%
BUNGALOW NO A89Basement (if any)100.0%
BUNGALOW NO A89Podiums (if any) 0.0%
BUNGALOW NO A89Plinth100.0%
BUNGALOW NO A89Stilt Floor 0.0%
BUNGALOW NO A89Slabs of Super Structure100.0%
BUNGALOW NO A89Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A89Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A89Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A89External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A89Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A90Excavation100.0%
BUNGALOW NO A90Basement (if any)100.0%
BUNGALOW NO A90Podiums (if any) 0.0%
BUNGALOW NO A90Plinth100.0%
BUNGALOW NO A90Stilt Floor 0.0%
BUNGALOW NO A90Slabs of Super Structure100.0%
BUNGALOW NO A90Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A90Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A90Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A90External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A90Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.92.0%
BUNGALOW NO A91Excavation100.0%
BUNGALOW NO A91Basement (if any)100.0%
BUNGALOW NO A91Podiums (if any) 0.0%
BUNGALOW NO A91Plinth100.0%
BUNGALOW NO A91Stilt Floor 0.0%
BUNGALOW NO A91Slabs of Super Structure100.0%
BUNGALOW NO A91Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A91Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A91Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60.0%
BUNGALOW NO A91External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A91Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A92Excavation100.0%
BUNGALOW NO A92Basement (if any)100.0%
BUNGALOW NO A92Podiums (if any) 0.0%
BUNGALOW NO A92Plinth100.0%
BUNGALOW NO A92Stilt Floor 0.0%
BUNGALOW NO A92Slabs of Super Structure100.0%
BUNGALOW NO A92Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A92Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A92Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60.0%
BUNGALOW NO A92External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A92Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A93Excavation100.0%
BUNGALOW NO A93Basement (if any)100.0%
BUNGALOW NO A93Podiums (if any) 0.0%
BUNGALOW NO A93Plinth100.0%
BUNGALOW NO A93Stilt Floor 0.0%
BUNGALOW NO A93Slabs of Super Structure100.0%
BUNGALOW NO A93Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A93Sanitary Fittings within the flats / premises13.0%
BUNGALOW NO A93Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57.0%
BUNGALOW NO A93External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A93Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A94Excavation100.0%
BUNGALOW NO A94Basement (if any)100.0%
BUNGALOW NO A94Podiums (if any) 0.0%
BUNGALOW NO A94Plinth100.0%
BUNGALOW NO A94Stilt Floor 0.0%
BUNGALOW NO A94Slabs of Super Structure100.0%
BUNGALOW NO A94Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A94Sanitary Fittings within the flats / premises13.0%
BUNGALOW NO A94Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67.0%
BUNGALOW NO A94External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A94Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A95Excavation100.0%
BUNGALOW NO A95Basement (if any)100.0%
BUNGALOW NO A95Podiums (if any) 0.0%
BUNGALOW NO A95Plinth100.0%
BUNGALOW NO A95Stilt Floor 0.0%
BUNGALOW NO A95Slabs of Super Structure100.0%
BUNGALOW NO A95Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A95Sanitary Fittings within the flats / premises13.0%
BUNGALOW NO A95Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40.0%
BUNGALOW NO A95External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50.0%
BUNGALOW NO A95Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A96Excavation100.0%
BUNGALOW NO A96Basement (if any)100.0%
BUNGALOW NO A96Podiums (if any) 0.0%
BUNGALOW NO A96Plinth100.0%
BUNGALOW NO A96Stilt Floor 0.0%
BUNGALOW NO A96Slabs of Super Structure100.0%
BUNGALOW NO A96Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises47.0%
BUNGALOW NO A96Sanitary Fittings within the flats / premises44.0%
BUNGALOW NO A96Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93.0%
BUNGALOW NO A96External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A96Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A97Excavation100.0%
BUNGALOW NO A97Basement (if any)100.0%
BUNGALOW NO A97Podiums (if any) 0.0%
BUNGALOW NO A97Plinth100.0%
BUNGALOW NO A97Stilt Floor 0.0%
BUNGALOW NO A97Slabs of Super Structure100.0%
BUNGALOW NO A97Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A97Sanitary Fittings within the flats / premises13.0%
BUNGALOW NO A97Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57.0%
BUNGALOW NO A97External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A97Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A98Excavation100.0%
BUNGALOW NO A98Basement (if any)100.0%
BUNGALOW NO A98Podiums (if any) 0.0%
BUNGALOW NO A98Plinth100.0%
BUNGALOW NO A98Stilt Floor 0.0%
BUNGALOW NO A98Slabs of Super Structure100.0%
BUNGALOW NO A98Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A98Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A98Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
BUNGALOW NO A98External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A98Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A99Excavation100.0%
BUNGALOW NO A99Basement (if any)100.0%
BUNGALOW NO A99Podiums (if any) 0.0%
BUNGALOW NO A99Plinth100.0%
BUNGALOW NO A99Stilt Floor 0.0%
BUNGALOW NO A99Slabs of Super Structure100.0%
BUNGALOW NO A99Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A99Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A99Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57.0%
BUNGALOW NO A99External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A99Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A100Excavation100.0%
BUNGALOW NO A100Basement (if any)100.0%
BUNGALOW NO A100Podiums (if any) 0.0%
BUNGALOW NO A100Plinth100.0%
BUNGALOW NO A100Stilt Floor 0.0%
BUNGALOW NO A100Slabs of Super Structure100.0%
BUNGALOW NO A100Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A100Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A100Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A100External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A100Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95.0%
BUNGALOW NO A101Excavation100.0%
BUNGALOW NO A101Basement (if any)100.0%
BUNGALOW NO A101Podiums (if any) 0.0%
BUNGALOW NO A101Plinth100.0%
BUNGALOW NO A101Stilt Floor 0.0%
BUNGALOW NO A101Slabs of Super Structure100.0%
BUNGALOW NO A101Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A101Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A101Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A101External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A101Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A102Excavation100.0%
BUNGALOW NO A102Basement (if any)100.0%
BUNGALOW NO A102Podiums (if any) 0.0%
BUNGALOW NO A102Plinth100.0%
BUNGALOW NO A102Stilt Floor 0.0%
BUNGALOW NO A102Slabs of Super Structure100.0%
BUNGALOW NO A102Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A102Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A102Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A102External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A102Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A103Excavation100.0%
BUNGALOW NO A103Basement (if any)100.0%
BUNGALOW NO A103Podiums (if any) 0.0%
BUNGALOW NO A103Plinth100.0%
BUNGALOW NO A103Stilt Floor 0.0%
BUNGALOW NO A103Slabs of Super Structure100.0%
BUNGALOW NO A103Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68.0%
BUNGALOW NO A103Sanitary Fittings within the flats / premises50.0%
BUNGALOW NO A103Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67.0%
BUNGALOW NO A103External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A103Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A104Excavation100.0%
BUNGALOW NO A104Basement (if any)100.0%
BUNGALOW NO A104Podiums (if any) 0.0%
BUNGALOW NO A104Plinth100.0%
BUNGALOW NO A104Stilt Floor 0.0%
BUNGALOW NO A104Slabs of Super Structure100.0%
BUNGALOW NO A104Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises46.0%
BUNGALOW NO A104Sanitary Fittings within the flats / premises50.0%
BUNGALOW NO A104Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72.0%
BUNGALOW NO A104External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A104Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A105Excavation100.0%
BUNGALOW NO A105Basement (if any)100.0%
BUNGALOW NO A105Podiums (if any) 0.0%
BUNGALOW NO A105Plinth100.0%
BUNGALOW NO A105Stilt Floor 0.0%
BUNGALOW NO A105Slabs of Super Structure100.0%
BUNGALOW NO A105Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A105Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A105Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A105External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A105Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A106Excavation100.0%
BUNGALOW NO A106Basement (if any)100.0%
BUNGALOW NO A106Podiums (if any) 0.0%
BUNGALOW NO A106Plinth100.0%
BUNGALOW NO A106Stilt Floor 0.0%
BUNGALOW NO A106Slabs of Super Structure100.0%
BUNGALOW NO A106Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A106Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A106Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A106External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A106Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A107Excavation100.0%
BUNGALOW NO A107Basement (if any)100.0%
BUNGALOW NO A107Podiums (if any) 0.0%
BUNGALOW NO A107Plinth100.0%
BUNGALOW NO A107Stilt Floor 0.0%
BUNGALOW NO A107Slabs of Super Structure100.0%
BUNGALOW NO A107Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68.0%
BUNGALOW NO A107Sanitary Fittings within the flats / premises50.0%
BUNGALOW NO A107Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A107External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A107Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A108Excavation100.0%
BUNGALOW NO A108Basement (if any)100.0%
BUNGALOW NO A108Podiums (if any) 0.0%
BUNGALOW NO A108Plinth100.0%
BUNGALOW NO A108Stilt Floor 0.0%
BUNGALOW NO A108Slabs of Super Structure100.0%
BUNGALOW NO A108Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A108Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A108Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks67.0%
BUNGALOW NO A108External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A108Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A109Excavation100.0%
BUNGALOW NO A109Basement (if any)100.0%
BUNGALOW NO A109Podiums (if any) 0.0%
BUNGALOW NO A109Plinth100.0%
BUNGALOW NO A109Stilt Floor 0.0%
BUNGALOW NO A109Slabs of Super Structure100.0%
BUNGALOW NO A109Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A109Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A109Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70.0%
BUNGALOW NO A109External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A109Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A110Excavation100.0%
BUNGALOW NO A110Basement (if any)100.0%
BUNGALOW NO A110Podiums (if any) 0.0%
BUNGALOW NO A110Plinth100.0%
BUNGALOW NO A110Stilt Floor 0.0%
BUNGALOW NO A110Slabs of Super Structure100.0%
BUNGALOW NO A110Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A110Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A110Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A110External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A110Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A111Excavation100.0%
BUNGALOW NO A111Basement (if any)100.0%
BUNGALOW NO A111Podiums (if any) 0.0%
BUNGALOW NO A111Plinth100.0%
BUNGALOW NO A111Stilt Floor 0.0%
BUNGALOW NO A111Slabs of Super Structure100.0%
BUNGALOW NO A111Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A111Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A111Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A111External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A111Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A112Excavation100.0%
BUNGALOW NO A112Basement (if any)100.0%
BUNGALOW NO A112Podiums (if any) 0.0%
BUNGALOW NO A112Plinth100.0%
BUNGALOW NO A112Stilt Floor 0.0%
BUNGALOW NO A112Slabs of Super Structure100.0%
BUNGALOW NO A112Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A112Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A112Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A112External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A112Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A113Excavation100.0%
BUNGALOW NO A113Basement (if any)100.0%
BUNGALOW NO A113Podiums (if any) 0.0%
BUNGALOW NO A113Plinth100.0%
BUNGALOW NO A113Stilt Floor 0.0%
BUNGALOW NO A113Slabs of Super Structure100.0%
BUNGALOW NO A113Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A113Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A113Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A113External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A113Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A114Excavation100.0%
BUNGALOW NO A114Basement (if any)100.0%
BUNGALOW NO A114Podiums (if any) 0.0%
BUNGALOW NO A114Plinth100.0%
BUNGALOW NO A114Stilt Floor 0.0%
BUNGALOW NO A114Slabs of Super Structure100.0%
BUNGALOW NO A114Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A114Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A114Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A114External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A114Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95.0%
BUNGALOW NO A115Excavation100.0%
BUNGALOW NO A115Basement (if any)100.0%
BUNGALOW NO A115Podiums (if any) 0.0%
BUNGALOW NO A115Plinth100.0%
BUNGALOW NO A115Stilt Floor 0.0%
BUNGALOW NO A115Slabs of Super Structure100.0%
BUNGALOW NO A115Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A115Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A115Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A115External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A115Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A116Excavation100.0%
BUNGALOW NO A116Basement (if any)100.0%
BUNGALOW NO A116Podiums (if any) 0.0%
BUNGALOW NO A116Plinth100.0%
BUNGALOW NO A116Stilt Floor 0.0%
BUNGALOW NO A116Slabs of Super Structure100.0%
BUNGALOW NO A116Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A116Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A116Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A116External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A116Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A117Excavation100.0%
BUNGALOW NO A117Basement (if any)100.0%
BUNGALOW NO A117Podiums (if any) 0.0%
BUNGALOW NO A117Plinth100.0%
BUNGALOW NO A117Stilt Floor 0.0%
BUNGALOW NO A117Slabs of Super Structure100.0%
BUNGALOW NO A117Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A117Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A117Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A117External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A117Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A118Excavation100.0%
BUNGALOW NO A118Basement (if any)100.0%
BUNGALOW NO A118Podiums (if any) 0.0%
BUNGALOW NO A118Plinth100.0%
BUNGALOW NO A118Stilt Floor 0.0%
BUNGALOW NO A118Slabs of Super Structure100.0%
BUNGALOW NO A118Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A118Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A118Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69.0%
BUNGALOW NO A118External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A118Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A119Excavation100.0%
BUNGALOW NO A119Basement (if any)100.0%
BUNGALOW NO A119Podiums (if any) 0.0%
BUNGALOW NO A119Plinth100.0%
BUNGALOW NO A119Stilt Floor 0.0%
BUNGALOW NO A119Slabs of Super Structure100.0%
BUNGALOW NO A119Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A119Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A119Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A119External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A119Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A120Excavation100.0%
BUNGALOW NO A120Basement (if any)100.0%
BUNGALOW NO A120Podiums (if any) 0.0%
BUNGALOW NO A120Plinth100.0%
BUNGALOW NO A120Stilt Floor 0.0%
BUNGALOW NO A120Slabs of Super Structure100.0%
BUNGALOW NO A120Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A120Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A120Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A120External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A120Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A121Excavation100.0%
BUNGALOW NO A121Basement (if any)100.0%
BUNGALOW NO A121Podiums (if any) 0.0%
BUNGALOW NO A121Plinth100.0%
BUNGALOW NO A121Stilt Floor 0.0%
BUNGALOW NO A121Slabs of Super Structure100.0%
BUNGALOW NO A121Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A121Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A121Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A121External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A121Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A122Excavation100.0%
BUNGALOW NO A122Basement (if any)100.0%
BUNGALOW NO A122Podiums (if any) 0.0%
BUNGALOW NO A122Plinth100.0%
BUNGALOW NO A122Stilt Floor 0.0%
BUNGALOW NO A122Slabs of Super Structure100.0%
BUNGALOW NO A122Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A122Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A122Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks57.0%
BUNGALOW NO A122External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A122Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A123Excavation100.0%
BUNGALOW NO A123Basement (if any)100.0%
BUNGALOW NO A123Podiums (if any) 0.0%
BUNGALOW NO A123Plinth100.0%
BUNGALOW NO A123Stilt Floor 0.0%
BUNGALOW NO A123Slabs of Super Structure100.0%
BUNGALOW NO A123Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A123Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A123Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A123External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A123Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95.0%
BUNGALOW NO A124Excavation100.0%
BUNGALOW NO A124Basement (if any)100.0%
BUNGALOW NO A124Podiums (if any) 0.0%
BUNGALOW NO A124Plinth100.0%
BUNGALOW NO A124Stilt Floor 0.0%
BUNGALOW NO A124Slabs of Super Structure100.0%
BUNGALOW NO A124Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A124Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A124Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A124External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A124Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A125Excavation100.0%
BUNGALOW NO A125Basement (if any)100.0%
BUNGALOW NO A125Podiums (if any) 0.0%
BUNGALOW NO A125Plinth100.0%
BUNGALOW NO A125Stilt Floor 0.0%
BUNGALOW NO A125Slabs of Super Structure100.0%
BUNGALOW NO A125Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A125Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A125Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A125External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A125Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A126Excavation100.0%
BUNGALOW NO A126Basement (if any)100.0%
BUNGALOW NO A126Podiums (if any) 0.0%
BUNGALOW NO A126Plinth100.0%
BUNGALOW NO A126Stilt Floor 0.0%
BUNGALOW NO A126Slabs of Super Structure100.0%
BUNGALOW NO A126Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A126Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A126Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A126External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A126Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A127Excavation100.0%
BUNGALOW NO A127Basement (if any)100.0%
BUNGALOW NO A127Podiums (if any) 0.0%
BUNGALOW NO A127Plinth100.0%
BUNGALOW NO A127Stilt Floor 0.0%
BUNGALOW NO A127Slabs of Super Structure100.0%
BUNGALOW NO A127Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A127Sanitary Fittings within the flats / premises90.0%
BUNGALOW NO A127Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A127External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A127Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A128Excavation100.0%
BUNGALOW NO A128Basement (if any)100.0%
BUNGALOW NO A128Podiums (if any) 0.0%
BUNGALOW NO A128Plinth100.0%
BUNGALOW NO A128Stilt Floor 0.0%
BUNGALOW NO A128Slabs of Super Structure100.0%
BUNGALOW NO A128Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A128Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A128Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A128External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A128Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A129Excavation100.0%
BUNGALOW NO A129Basement (if any)100.0%
BUNGALOW NO A129Podiums (if any) 0.0%
BUNGALOW NO A129Plinth100.0%
BUNGALOW NO A129Stilt Floor 0.0%
BUNGALOW NO A129Slabs of Super Structure100.0%
BUNGALOW NO A129Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A129Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A129Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A129External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A129Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A130Excavation100.0%
BUNGALOW NO A130Basement (if any)100.0%
BUNGALOW NO A130Podiums (if any) 0.0%
BUNGALOW NO A130Plinth100.0%
BUNGALOW NO A130Stilt Floor 0.0%
BUNGALOW NO A130Slabs of Super Structure100.0%
BUNGALOW NO A130Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A130Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A130Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A130External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A130Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A131Excavation100.0%
BUNGALOW NO A131Basement (if any)100.0%
BUNGALOW NO A131Podiums (if any) 0.0%
BUNGALOW NO A131Plinth100.0%
BUNGALOW NO A131Stilt Floor 0.0%
BUNGALOW NO A131Slabs of Super Structure100.0%
BUNGALOW NO A131Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
BUNGALOW NO A131Sanitary Fittings within the flats / premises50.0%
BUNGALOW NO A131Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A131External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A131Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A132Excavation100.0%
BUNGALOW NO A132Basement (if any)100.0%
BUNGALOW NO A132Podiums (if any) 0.0%
BUNGALOW NO A132Plinth100.0%
BUNGALOW NO A132Stilt Floor 0.0%
BUNGALOW NO A132Slabs of Super Structure100.0%
BUNGALOW NO A132Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A132Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A132Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A132External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A132Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A133Excavation100.0%
BUNGALOW NO A133Basement (if any)100.0%
BUNGALOW NO A133Podiums (if any) 0.0%
BUNGALOW NO A133Plinth100.0%
BUNGALOW NO A133Stilt Floor 0.0%
BUNGALOW NO A133Slabs of Super Structure100.0%
BUNGALOW NO A133Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A133Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A133Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A133External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A133Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A134Excavation100.0%
BUNGALOW NO A134Basement (if any)100.0%
BUNGALOW NO A134Podiums (if any) 0.0%
BUNGALOW NO A134Plinth100.0%
BUNGALOW NO A134Stilt Floor 0.0%
BUNGALOW NO A134Slabs of Super Structure100.0%
BUNGALOW NO A134Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A134Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A134Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33.0%
BUNGALOW NO A134External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A134Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A135Excavation100.0%
BUNGALOW NO A135Basement (if any)100.0%
BUNGALOW NO A135Podiums (if any) 0.0%
BUNGALOW NO A135Plinth100.0%
BUNGALOW NO A135Stilt Floor 0.0%
BUNGALOW NO A135Slabs of Super Structure100.0%
BUNGALOW NO A135Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
BUNGALOW NO A135Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A135Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A135External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.73.0%
BUNGALOW NO A135Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A136Excavation100.0%
BUNGALOW NO A136Basement (if any)100.0%
BUNGALOW NO A136Podiums (if any) 0.0%
BUNGALOW NO A136Plinth100.0%
BUNGALOW NO A136Stilt Floor 0.0%
BUNGALOW NO A136Slabs of Super Structure100.0%
BUNGALOW NO A136Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A136Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A136Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73.0%
BUNGALOW NO A136External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A136Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A137Excavation100.0%
BUNGALOW NO A137Basement (if any)0.0%
BUNGALOW NO A137Podiums (if any) 0.0%
BUNGALOW NO A137Plinth0.0%
BUNGALOW NO A137Stilt Floor 0.0%
BUNGALOW NO A137Slabs of Super Structure0.0%
BUNGALOW NO A137Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A137Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A137Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A137External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A137Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A138Excavation100.0%
BUNGALOW NO A138Basement (if any)0.0%
BUNGALOW NO A138Podiums (if any) 0.0%
BUNGALOW NO A138Plinth0.0%
BUNGALOW NO A138Stilt Floor 0.0%
BUNGALOW NO A138Slabs of Super Structure0.0%
BUNGALOW NO A138Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A138Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A138Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A138External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A138Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A139Excavation100.0%
BUNGALOW NO A139Basement (if any)100.0%
BUNGALOW NO A139Podiums (if any) 0.0%
BUNGALOW NO A139Plinth100.0%
BUNGALOW NO A139Stilt Floor 0.0%
BUNGALOW NO A139Slabs of Super Structure0.0%
BUNGALOW NO A139Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A139Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A139Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A139External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A139Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A140Excavation100.0%
BUNGALOW NO A140Basement (if any)100.0%
BUNGALOW NO A140Podiums (if any) 0.0%
BUNGALOW NO A140Plinth100.0%
BUNGALOW NO A140Stilt Floor 0.0%
BUNGALOW NO A140Slabs of Super Structure0.0%
BUNGALOW NO A140Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A140Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A140Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A140External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A140Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A141Excavation100.0%
BUNGALOW NO A141Basement (if any)100.0%
BUNGALOW NO A141Podiums (if any) 0.0%
BUNGALOW NO A141Plinth100.0%
BUNGALOW NO A141Stilt Floor 0.0%
BUNGALOW NO A141Slabs of Super Structure0.0%
BUNGALOW NO A141Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A141Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A141Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A141External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A141Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A142Excavation100.0%
BUNGALOW NO A142Basement (if any)100.0%
BUNGALOW NO A142Podiums (if any) 0.0%
BUNGALOW NO A142Plinth100.0%
BUNGALOW NO A142Stilt Floor 0.0%
BUNGALOW NO A142Slabs of Super Structure100.0%
BUNGALOW NO A142Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises38.0%
BUNGALOW NO A142Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A142Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30.0%
BUNGALOW NO A142External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.67.0%
BUNGALOW NO A142Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A143Excavation100.0%
BUNGALOW NO A143Basement (if any)100.0%
BUNGALOW NO A143Podiums (if any) 0.0%
BUNGALOW NO A143Plinth100.0%
BUNGALOW NO A143Stilt Floor 0.0%
BUNGALOW NO A143Slabs of Super Structure100.0%
BUNGALOW NO A143Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A143Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A143Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30.0%
BUNGALOW NO A143External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
BUNGALOW NO A143Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A144Excavation0.0%
BUNGALOW NO A144Basement (if any)0.0%
BUNGALOW NO A144Podiums (if any) 0.0%
BUNGALOW NO A144Plinth0.0%
BUNGALOW NO A144Stilt Floor 0.0%
BUNGALOW NO A144Slabs of Super Structure0.0%
BUNGALOW NO A144Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A144Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A144Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A144External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A144Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A145Excavation100.0%
BUNGALOW NO A145Basement (if any)100.0%
BUNGALOW NO A145Podiums (if any) 0.0%
BUNGALOW NO A145Plinth100.0%
BUNGALOW NO A145Stilt Floor 0.0%
BUNGALOW NO A145Slabs of Super Structure0.0%
BUNGALOW NO A145Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A145Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A145Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A145External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A145Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A146Excavation100.0%
BUNGALOW NO A146Basement (if any)100.0%
BUNGALOW NO A146Podiums (if any) 0.0%
BUNGALOW NO A146Plinth0.0%
BUNGALOW NO A146Stilt Floor 0.0%
BUNGALOW NO A146Slabs of Super Structure0.0%
BUNGALOW NO A146Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A146Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A146Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A146External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A146Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A147Excavation100.0%
BUNGALOW NO A147Basement (if any)0.0%
BUNGALOW NO A147Podiums (if any) 0.0%
BUNGALOW NO A147Plinth0.0%
BUNGALOW NO A147Stilt Floor 0.0%
BUNGALOW NO A147Slabs of Super Structure0.0%
BUNGALOW NO A147Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A147Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A147Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A147External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A147Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A148Excavation0.0%
BUNGALOW NO A148Basement (if any)0.0%
BUNGALOW NO A148Podiums (if any) 0.0%
BUNGALOW NO A148Plinth0.0%
BUNGALOW NO A148Stilt Floor 0.0%
BUNGALOW NO A148Slabs of Super Structure0.0%
BUNGALOW NO A148Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A148Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A148Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A148External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A148Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A149Excavation0.0%
BUNGALOW NO A149Basement (if any)0.0%
BUNGALOW NO A149Podiums (if any) 0.0%
BUNGALOW NO A149Plinth0.0%
BUNGALOW NO A149Stilt Floor 0.0%
BUNGALOW NO A149Slabs of Super Structure0.0%
BUNGALOW NO A149Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A149Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A149Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A149External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A149Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A150Excavation100.0%
BUNGALOW NO A150Basement (if any)100.0%
BUNGALOW NO A150Podiums (if any) 0.0%
BUNGALOW NO A150Plinth100.0%
BUNGALOW NO A150Stilt Floor 0.0%
BUNGALOW NO A150Slabs of Super Structure100.0%
BUNGALOW NO A150Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A150Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A150Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23.0%
BUNGALOW NO A150External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.67.0%
BUNGALOW NO A150Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A151Excavation100.0%
BUNGALOW NO A151Basement (if any)100.0%
BUNGALOW NO A151Podiums (if any) 0.0%
BUNGALOW NO A151Plinth100.0%
BUNGALOW NO A151Stilt Floor 0.0%
BUNGALOW NO A151Slabs of Super Structure100.0%
BUNGALOW NO A151Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises27.0%
BUNGALOW NO A151Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A151Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23.0%
BUNGALOW NO A151External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A151Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A152Excavation100.0%
BUNGALOW NO A152Basement (if any)100.0%
BUNGALOW NO A152Podiums (if any) 0.0%
BUNGALOW NO A152Plinth100.0%
BUNGALOW NO A152Stilt Floor 0.0%
BUNGALOW NO A152Slabs of Super Structure100.0%
BUNGALOW NO A152Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A152Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A152Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23.0%
BUNGALOW NO A152External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A152Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A153Excavation100.0%
BUNGALOW NO A153Basement (if any)100.0%
BUNGALOW NO A153Podiums (if any) 0.0%
BUNGALOW NO A153Plinth100.0%
BUNGALOW NO A153Stilt Floor 0.0%
BUNGALOW NO A153Slabs of Super Structure100.0%
BUNGALOW NO A153Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A153Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A153Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A153External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A153Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A154Excavation100.0%
BUNGALOW NO A154Basement (if any)100.0%
BUNGALOW NO A154Podiums (if any) 0.0%
BUNGALOW NO A154Plinth100.0%
BUNGALOW NO A154Stilt Floor 0.0%
BUNGALOW NO A154Slabs of Super Structure100.0%
BUNGALOW NO A154Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A154Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A154Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A154External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A154Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A155Excavation100.0%
BUNGALOW NO A155Basement (if any)100.0%
BUNGALOW NO A155Podiums (if any) 0.0%
BUNGALOW NO A155Plinth100.0%
BUNGALOW NO A155Stilt Floor 0.0%
BUNGALOW NO A155Slabs of Super Structure100.0%
BUNGALOW NO A155Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A155Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A155Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A155External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A155Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A156Excavation100.0%
BUNGALOW NO A156Basement (if any)100.0%
BUNGALOW NO A156Podiums (if any) 0.0%
BUNGALOW NO A156Plinth100.0%
BUNGALOW NO A156Stilt Floor 0.0%
BUNGALOW NO A156Slabs of Super Structure100.0%
BUNGALOW NO A156Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A156Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A156Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A156External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A156Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A157Excavation100.0%
BUNGALOW NO A157Basement (if any)100.0%
BUNGALOW NO A157Podiums (if any) 0.0%
BUNGALOW NO A157Plinth100.0%
BUNGALOW NO A157Stilt Floor 0.0%
BUNGALOW NO A157Slabs of Super Structure100.0%
BUNGALOW NO A157Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A157Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A157Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A157External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A157Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A158Excavation100.0%
BUNGALOW NO A158Basement (if any)100.0%
BUNGALOW NO A158Podiums (if any) 0.0%
BUNGALOW NO A158Plinth100.0%
BUNGALOW NO A158Stilt Floor 0.0%
BUNGALOW NO A158Slabs of Super Structure100.0%
BUNGALOW NO A158Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A158Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A158Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A158External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A158Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A159Excavation100.0%
BUNGALOW NO A159Basement (if any)100.0%
BUNGALOW NO A159Podiums (if any) 0.0%
BUNGALOW NO A159Plinth100.0%
BUNGALOW NO A159Stilt Floor 0.0%
BUNGALOW NO A159Slabs of Super Structure100.0%
BUNGALOW NO A159Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A159Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A159Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A159External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A159Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A160Excavation100.0%
BUNGALOW NO A160Basement (if any)100.0%
BUNGALOW NO A160Podiums (if any) 0.0%
BUNGALOW NO A160Plinth100.0%
BUNGALOW NO A160Stilt Floor 0.0%
BUNGALOW NO A160Slabs of Super Structure100.0%
BUNGALOW NO A160Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A160Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A160Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A160External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A160Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A161Excavation100.0%
BUNGALOW NO A161Basement (if any)100.0%
BUNGALOW NO A161Podiums (if any) 0.0%
BUNGALOW NO A161Plinth100.0%
BUNGALOW NO A161Stilt Floor 0.0%
BUNGALOW NO A161Slabs of Super Structure100.0%
BUNGALOW NO A161Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A161Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A161Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A161External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A161Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A162Excavation100.0%
BUNGALOW NO A162Basement (if any)100.0%
BUNGALOW NO A162Podiums (if any) 0.0%
BUNGALOW NO A162Plinth100.0%
BUNGALOW NO A162Stilt Floor 0.0%
BUNGALOW NO A162Slabs of Super Structure100.0%
BUNGALOW NO A162Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A162Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A162Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A162External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A162Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A163Excavation100.0%
BUNGALOW NO A163Basement (if any)100.0%
BUNGALOW NO A163Podiums (if any) 0.0%
BUNGALOW NO A163Plinth100.0%
BUNGALOW NO A163Stilt Floor 0.0%
BUNGALOW NO A163Slabs of Super Structure100.0%
BUNGALOW NO A163Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A163Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A163Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A163External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A163Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A164Excavation100.0%
BUNGALOW NO A164Basement (if any)100.0%
BUNGALOW NO A164Podiums (if any) 0.0%
BUNGALOW NO A164Plinth100.0%
BUNGALOW NO A164Stilt Floor 0.0%
BUNGALOW NO A164Slabs of Super Structure100.0%
BUNGALOW NO A164Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A164Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A164Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A164External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A164Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A165Excavation100.0%
BUNGALOW NO A165Basement (if any)100.0%
BUNGALOW NO A165Podiums (if any) 0.0%
BUNGALOW NO A165Plinth100.0%
BUNGALOW NO A165Stilt Floor 0.0%
BUNGALOW NO A165Slabs of Super Structure100.0%
BUNGALOW NO A165Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A165Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A165Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A165External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A165Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A166Excavation100.0%
BUNGALOW NO A166Basement (if any)100.0%
BUNGALOW NO A166Podiums (if any) 0.0%
BUNGALOW NO A166Plinth100.0%
BUNGALOW NO A166Stilt Floor 0.0%
BUNGALOW NO A166Slabs of Super Structure100.0%
BUNGALOW NO A166Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A166Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A166Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69.0%
BUNGALOW NO A166External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A166Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A167Excavation100.0%
BUNGALOW NO A167Basement (if any)100.0%
BUNGALOW NO A167Podiums (if any) 0.0%
BUNGALOW NO A167Plinth100.0%
BUNGALOW NO A167Stilt Floor 0.0%
BUNGALOW NO A167Slabs of Super Structure100.0%
BUNGALOW NO A167Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93.0%
BUNGALOW NO A167Sanitary Fittings within the flats / premises37.0%
BUNGALOW NO A167Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks89.0%
BUNGALOW NO A167External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A167Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A168Excavation100.0%
BUNGALOW NO A168Basement (if any)100.0%
BUNGALOW NO A168Podiums (if any) 0.0%
BUNGALOW NO A168Plinth100.0%
BUNGALOW NO A168Stilt Floor 0.0%
BUNGALOW NO A168Slabs of Super Structure100.0%
BUNGALOW NO A168Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises23.0%
BUNGALOW NO A168Sanitary Fittings within the flats / premises6.0%
BUNGALOW NO A168Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A168External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A168Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A169Excavation100.0%
BUNGALOW NO A169Basement (if any)100.0%
BUNGALOW NO A169Podiums (if any) 0.0%
BUNGALOW NO A169Plinth100.0%
BUNGALOW NO A169Stilt Floor 0.0%
BUNGALOW NO A169Slabs of Super Structure100.0%
BUNGALOW NO A169Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A169Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A169Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A169External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A169Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A170Excavation100.0%
BUNGALOW NO A170Basement (if any)100.0%
BUNGALOW NO A170Podiums (if any) 0.0%
BUNGALOW NO A170Plinth100.0%
BUNGALOW NO A170Stilt Floor 0.0%
BUNGALOW NO A170Slabs of Super Structure100.0%
BUNGALOW NO A170Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25.0%
BUNGALOW NO A170Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A170Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A170External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A170Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A171Excavation100.0%
BUNGALOW NO A171Basement (if any)100.0%
BUNGALOW NO A171Podiums (if any) 0.0%
BUNGALOW NO A171Plinth100.0%
BUNGALOW NO A171Stilt Floor 0.0%
BUNGALOW NO A171Slabs of Super Structure100.0%
BUNGALOW NO A171Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A171Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A171Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A171External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A171Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A172Excavation100.0%
BUNGALOW NO A172Basement (if any)100.0%
BUNGALOW NO A172Podiums (if any) 0.0%
BUNGALOW NO A172Plinth100.0%
BUNGALOW NO A172Stilt Floor 0.0%
BUNGALOW NO A172Slabs of Super Structure100.0%
BUNGALOW NO A172Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A172Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A172Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A172External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A172Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A173Excavation100.0%
BUNGALOW NO A173Basement (if any)100.0%
BUNGALOW NO A173Podiums (if any) 0.0%
BUNGALOW NO A173Plinth100.0%
BUNGALOW NO A173Stilt Floor 0.0%
BUNGALOW NO A173Slabs of Super Structure100.0%
BUNGALOW NO A173Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A173Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A173Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A173External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A173Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A174Excavation100.0%
BUNGALOW NO A174Basement (if any)100.0%
BUNGALOW NO A174Podiums (if any) 0.0%
BUNGALOW NO A174Plinth100.0%
BUNGALOW NO A174Stilt Floor 0.0%
BUNGALOW NO A174Slabs of Super Structure100.0%
BUNGALOW NO A174Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A174Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A174Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A174External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A174Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A175Excavation100.0%
BUNGALOW NO A175Basement (if any)100.0%
BUNGALOW NO A175Podiums (if any) 0.0%
BUNGALOW NO A175Plinth100.0%
BUNGALOW NO A175Stilt Floor 0.0%
BUNGALOW NO A175Slabs of Super Structure100.0%
BUNGALOW NO A175Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A175Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A175Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A175External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A175Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A176Excavation100.0%
BUNGALOW NO A176Basement (if any)100.0%
BUNGALOW NO A176Podiums (if any) 0.0%
BUNGALOW NO A176Plinth100.0%
BUNGALOW NO A176Stilt Floor 0.0%
BUNGALOW NO A176Slabs of Super Structure100.0%
BUNGALOW NO A176Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A176Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A176Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A176External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A176Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A177Excavation100.0%
BUNGALOW NO A177Basement (if any)100.0%
BUNGALOW NO A177Podiums (if any) 0.0%
BUNGALOW NO A177Plinth100.0%
BUNGALOW NO A177Stilt Floor 0.0%
BUNGALOW NO A177Slabs of Super Structure100.0%
BUNGALOW NO A177Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A177Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A177Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A177External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A177Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A178Excavation100.0%
BUNGALOW NO A178Basement (if any)100.0%
BUNGALOW NO A178Podiums (if any) 0.0%
BUNGALOW NO A178Plinth100.0%
BUNGALOW NO A178Stilt Floor 0.0%
BUNGALOW NO A178Slabs of Super Structure100.0%
BUNGALOW NO A178Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A178Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A178Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A178External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A178Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A179Excavation100.0%
BUNGALOW NO A179Basement (if any)100.0%
BUNGALOW NO A179Podiums (if any) 0.0%
BUNGALOW NO A179Plinth100.0%
BUNGALOW NO A179Stilt Floor 0.0%
BUNGALOW NO A179Slabs of Super Structure100.0%
BUNGALOW NO A179Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A179Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A179Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A179External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A179Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A180Excavation100.0%
BUNGALOW NO A180Basement (if any)100.0%
BUNGALOW NO A180Podiums (if any) 0.0%
BUNGALOW NO A180Plinth100.0%
BUNGALOW NO A180Stilt Floor 0.0%
BUNGALOW NO A180Slabs of Super Structure100.0%
BUNGALOW NO A180Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A180Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A180Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A180External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A180Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A181Excavation100.0%
BUNGALOW NO A181Basement (if any)100.0%
BUNGALOW NO A181Podiums (if any) 0.0%
BUNGALOW NO A181Plinth100.0%
BUNGALOW NO A181Stilt Floor 0.0%
BUNGALOW NO A181Slabs of Super Structure100.0%
BUNGALOW NO A181Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A181Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A181Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A181External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A181Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A182Excavation100.0%
BUNGALOW NO A182Basement (if any)100.0%
BUNGALOW NO A182Podiums (if any) 0.0%
BUNGALOW NO A182Plinth100.0%
BUNGALOW NO A182Stilt Floor 0.0%
BUNGALOW NO A182Slabs of Super Structure100.0%
BUNGALOW NO A182Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A182Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A182Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A182External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A182Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A183Excavation100.0%
BUNGALOW NO A183Basement (if any)100.0%
BUNGALOW NO A183Podiums (if any) 0.0%
BUNGALOW NO A183Plinth100.0%
BUNGALOW NO A183Stilt Floor 0.0%
BUNGALOW NO A183Slabs of Super Structure100.0%
BUNGALOW NO A183Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A183Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A183Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A183External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A183Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A184Excavation100.0%
BUNGALOW NO A184Basement (if any)100.0%
BUNGALOW NO A184Podiums (if any) 0.0%
BUNGALOW NO A184Plinth100.0%
BUNGALOW NO A184Stilt Floor 0.0%
BUNGALOW NO A184Slabs of Super Structure100.0%
BUNGALOW NO A184Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A184Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A184Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A184External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A184Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A185Excavation100.0%
BUNGALOW NO A185Basement (if any)100.0%
BUNGALOW NO A185Podiums (if any) 0.0%
BUNGALOW NO A185Plinth100.0%
BUNGALOW NO A185Stilt Floor 0.0%
BUNGALOW NO A185Slabs of Super Structure100.0%
BUNGALOW NO A185Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A185Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A185Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A185External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A185Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A186Excavation100.0%
BUNGALOW NO A186Basement (if any)100.0%
BUNGALOW NO A186Podiums (if any) 0.0%
BUNGALOW NO A186Plinth100.0%
BUNGALOW NO A186Stilt Floor 0.0%
BUNGALOW NO A186Slabs of Super Structure100.0%
BUNGALOW NO A186Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A186Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A186Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A186External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A186Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A187Excavation100.0%
BUNGALOW NO A187Basement (if any)100.0%
BUNGALOW NO A187Podiums (if any) 0.0%
BUNGALOW NO A187Plinth100.0%
BUNGALOW NO A187Stilt Floor 0.0%
BUNGALOW NO A187Slabs of Super Structure100.0%
BUNGALOW NO A187Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A187Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A187Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A187External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A187Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A188Excavation100.0%
BUNGALOW NO A188Basement (if any)100.0%
BUNGALOW NO A188Podiums (if any) 0.0%
BUNGALOW NO A188Plinth100.0%
BUNGALOW NO A188Stilt Floor 0.0%
BUNGALOW NO A188Slabs of Super Structure100.0%
BUNGALOW NO A188Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A188Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A188Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A188External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A188Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A189Excavation100.0%
BUNGALOW NO A189Basement (if any)100.0%
BUNGALOW NO A189Podiums (if any) 0.0%
BUNGALOW NO A189Plinth100.0%
BUNGALOW NO A189Stilt Floor 0.0%
BUNGALOW NO A189Slabs of Super Structure100.0%
BUNGALOW NO A189Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A189Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A189Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A189External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A189Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A190Excavation100.0%
BUNGALOW NO A190Basement (if any)100.0%
BUNGALOW NO A190Podiums (if any) 0.0%
BUNGALOW NO A190Plinth100.0%
BUNGALOW NO A190Stilt Floor 0.0%
BUNGALOW NO A190Slabs of Super Structure100.0%
BUNGALOW NO A190Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A190Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A190Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A190External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A190Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A191Excavation100.0%
BUNGALOW NO A191Basement (if any)100.0%
BUNGALOW NO A191Podiums (if any) 0.0%
BUNGALOW NO A191Plinth100.0%
BUNGALOW NO A191Stilt Floor 0.0%
BUNGALOW NO A191Slabs of Super Structure100.0%
BUNGALOW NO A191Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A191Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A191Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A191External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A191Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A192Excavation100.0%
BUNGALOW NO A192Basement (if any)100.0%
BUNGALOW NO A192Podiums (if any) 0.0%
BUNGALOW NO A192Plinth100.0%
BUNGALOW NO A192Stilt Floor 0.0%
BUNGALOW NO A192Slabs of Super Structure100.0%
BUNGALOW NO A192Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A192Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A192Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A192External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A192Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A193Excavation100.0%
BUNGALOW NO A193Basement (if any)100.0%
BUNGALOW NO A193Podiums (if any) 0.0%
BUNGALOW NO A193Plinth100.0%
BUNGALOW NO A193Stilt Floor 0.0%
BUNGALOW NO A193Slabs of Super Structure100.0%
BUNGALOW NO A193Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A193Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A193Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A193External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A193Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A194Excavation100.0%
BUNGALOW NO A194Basement (if any)100.0%
BUNGALOW NO A194Podiums (if any) 0.0%
BUNGALOW NO A194Plinth100.0%
BUNGALOW NO A194Stilt Floor 0.0%
BUNGALOW NO A194Slabs of Super Structure100.0%
BUNGALOW NO A194Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A194Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A194Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A194External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A194Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A195Excavation100.0%
BUNGALOW NO A195Basement (if any)100.0%
BUNGALOW NO A195Podiums (if any) 0.0%
BUNGALOW NO A195Plinth100.0%
BUNGALOW NO A195Stilt Floor 0.0%
BUNGALOW NO A195Slabs of Super Structure100.0%
BUNGALOW NO A195Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A195Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A195Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A195External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A195Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A196Excavation100.0%
BUNGALOW NO A196Basement (if any)100.0%
BUNGALOW NO A196Podiums (if any) 0.0%
BUNGALOW NO A196Plinth100.0%
BUNGALOW NO A196Stilt Floor 0.0%
BUNGALOW NO A196Slabs of Super Structure100.0%
BUNGALOW NO A196Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A196Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A196Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A196External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A196Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A197Excavation100.0%
BUNGALOW NO A197Basement (if any)100.0%
BUNGALOW NO A197Podiums (if any) 0.0%
BUNGALOW NO A197Plinth100.0%
BUNGALOW NO A197Stilt Floor 0.0%
BUNGALOW NO A197Slabs of Super Structure100.0%
BUNGALOW NO A197Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A197Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A197Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A197External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A197Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A198Excavation100.0%
BUNGALOW NO A198Basement (if any)100.0%
BUNGALOW NO A198Podiums (if any) 0.0%
BUNGALOW NO A198Plinth100.0%
BUNGALOW NO A198Stilt Floor 0.0%
BUNGALOW NO A198Slabs of Super Structure100.0%
BUNGALOW NO A198Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A198Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A198Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A198External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A198Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A199Excavation100.0%
BUNGALOW NO A199Basement (if any)100.0%
BUNGALOW NO A199Podiums (if any) 0.0%
BUNGALOW NO A199Plinth100.0%
BUNGALOW NO A199Stilt Floor 0.0%
BUNGALOW NO A199Slabs of Super Structure100.0%
BUNGALOW NO A199Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A199Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A199Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A199External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A199Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A200Excavation100.0%
BUNGALOW NO A200Basement (if any)100.0%
BUNGALOW NO A200Podiums (if any) 0.0%
BUNGALOW NO A200Plinth100.0%
BUNGALOW NO A200Stilt Floor 0.0%
BUNGALOW NO A200Slabs of Super Structure100.0%
BUNGALOW NO A200Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A200Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A200Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A200External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A200Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A201Excavation100.0%
BUNGALOW NO A201Basement (if any)100.0%
BUNGALOW NO A201Podiums (if any) 0.0%
BUNGALOW NO A201Plinth100.0%
BUNGALOW NO A201Stilt Floor 0.0%
BUNGALOW NO A201Slabs of Super Structure100.0%
BUNGALOW NO A201Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A201Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A201Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A201External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A201Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A202Excavation100.0%
BUNGALOW NO A202Basement (if any)100.0%
BUNGALOW NO A202Podiums (if any) 0.0%
BUNGALOW NO A202Plinth100.0%
BUNGALOW NO A202Stilt Floor 0.0%
BUNGALOW NO A202Slabs of Super Structure100.0%
BUNGALOW NO A202Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A202Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A202Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A202External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A202Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A203Excavation100.0%
BUNGALOW NO A203Basement (if any)100.0%
BUNGALOW NO A203Podiums (if any) 0.0%
BUNGALOW NO A203Plinth100.0%
BUNGALOW NO A203Stilt Floor 0.0%
BUNGALOW NO A203Slabs of Super Structure100.0%
BUNGALOW NO A203Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A203Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A203Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A203External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A203Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A204Excavation100.0%
BUNGALOW NO A204Basement (if any)100.0%
BUNGALOW NO A204Podiums (if any) 0.0%
BUNGALOW NO A204Plinth100.0%
BUNGALOW NO A204Stilt Floor 0.0%
BUNGALOW NO A204Slabs of Super Structure100.0%
BUNGALOW NO A204Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A204Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A204Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A204External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A204Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A205Excavation100.0%
BUNGALOW NO A205Basement (if any)100.0%
BUNGALOW NO A205Podiums (if any) 0.0%
BUNGALOW NO A205Plinth100.0%
BUNGALOW NO A205Stilt Floor 0.0%
BUNGALOW NO A205Slabs of Super Structure100.0%
BUNGALOW NO A205Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A205Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A205Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A205External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A205Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A206Excavation100.0%
BUNGALOW NO A206Basement (if any)100.0%
BUNGALOW NO A206Podiums (if any) 0.0%
BUNGALOW NO A206Plinth100.0%
BUNGALOW NO A206Stilt Floor 0.0%
BUNGALOW NO A206Slabs of Super Structure100.0%
BUNGALOW NO A206Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A206Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A206Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A206External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A206Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A207Excavation100.0%
BUNGALOW NO A207Basement (if any)100.0%
BUNGALOW NO A207Podiums (if any) 0.0%
BUNGALOW NO A207Plinth100.0%
BUNGALOW NO A207Stilt Floor 0.0%
BUNGALOW NO A207Slabs of Super Structure100.0%
BUNGALOW NO A207Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises52.0%
BUNGALOW NO A207Sanitary Fittings within the flats / premises40.0%
BUNGALOW NO A207Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69.0%
BUNGALOW NO A207External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A207Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A208Excavation100.0%
BUNGALOW NO A208Basement (if any)100.0%
BUNGALOW NO A208Podiums (if any) 0.0%
BUNGALOW NO A208Plinth100.0%
BUNGALOW NO A208Stilt Floor 0.0%
BUNGALOW NO A208Slabs of Super Structure100.0%
BUNGALOW NO A208Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A208Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A208Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A208External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A208Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A209Excavation100.0%
BUNGALOW NO A209Basement (if any)100.0%
BUNGALOW NO A209Podiums (if any) 0.0%
BUNGALOW NO A209Plinth100.0%
BUNGALOW NO A209Stilt Floor 0.0%
BUNGALOW NO A209Slabs of Super Structure100.0%
BUNGALOW NO A209Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises48.0%
BUNGALOW NO A209Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A209Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
BUNGALOW NO A209External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A209Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A210Excavation100.0%
BUNGALOW NO A210Basement (if any)100.0%
BUNGALOW NO A210Podiums (if any) 0.0%
BUNGALOW NO A210Plinth100.0%
BUNGALOW NO A210Stilt Floor 0.0%
BUNGALOW NO A210Slabs of Super Structure100.0%
BUNGALOW NO A210Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A210Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A210Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A210External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A210Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A211Excavation100.0%
BUNGALOW NO A211Basement (if any)100.0%
BUNGALOW NO A211Podiums (if any) 0.0%
BUNGALOW NO A211Plinth100.0%
BUNGALOW NO A211Stilt Floor 0.0%
BUNGALOW NO A211Slabs of Super Structure100.0%
BUNGALOW NO A211Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A211Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A211Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A211External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A211Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A212Excavation100.0%
BUNGALOW NO A212Basement (if any)100.0%
BUNGALOW NO A212Podiums (if any) 0.0%
BUNGALOW NO A212Plinth100.0%
BUNGALOW NO A212Stilt Floor 0.0%
BUNGALOW NO A212Slabs of Super Structure100.0%
BUNGALOW NO A212Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A212Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A212Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A212External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A212Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A213Excavation100.0%
BUNGALOW NO A213Basement (if any)100.0%
BUNGALOW NO A213Podiums (if any) 0.0%
BUNGALOW NO A213Plinth100.0%
BUNGALOW NO A213Stilt Floor 0.0%
BUNGALOW NO A213Slabs of Super Structure100.0%
BUNGALOW NO A213Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises43.0%
BUNGALOW NO A213Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A213Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks36.0%
BUNGALOW NO A213External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A213Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A214Excavation100.0%
BUNGALOW NO A214Basement (if any)100.0%
BUNGALOW NO A214Podiums (if any) 0.0%
BUNGALOW NO A214Plinth100.0%
BUNGALOW NO A214Stilt Floor 0.0%
BUNGALOW NO A214Slabs of Super Structure100.0%
BUNGALOW NO A214Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A214Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A214Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A214External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A214Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A215Excavation100.0%
BUNGALOW NO A215Basement (if any)100.0%
BUNGALOW NO A215Podiums (if any) 0.0%
BUNGALOW NO A215Plinth100.0%
BUNGALOW NO A215Stilt Floor 0.0%
BUNGALOW NO A215Slabs of Super Structure100.0%
BUNGALOW NO A215Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises47.0%
BUNGALOW NO A215Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A215Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60.0%
BUNGALOW NO A215External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.67.0%
BUNGALOW NO A215Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A216Excavation100.0%
BUNGALOW NO A216Basement (if any)100.0%
BUNGALOW NO A216Podiums (if any) 0.0%
BUNGALOW NO A216Plinth100.0%
BUNGALOW NO A216Stilt Floor 0.0%
BUNGALOW NO A216Slabs of Super Structure100.0%
BUNGALOW NO A216Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A216Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A216Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A216External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A216Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A217Excavation100.0%
BUNGALOW NO A217Basement (if any)100.0%
BUNGALOW NO A217Podiums (if any) 0.0%
BUNGALOW NO A217Plinth100.0%
BUNGALOW NO A217Stilt Floor 0.0%
BUNGALOW NO A217Slabs of Super Structure100.0%
BUNGALOW NO A217Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A217Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A217Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A217External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A217Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A218Excavation100.0%
BUNGALOW NO A218Basement (if any)100.0%
BUNGALOW NO A218Podiums (if any) 0.0%
BUNGALOW NO A218Plinth100.0%
BUNGALOW NO A218Stilt Floor 0.0%
BUNGALOW NO A218Slabs of Super Structure100.0%
BUNGALOW NO A218Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A218Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A218Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A218External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A218Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A219Excavation100.0%
BUNGALOW NO A219Basement (if any)100.0%
BUNGALOW NO A219Podiums (if any) 0.0%
BUNGALOW NO A219Plinth100.0%
BUNGALOW NO A219Stilt Floor 0.0%
BUNGALOW NO A219Slabs of Super Structure100.0%
BUNGALOW NO A219Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A219Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A219Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A219External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A219Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A220Excavation100.0%
BUNGALOW NO A220Basement (if any)100.0%
BUNGALOW NO A220Podiums (if any) 0.0%
BUNGALOW NO A220Plinth100.0%
BUNGALOW NO A220Stilt Floor 0.0%
BUNGALOW NO A220Slabs of Super Structure100.0%
BUNGALOW NO A220Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A220Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A220Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A220External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A220Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A221Excavation100.0%
BUNGALOW NO A221Basement (if any)100.0%
BUNGALOW NO A221Podiums (if any) 0.0%
BUNGALOW NO A221Plinth100.0%
BUNGALOW NO A221Stilt Floor 0.0%
BUNGALOW NO A221Slabs of Super Structure100.0%
BUNGALOW NO A221Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A221Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A221Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A221External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A221Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A222Excavation100.0%
BUNGALOW NO A222Basement (if any)100.0%
BUNGALOW NO A222Podiums (if any) 0.0%
BUNGALOW NO A222Plinth100.0%
BUNGALOW NO A222Stilt Floor 0.0%
BUNGALOW NO A222Slabs of Super Structure100.0%
BUNGALOW NO A222Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A222Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A222Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A222External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A222Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A223Excavation100.0%
BUNGALOW NO A223Basement (if any)100.0%
BUNGALOW NO A223Podiums (if any) 0.0%
BUNGALOW NO A223Plinth100.0%
BUNGALOW NO A223Stilt Floor 0.0%
BUNGALOW NO A223Slabs of Super Structure100.0%
BUNGALOW NO A223Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises53.0%
BUNGALOW NO A223Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A223Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
BUNGALOW NO A223External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A223Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A224Excavation100.0%
BUNGALOW NO A224Basement (if any)100.0%
BUNGALOW NO A224Podiums (if any) 0.0%
BUNGALOW NO A224Plinth100.0%
BUNGALOW NO A224Stilt Floor 0.0%
BUNGALOW NO A224Slabs of Super Structure100.0%
BUNGALOW NO A224Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A224Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A224Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A224External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A224Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A225Excavation100.0%
BUNGALOW NO A225Basement (if any)100.0%
BUNGALOW NO A225Podiums (if any) 0.0%
BUNGALOW NO A225Plinth100.0%
BUNGALOW NO A225Stilt Floor 0.0%
BUNGALOW NO A225Slabs of Super Structure100.0%
BUNGALOW NO A225Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A225Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A225Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A225External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A225Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A226Excavation100.0%
BUNGALOW NO A226Basement (if any)100.0%
BUNGALOW NO A226Podiums (if any) 0.0%
BUNGALOW NO A226Plinth100.0%
BUNGALOW NO A226Stilt Floor 0.0%
BUNGALOW NO A226Slabs of Super Structure100.0%
BUNGALOW NO A226Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A226Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A226Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A226External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A226Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A227Excavation100.0%
BUNGALOW NO A227Basement (if any)100.0%
BUNGALOW NO A227Podiums (if any) 0.0%
BUNGALOW NO A227Plinth100.0%
BUNGALOW NO A227Stilt Floor 0.0%
BUNGALOW NO A227Slabs of Super Structure100.0%
BUNGALOW NO A227Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A227Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A227Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69.0%
BUNGALOW NO A227External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A227Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A228Excavation100.0%
BUNGALOW NO A228Basement (if any)100.0%
BUNGALOW NO A228Podiums (if any) 0.0%
BUNGALOW NO A228Plinth100.0%
BUNGALOW NO A228Stilt Floor 0.0%
BUNGALOW NO A228Slabs of Super Structure100.0%
BUNGALOW NO A228Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A228Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A228Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A228External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A228Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A229Excavation100.0%
BUNGALOW NO A229Basement (if any)100.0%
BUNGALOW NO A229Podiums (if any) 0.0%
BUNGALOW NO A229Plinth100.0%
BUNGALOW NO A229Stilt Floor 0.0%
BUNGALOW NO A229Slabs of Super Structure100.0%
BUNGALOW NO A229Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A229Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A229Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A229External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A229Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A230Excavation100.0%
BUNGALOW NO A230Basement (if any)100.0%
BUNGALOW NO A230Podiums (if any) 0.0%
BUNGALOW NO A230Plinth100.0%
BUNGALOW NO A230Stilt Floor 0.0%
BUNGALOW NO A230Slabs of Super Structure100.0%
BUNGALOW NO A230Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A230Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A230Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A230External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A230Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A231Excavation100.0%
BUNGALOW NO A231Basement (if any)100.0%
BUNGALOW NO A231Podiums (if any) 0.0%
BUNGALOW NO A231Plinth100.0%
BUNGALOW NO A231Stilt Floor 0.0%
BUNGALOW NO A231Slabs of Super Structure100.0%
BUNGALOW NO A231Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A231Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A231Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A231External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A231Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A232Excavation100.0%
BUNGALOW NO A232Basement (if any)100.0%
BUNGALOW NO A232Podiums (if any) 0.0%
BUNGALOW NO A232Plinth100.0%
BUNGALOW NO A232Stilt Floor 0.0%
BUNGALOW NO A232Slabs of Super Structure100.0%
BUNGALOW NO A232Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A232Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A232Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A232External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A232Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A233Excavation100.0%
BUNGALOW NO A233Basement (if any)100.0%
BUNGALOW NO A233Podiums (if any) 0.0%
BUNGALOW NO A233Plinth100.0%
BUNGALOW NO A233Stilt Floor 0.0%
BUNGALOW NO A233Slabs of Super Structure100.0%
BUNGALOW NO A233Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A233Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A233Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A233External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A233Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A234Excavation100.0%
BUNGALOW NO A234Basement (if any)100.0%
BUNGALOW NO A234Podiums (if any) 0.0%
BUNGALOW NO A234Plinth100.0%
BUNGALOW NO A234Stilt Floor 0.0%
BUNGALOW NO A234Slabs of Super Structure100.0%
BUNGALOW NO A234Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A234Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A234Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A234External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A234Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A235Excavation100.0%
BUNGALOW NO A235Basement (if any)100.0%
BUNGALOW NO A235Podiums (if any) 0.0%
BUNGALOW NO A235Plinth100.0%
BUNGALOW NO A235Stilt Floor 0.0%
BUNGALOW NO A235Slabs of Super Structure100.0%
BUNGALOW NO A235Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A235Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A235Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A235External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A235Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A236Excavation100.0%
BUNGALOW NO A236Basement (if any)100.0%
BUNGALOW NO A236Podiums (if any) 0.0%
BUNGALOW NO A236Plinth100.0%
BUNGALOW NO A236Stilt Floor 0.0%
BUNGALOW NO A236Slabs of Super Structure100.0%
BUNGALOW NO A236Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A236Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A236Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A236External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A236Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A237Excavation100.0%
BUNGALOW NO A237Basement (if any)100.0%
BUNGALOW NO A237Podiums (if any) 0.0%
BUNGALOW NO A237Plinth100.0%
BUNGALOW NO A237Stilt Floor 0.0%
BUNGALOW NO A237Slabs of Super Structure100.0%
BUNGALOW NO A237Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A237Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A237Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A237External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A237Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A238Excavation100.0%
BUNGALOW NO A238Basement (if any)100.0%
BUNGALOW NO A238Podiums (if any) 0.0%
BUNGALOW NO A238Plinth100.0%
BUNGALOW NO A238Stilt Floor 0.0%
BUNGALOW NO A238Slabs of Super Structure100.0%
BUNGALOW NO A238Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A238Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A238Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A238External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A238Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A239Excavation100.0%
BUNGALOW NO A239Basement (if any)100.0%
BUNGALOW NO A239Podiums (if any) 0.0%
BUNGALOW NO A239Plinth100.0%
BUNGALOW NO A239Stilt Floor 0.0%
BUNGALOW NO A239Slabs of Super Structure100.0%
BUNGALOW NO A239Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A239Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A239Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A239External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A239Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A240Excavation100.0%
BUNGALOW NO A240Basement (if any)100.0%
BUNGALOW NO A240Podiums (if any) 0.0%
BUNGALOW NO A240Plinth100.0%
BUNGALOW NO A240Stilt Floor 0.0%
BUNGALOW NO A240Slabs of Super Structure100.0%
BUNGALOW NO A240Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A240Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A240Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A240External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A240Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A241Excavation100.0%
BUNGALOW NO A241Basement (if any)100.0%
BUNGALOW NO A241Podiums (if any) 0.0%
BUNGALOW NO A241Plinth100.0%
BUNGALOW NO A241Stilt Floor 0.0%
BUNGALOW NO A241Slabs of Super Structure100.0%
BUNGALOW NO A241Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A241Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A241Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A241External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A241Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A242Excavation100.0%
BUNGALOW NO A242Basement (if any)100.0%
BUNGALOW NO A242Podiums (if any) 0.0%
BUNGALOW NO A242Plinth100.0%
BUNGALOW NO A242Stilt Floor 0.0%
BUNGALOW NO A242Slabs of Super Structure100.0%
BUNGALOW NO A242Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A242Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A242Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A242External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A242Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A243Excavation100.0%
BUNGALOW NO A243Basement (if any)100.0%
BUNGALOW NO A243Podiums (if any) 0.0%
BUNGALOW NO A243Plinth100.0%
BUNGALOW NO A243Stilt Floor 0.0%
BUNGALOW NO A243Slabs of Super Structure100.0%
BUNGALOW NO A243Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A243Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A243Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A243External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A243Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A244Excavation100.0%
BUNGALOW NO A244Basement (if any)100.0%
BUNGALOW NO A244Podiums (if any) 0.0%
BUNGALOW NO A244Plinth100.0%
BUNGALOW NO A244Stilt Floor 0.0%
BUNGALOW NO A244Slabs of Super Structure100.0%
BUNGALOW NO A244Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A244Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A244Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A244External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A244Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A245Excavation100.0%
BUNGALOW NO A245Basement (if any)100.0%
BUNGALOW NO A245Podiums (if any) 0.0%
BUNGALOW NO A245Plinth100.0%
BUNGALOW NO A245Stilt Floor 0.0%
BUNGALOW NO A245Slabs of Super Structure100.0%
BUNGALOW NO A245Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A245Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A245Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A245External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A245Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A246Excavation100.0%
BUNGALOW NO A246Basement (if any)100.0%
BUNGALOW NO A246Podiums (if any) 0.0%
BUNGALOW NO A246Plinth100.0%
BUNGALOW NO A246Stilt Floor 0.0%
BUNGALOW NO A246Slabs of Super Structure100.0%
BUNGALOW NO A246Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A246Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A246Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A246External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A246Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A247Excavation100.0%
BUNGALOW NO A247Basement (if any)100.0%
BUNGALOW NO A247Podiums (if any) 0.0%
BUNGALOW NO A247Plinth100.0%
BUNGALOW NO A247Stilt Floor 0.0%
BUNGALOW NO A247Slabs of Super Structure100.0%
BUNGALOW NO A247Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A247Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A247Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A247External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A247Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A248Excavation100.0%
BUNGALOW NO A248Basement (if any)100.0%
BUNGALOW NO A248Podiums (if any) 0.0%
BUNGALOW NO A248Plinth100.0%
BUNGALOW NO A248Stilt Floor 0.0%
BUNGALOW NO A248Slabs of Super Structure100.0%
BUNGALOW NO A248Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A248Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A248Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A248External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A248Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A249Excavation100.0%
BUNGALOW NO A249Basement (if any)100.0%
BUNGALOW NO A249Podiums (if any) 0.0%
BUNGALOW NO A249Plinth100.0%
BUNGALOW NO A249Stilt Floor 0.0%
BUNGALOW NO A249Slabs of Super Structure100.0%
BUNGALOW NO A249Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A249Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A249Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A249External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A249Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A250Excavation100.0%
BUNGALOW NO A250Basement (if any)100.0%
BUNGALOW NO A250Podiums (if any) 0.0%
BUNGALOW NO A250Plinth100.0%
BUNGALOW NO A250Stilt Floor 0.0%
BUNGALOW NO A250Slabs of Super Structure100.0%
BUNGALOW NO A250Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A250Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A250Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A250External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A250Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A251Excavation100.0%
BUNGALOW NO A251Basement (if any)100.0%
BUNGALOW NO A251Podiums (if any) 0.0%
BUNGALOW NO A251Plinth100.0%
BUNGALOW NO A251Stilt Floor 0.0%
BUNGALOW NO A251Slabs of Super Structure100.0%
BUNGALOW NO A251Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A251Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A251Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69.0%
BUNGALOW NO A251External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A251Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A252Excavation100.0%
BUNGALOW NO A252Basement (if any)100.0%
BUNGALOW NO A252Podiums (if any) 0.0%
BUNGALOW NO A252Plinth100.0%
BUNGALOW NO A252Stilt Floor 0.0%
BUNGALOW NO A252Slabs of Super Structure100.0%
BUNGALOW NO A252Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A252Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A252Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A252External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A252Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A253Excavation100.0%
BUNGALOW NO A253Basement (if any)100.0%
BUNGALOW NO A253Podiums (if any) 0.0%
BUNGALOW NO A253Plinth100.0%
BUNGALOW NO A253Stilt Floor 0.0%
BUNGALOW NO A253Slabs of Super Structure100.0%
BUNGALOW NO A253Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises71.0%
BUNGALOW NO A253Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A253Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85.0%
BUNGALOW NO A253External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A253Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A254Excavation100.0%
BUNGALOW NO A254Basement (if any)100.0%
BUNGALOW NO A254Podiums (if any) 0.0%
BUNGALOW NO A254Plinth100.0%
BUNGALOW NO A254Stilt Floor 0.0%
BUNGALOW NO A254Slabs of Super Structure100.0%
BUNGALOW NO A254Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A254Sanitary Fittings within the flats / premises25.0%
BUNGALOW NO A254Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks69.0%
BUNGALOW NO A254External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A254Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A255Excavation100.0%
BUNGALOW NO A255Basement (if any)100.0%
BUNGALOW NO A255Podiums (if any) 0.0%
BUNGALOW NO A255Plinth100.0%
BUNGALOW NO A255Stilt Floor 0.0%
BUNGALOW NO A255Slabs of Super Structure100.0%
BUNGALOW NO A255Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A255Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A255Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A255External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A255Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A256Excavation100.0%
BUNGALOW NO A256Basement (if any)100.0%
BUNGALOW NO A256Podiums (if any) 0.0%
BUNGALOW NO A256Plinth100.0%
BUNGALOW NO A256Stilt Floor 0.0%
BUNGALOW NO A256Slabs of Super Structure100.0%
BUNGALOW NO A256Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A256Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A256Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A256External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A256Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A257Excavation100.0%
BUNGALOW NO A257Basement (if any)100.0%
BUNGALOW NO A257Podiums (if any) 0.0%
BUNGALOW NO A257Plinth100.0%
BUNGALOW NO A257Stilt Floor 0.0%
BUNGALOW NO A257Slabs of Super Structure100.0%
BUNGALOW NO A257Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A257Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A257Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A257External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A257Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A258Excavation100.0%
BUNGALOW NO A258Basement (if any)100.0%
BUNGALOW NO A258Podiums (if any) 0.0%
BUNGALOW NO A258Plinth100.0%
BUNGALOW NO A258Stilt Floor 0.0%
BUNGALOW NO A258Slabs of Super Structure100.0%
BUNGALOW NO A258Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A258Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A258Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A258External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A258Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A259Excavation100.0%
BUNGALOW NO A259Basement (if any)100.0%
BUNGALOW NO A259Podiums (if any) 0.0%
BUNGALOW NO A259Plinth100.0%
BUNGALOW NO A259Stilt Floor 0.0%
BUNGALOW NO A259Slabs of Super Structure100.0%
BUNGALOW NO A259Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A259Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A259Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A259External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A259Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A260Excavation100.0%
BUNGALOW NO A260Basement (if any)100.0%
BUNGALOW NO A260Podiums (if any) 0.0%
BUNGALOW NO A260Plinth100.0%
BUNGALOW NO A260Stilt Floor 0.0%
BUNGALOW NO A260Slabs of Super Structure100.0%
BUNGALOW NO A260Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A260Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A260Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A260External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A260Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A261Excavation100.0%
BUNGALOW NO A261Basement (if any)100.0%
BUNGALOW NO A261Podiums (if any) 0.0%
BUNGALOW NO A261Plinth100.0%
BUNGALOW NO A261Stilt Floor 0.0%
BUNGALOW NO A261Slabs of Super Structure100.0%
BUNGALOW NO A261Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A261Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A261Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A261External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A261Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A358Excavation100.0%
BUNGALOW NO A358Basement (if any)100.0%
BUNGALOW NO A358Podiums (if any) 0.0%
BUNGALOW NO A358Plinth100.0%
BUNGALOW NO A358Stilt Floor 0.0%
BUNGALOW NO A358Slabs of Super Structure100.0%
BUNGALOW NO A358Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A358Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A358Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A358External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A358Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A359Excavation100.0%
BUNGALOW NO A359Basement (if any)100.0%
BUNGALOW NO A359Podiums (if any) 0.0%
BUNGALOW NO A359Plinth100.0%
BUNGALOW NO A359Stilt Floor 0.0%
BUNGALOW NO A359Slabs of Super Structure100.0%
BUNGALOW NO A359Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A359Sanitary Fittings within the flats / premises10.0%
BUNGALOW NO A359Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
BUNGALOW NO A359External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.83.0%
BUNGALOW NO A359Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A360Excavation100.0%
BUNGALOW NO A360Basement (if any)100.0%
BUNGALOW NO A360Podiums (if any) 0.0%
BUNGALOW NO A360Plinth100.0%
BUNGALOW NO A360Stilt Floor 0.0%
BUNGALOW NO A360Slabs of Super Structure100.0%
BUNGALOW NO A360Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A360Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A360Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A360External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A360Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A361Excavation100.0%
BUNGALOW NO A361Basement (if any)100.0%
BUNGALOW NO A361Podiums (if any) 0.0%
BUNGALOW NO A361Plinth100.0%
BUNGALOW NO A361Stilt Floor 0.0%
BUNGALOW NO A361Slabs of Super Structure100.0%
BUNGALOW NO A361Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A361Sanitary Fittings within the flats / premises10.0%
BUNGALOW NO A361Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
BUNGALOW NO A361External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A361Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A362Excavation100.0%
BUNGALOW NO A362Basement (if any)100.0%
BUNGALOW NO A362Podiums (if any) 0.0%
BUNGALOW NO A362Plinth100.0%
BUNGALOW NO A362Stilt Floor 0.0%
BUNGALOW NO A362Slabs of Super Structure100.0%
BUNGALOW NO A362Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A362Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A362Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40.0%
BUNGALOW NO A362External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A362Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A363Excavation100.0%
BUNGALOW NO A363Basement (if any)100.0%
BUNGALOW NO A363Podiums (if any) 0.0%
BUNGALOW NO A363Plinth100.0%
BUNGALOW NO A363Stilt Floor 0.0%
BUNGALOW NO A363Slabs of Super Structure100.0%
BUNGALOW NO A363Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises52.0%
BUNGALOW NO A363Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A363Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70.0%
BUNGALOW NO A363External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A363Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A364Excavation100.0%
BUNGALOW NO A364Basement (if any)100.0%
BUNGALOW NO A364Podiums (if any) 0.0%
BUNGALOW NO A364Plinth100.0%
BUNGALOW NO A364Stilt Floor 0.0%
BUNGALOW NO A364Slabs of Super Structure100.0%
BUNGALOW NO A364Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A364Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A364Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30.0%
BUNGALOW NO A364External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A364Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A365Excavation100.0%
BUNGALOW NO A365Basement (if any)100.0%
BUNGALOW NO A365Podiums (if any) 0.0%
BUNGALOW NO A365Plinth100.0%
BUNGALOW NO A365Stilt Floor 0.0%
BUNGALOW NO A365Slabs of Super Structure100.0%
BUNGALOW NO A365Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A365Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A365Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A365External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A365Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A366Excavation100.0%
BUNGALOW NO A366Basement (if any)100.0%
BUNGALOW NO A366Podiums (if any) 0.0%
BUNGALOW NO A366Plinth100.0%
BUNGALOW NO A366Stilt Floor 0.0%
BUNGALOW NO A366Slabs of Super Structure100.0%
BUNGALOW NO A366Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A366Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A366Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A366External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A366Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A367Excavation100.0%
BUNGALOW NO A367Basement (if any)100.0%
BUNGALOW NO A367Podiums (if any) 0.0%
BUNGALOW NO A367Plinth100.0%
BUNGALOW NO A367Stilt Floor 0.0%
BUNGALOW NO A367Slabs of Super Structure100.0%
BUNGALOW NO A367Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A367Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A367Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A367External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A367Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A368Excavation100.0%
BUNGALOW NO A368Basement (if any)100.0%
BUNGALOW NO A368Podiums (if any) 0.0%
BUNGALOW NO A368Plinth100.0%
BUNGALOW NO A368Stilt Floor 0.0%
BUNGALOW NO A368Slabs of Super Structure100.0%
BUNGALOW NO A368Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A368Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A368Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks81.0%
BUNGALOW NO A368External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A368Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25.0%
BUNGALOW NO A369Excavation100.0%
BUNGALOW NO A369Basement (if any)100.0%
BUNGALOW NO A369Podiums (if any) 0.0%
BUNGALOW NO A369Plinth100.0%
BUNGALOW NO A369Stilt Floor 0.0%
BUNGALOW NO A369Slabs of Super Structure100.0%
BUNGALOW NO A369Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A369Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A369Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A369External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A369Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A370Excavation100.0%
BUNGALOW NO A370Basement (if any)100.0%
BUNGALOW NO A370Podiums (if any) 0.0%
BUNGALOW NO A370Plinth100.0%
BUNGALOW NO A370Stilt Floor 0.0%
BUNGALOW NO A370Slabs of Super Structure100.0%
BUNGALOW NO A370Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A370Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A370Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A370External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A370Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A371Excavation100.0%
BUNGALOW NO A371Basement (if any)100.0%
BUNGALOW NO A371Podiums (if any) 0.0%
BUNGALOW NO A371Plinth100.0%
BUNGALOW NO A371Stilt Floor 0.0%
BUNGALOW NO A371Slabs of Super Structure100.0%
BUNGALOW NO A371Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A371Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A371Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A371External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A371Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A372Excavation100.0%
BUNGALOW NO A372Basement (if any)100.0%
BUNGALOW NO A372Podiums (if any) 0.0%
BUNGALOW NO A372Plinth100.0%
BUNGALOW NO A372Stilt Floor 0.0%
BUNGALOW NO A372Slabs of Super Structure100.0%
BUNGALOW NO A372Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A372Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A372Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A372External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A372Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A373Excavation100.0%
BUNGALOW NO A373Basement (if any)100.0%
BUNGALOW NO A373Podiums (if any) 0.0%
BUNGALOW NO A373Plinth100.0%
BUNGALOW NO A373Stilt Floor 0.0%
BUNGALOW NO A373Slabs of Super Structure100.0%
BUNGALOW NO A373Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A373Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A373Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A373External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A373Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A374Excavation100.0%
BUNGALOW NO A374Basement (if any)100.0%
BUNGALOW NO A374Podiums (if any) 0.0%
BUNGALOW NO A374Plinth100.0%
BUNGALOW NO A374Stilt Floor 0.0%
BUNGALOW NO A374Slabs of Super Structure100.0%
BUNGALOW NO A374Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A374Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A374Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A374External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A374Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A375Excavation100.0%
BUNGALOW NO A375Basement (if any)100.0%
BUNGALOW NO A375Podiums (if any) 0.0%
BUNGALOW NO A375Plinth100.0%
BUNGALOW NO A375Stilt Floor 0.0%
BUNGALOW NO A375Slabs of Super Structure100.0%
BUNGALOW NO A375Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A375Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A375Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A375External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A375Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A376Excavation0.0%
BUNGALOW NO A376Basement (if any)0.0%
BUNGALOW NO A376Podiums (if any) 0.0%
BUNGALOW NO A376Plinth0.0%
BUNGALOW NO A376Stilt Floor 0.0%
BUNGALOW NO A376Slabs of Super Structure0.0%
BUNGALOW NO A376Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A376Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A376Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A376External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A376Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A377Excavation100.0%
BUNGALOW NO A377Basement (if any)100.0%
BUNGALOW NO A377Podiums (if any) 0.0%
BUNGALOW NO A377Plinth100.0%
BUNGALOW NO A377Stilt Floor 0.0%
BUNGALOW NO A377Slabs of Super Structure100.0%
BUNGALOW NO A377Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A377Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A377Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A377External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A377Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A378Excavation100.0%
BUNGALOW NO A378Basement (if any)100.0%
BUNGALOW NO A378Podiums (if any) 0.0%
BUNGALOW NO A378Plinth100.0%
BUNGALOW NO A378Stilt Floor 0.0%
BUNGALOW NO A378Slabs of Super Structure100.0%
BUNGALOW NO A378Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A378Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A378Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A378External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A378Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A379Excavation100.0%
BUNGALOW NO A379Basement (if any)100.0%
BUNGALOW NO A379Podiums (if any) 0.0%
BUNGALOW NO A379Plinth100.0%
BUNGALOW NO A379Stilt Floor 0.0%
BUNGALOW NO A379Slabs of Super Structure100.0%
BUNGALOW NO A379Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A379Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A379Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A379External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A379Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A380Excavation100.0%
BUNGALOW NO A380Basement (if any)100.0%
BUNGALOW NO A380Podiums (if any) 0.0%
BUNGALOW NO A380Plinth100.0%
BUNGALOW NO A380Stilt Floor 0.0%
BUNGALOW NO A380Slabs of Super Structure100.0%
BUNGALOW NO A380Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A380Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A380Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A380External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A380Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A381Excavation100.0%
BUNGALOW NO A381Basement (if any)100.0%
BUNGALOW NO A381Podiums (if any) 0.0%
BUNGALOW NO A381Plinth100.0%
BUNGALOW NO A381Stilt Floor 0.0%
BUNGALOW NO A381Slabs of Super Structure100.0%
BUNGALOW NO A381Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20.0%
BUNGALOW NO A381Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A381Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A381External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A381Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A382Excavation100.0%
BUNGALOW NO A382Basement (if any)100.0%
BUNGALOW NO A382Podiums (if any) 0.0%
BUNGALOW NO A382Plinth100.0%
BUNGALOW NO A382Stilt Floor 0.0%
BUNGALOW NO A382Slabs of Super Structure0.0%
BUNGALOW NO A382Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A382Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A382Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A382External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A382Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A383Excavation100.0%
BUNGALOW NO A383Basement (if any)100.0%
BUNGALOW NO A383Podiums (if any) 0.0%
BUNGALOW NO A383Plinth100.0%
BUNGALOW NO A383Stilt Floor 0.0%
BUNGALOW NO A383Slabs of Super Structure0.0%
BUNGALOW NO A383Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A383Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A383Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A383External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A383Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A384Excavation100.0%
BUNGALOW NO A384Basement (if any)100.0%
BUNGALOW NO A384Podiums (if any) 0.0%
BUNGALOW NO A384Plinth100.0%
BUNGALOW NO A384Stilt Floor 0.0%
BUNGALOW NO A384Slabs of Super Structure100.0%
BUNGALOW NO A384Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
BUNGALOW NO A384Sanitary Fittings within the flats / premises75.0%
BUNGALOW NO A384Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks76.0%
BUNGALOW NO A384External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A384Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A385Excavation100.0%
BUNGALOW NO A385Basement (if any)100.0%
BUNGALOW NO A385Podiums (if any) 0.0%
BUNGALOW NO A385Plinth100.0%
BUNGALOW NO A385Stilt Floor 0.0%
BUNGALOW NO A385Slabs of Super Structure100.0%
BUNGALOW NO A385Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A385Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A385Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A385External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A385Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A386Excavation100.0%
BUNGALOW NO A386Basement (if any)100.0%
BUNGALOW NO A386Podiums (if any) 0.0%
BUNGALOW NO A386Plinth100.0%
BUNGALOW NO A386Stilt Floor 0.0%
BUNGALOW NO A386Slabs of Super Structure100.0%
BUNGALOW NO A386Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A386Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A386Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A386External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A386Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A387Excavation100.0%
BUNGALOW NO A387Basement (if any)100.0%
BUNGALOW NO A387Podiums (if any) 0.0%
BUNGALOW NO A387Plinth100.0%
BUNGALOW NO A387Stilt Floor 0.0%
BUNGALOW NO A387Slabs of Super Structure100.0%
BUNGALOW NO A387Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A387Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A387Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A387External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.43.0%
BUNGALOW NO A387Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A388Excavation100.0%
BUNGALOW NO A388Basement (if any)100.0%
BUNGALOW NO A388Podiums (if any) 0.0%
BUNGALOW NO A388Plinth100.0%
BUNGALOW NO A388Stilt Floor 0.0%
BUNGALOW NO A388Slabs of Super Structure100.0%
BUNGALOW NO A388Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A388Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A388Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A388External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A388Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A389Excavation100.0%
BUNGALOW NO A389Basement (if any)100.0%
BUNGALOW NO A389Podiums (if any) 0.0%
BUNGALOW NO A389Plinth100.0%
BUNGALOW NO A389Stilt Floor 0.0%
BUNGALOW NO A389Slabs of Super Structure100.0%
BUNGALOW NO A389Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A389Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A389Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A389External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A389Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A390Excavation100.0%
BUNGALOW NO A390Basement (if any)100.0%
BUNGALOW NO A390Podiums (if any) 0.0%
BUNGALOW NO A390Plinth100.0%
BUNGALOW NO A390Stilt Floor 0.0%
BUNGALOW NO A390Slabs of Super Structure100.0%
BUNGALOW NO A390Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A390Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A390Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A390External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A390Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A391Excavation100.0%
BUNGALOW NO A391Basement (if any)100.0%
BUNGALOW NO A391Podiums (if any) 0.0%
BUNGALOW NO A391Plinth100.0%
BUNGALOW NO A391Stilt Floor 0.0%
BUNGALOW NO A391Slabs of Super Structure100.0%
BUNGALOW NO A391Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A391Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A391Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A391External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A391Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A392Excavation100.0%
BUNGALOW NO A392Basement (if any)100.0%
BUNGALOW NO A392Podiums (if any) 0.0%
BUNGALOW NO A392Plinth100.0%
BUNGALOW NO A392Stilt Floor 0.0%
BUNGALOW NO A392Slabs of Super Structure100.0%
BUNGALOW NO A392Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A392Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A392Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50.0%
BUNGALOW NO A392External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A392Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A393Excavation100.0%
BUNGALOW NO A393Basement (if any)100.0%
BUNGALOW NO A393Podiums (if any) 0.0%
BUNGALOW NO A393Plinth100.0%
BUNGALOW NO A393Stilt Floor 0.0%
BUNGALOW NO A393Slabs of Super Structure100.0%
BUNGALOW NO A393Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A393Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A393Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A393External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A393Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A394Excavation100.0%
BUNGALOW NO A394Basement (if any)100.0%
BUNGALOW NO A394Podiums (if any) 0.0%
BUNGALOW NO A394Plinth100.0%
BUNGALOW NO A394Stilt Floor 0.0%
BUNGALOW NO A394Slabs of Super Structure100.0%
BUNGALOW NO A394Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises96.0%
BUNGALOW NO A394Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A394Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93.0%
BUNGALOW NO A394External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A394Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A395Excavation100.0%
BUNGALOW NO A395Basement (if any)100.0%
BUNGALOW NO A395Podiums (if any) 0.0%
BUNGALOW NO A395Plinth100.0%
BUNGALOW NO A395Stilt Floor 0.0%
BUNGALOW NO A395Slabs of Super Structure100.0%
BUNGALOW NO A395Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42.0%
BUNGALOW NO A395Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A395Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80.0%
BUNGALOW NO A395External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80.0%
BUNGALOW NO A395Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A396Excavation100.0%
BUNGALOW NO A396Basement (if any)100.0%
BUNGALOW NO A396Podiums (if any) 0.0%
BUNGALOW NO A396Plinth100.0%
BUNGALOW NO A396Stilt Floor 0.0%
BUNGALOW NO A396Slabs of Super Structure100.0%
BUNGALOW NO A396Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A396Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A396Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A396External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A396Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A397Excavation100.0%
BUNGALOW NO A397Basement (if any)100.0%
BUNGALOW NO A397Podiums (if any) 0.0%
BUNGALOW NO A397Plinth100.0%
BUNGALOW NO A397Stilt Floor 0.0%
BUNGALOW NO A397Slabs of Super Structure100.0%
BUNGALOW NO A397Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A397Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A397Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A397External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A397Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A398Excavation100.0%
BUNGALOW NO A398Basement (if any)100.0%
BUNGALOW NO A398Podiums (if any) 0.0%
BUNGALOW NO A398Plinth100.0%
BUNGALOW NO A398Stilt Floor 0.0%
BUNGALOW NO A398Slabs of Super Structure100.0%
BUNGALOW NO A398Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A398Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A398Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A398External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A398Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A399Excavation100.0%
BUNGALOW NO A399Basement (if any)100.0%
BUNGALOW NO A399Podiums (if any) 0.0%
BUNGALOW NO A399Plinth100.0%
BUNGALOW NO A399Stilt Floor 0.0%
BUNGALOW NO A399Slabs of Super Structure100.0%
BUNGALOW NO A399Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A399Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A399Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks17.0%
BUNGALOW NO A399External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A399Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A400Excavation100.0%
BUNGALOW NO A400Basement (if any)100.0%
BUNGALOW NO A400Podiums (if any) 0.0%
BUNGALOW NO A400Plinth100.0%
BUNGALOW NO A400Stilt Floor 0.0%
BUNGALOW NO A400Slabs of Super Structure100.0%
BUNGALOW NO A400Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A400Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A400Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A400External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A400Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A401Excavation100.0%
BUNGALOW NO A401Basement (if any)100.0%
BUNGALOW NO A401Podiums (if any) 0.0%
BUNGALOW NO A401Plinth100.0%
BUNGALOW NO A401Stilt Floor 0.0%
BUNGALOW NO A401Slabs of Super Structure100.0%
BUNGALOW NO A401Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A401Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A401Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A401External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A401Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A402Excavation100.0%
BUNGALOW NO A402Basement (if any)100.0%
BUNGALOW NO A402Podiums (if any) 0.0%
BUNGALOW NO A402Plinth100.0%
BUNGALOW NO A402Stilt Floor 0.0%
BUNGALOW NO A402Slabs of Super Structure100.0%
BUNGALOW NO A402Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A402Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A402Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A402External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A402Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A403Excavation100.0%
BUNGALOW NO A403Basement (if any)100.0%
BUNGALOW NO A403Podiums (if any) 0.0%
BUNGALOW NO A403Plinth100.0%
BUNGALOW NO A403Stilt Floor 0.0%
BUNGALOW NO A403Slabs of Super Structure100.0%
BUNGALOW NO A403Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A403Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A403Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A403External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A403Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A404Excavation100.0%
BUNGALOW NO A404Basement (if any)100.0%
BUNGALOW NO A404Podiums (if any) 0.0%
BUNGALOW NO A404Plinth100.0%
BUNGALOW NO A404Stilt Floor 0.0%
BUNGALOW NO A404Slabs of Super Structure100.0%
BUNGALOW NO A404Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A404Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A404Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A404External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A404Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A405Excavation100.0%
BUNGALOW NO A405Basement (if any)100.0%
BUNGALOW NO A405Podiums (if any) 0.0%
BUNGALOW NO A405Plinth100.0%
BUNGALOW NO A405Stilt Floor 0.0%
BUNGALOW NO A405Slabs of Super Structure100.0%
BUNGALOW NO A405Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A405Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A405Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A405External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A405Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A406Excavation100.0%
BUNGALOW NO A406Basement (if any)100.0%
BUNGALOW NO A406Podiums (if any) 0.0%
BUNGALOW NO A406Plinth100.0%
BUNGALOW NO A406Stilt Floor 0.0%
BUNGALOW NO A406Slabs of Super Structure100.0%
BUNGALOW NO A406Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A406Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A406Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A406External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A406Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A407Excavation100.0%
BUNGALOW NO A407Basement (if any)100.0%
BUNGALOW NO A407Podiums (if any) 0.0%
BUNGALOW NO A407Plinth100.0%
BUNGALOW NO A407Stilt Floor 0.0%
BUNGALOW NO A407Slabs of Super Structure100.0%
BUNGALOW NO A407Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A407Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A407Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A407External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A407Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A408Excavation100.0%
BUNGALOW NO A408Basement (if any)100.0%
BUNGALOW NO A408Podiums (if any) 0.0%
BUNGALOW NO A408Plinth100.0%
BUNGALOW NO A408Stilt Floor 0.0%
BUNGALOW NO A408Slabs of Super Structure100.0%
BUNGALOW NO A408Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A408Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A408Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A408External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A408Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A409Excavation100.0%
BUNGALOW NO A409Basement (if any)100.0%
BUNGALOW NO A409Podiums (if any) 0.0%
BUNGALOW NO A409Plinth100.0%
BUNGALOW NO A409Stilt Floor 0.0%
BUNGALOW NO A409Slabs of Super Structure100.0%
BUNGALOW NO A409Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A409Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A409Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A409External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A409Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A410Excavation100.0%
BUNGALOW NO A410Basement (if any)100.0%
BUNGALOW NO A410Podiums (if any) 0.0%
BUNGALOW NO A410Plinth100.0%
BUNGALOW NO A410Stilt Floor 0.0%
BUNGALOW NO A410Slabs of Super Structure100.0%
BUNGALOW NO A410Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A410Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A410Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A410External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A410Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A411Excavation100.0%
BUNGALOW NO A411Basement (if any)100.0%
BUNGALOW NO A411Podiums (if any) 0.0%
BUNGALOW NO A411Plinth100.0%
BUNGALOW NO A411Stilt Floor 0.0%
BUNGALOW NO A411Slabs of Super Structure100.0%
BUNGALOW NO A411Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A411Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A411Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A411External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A411Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A412Excavation100.0%
BUNGALOW NO A412Basement (if any)100.0%
BUNGALOW NO A412Podiums (if any) 0.0%
BUNGALOW NO A412Plinth100.0%
BUNGALOW NO A412Stilt Floor 0.0%
BUNGALOW NO A412Slabs of Super Structure100.0%
BUNGALOW NO A412Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A412Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A412Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A412External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A412Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A413Excavation100.0%
BUNGALOW NO A413Basement (if any)100.0%
BUNGALOW NO A413Podiums (if any) 0.0%
BUNGALOW NO A413Plinth100.0%
BUNGALOW NO A413Stilt Floor 0.0%
BUNGALOW NO A413Slabs of Super Structure100.0%
BUNGALOW NO A413Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A413Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A413Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A413External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A413Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A414Excavation100.0%
BUNGALOW NO A414Basement (if any)100.0%
BUNGALOW NO A414Podiums (if any) 0.0%
BUNGALOW NO A414Plinth100.0%
BUNGALOW NO A414Stilt Floor 0.0%
BUNGALOW NO A414Slabs of Super Structure100.0%
BUNGALOW NO A414Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A414Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A414Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A414External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A414Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A415Excavation100.0%
BUNGALOW NO A415Basement (if any)100.0%
BUNGALOW NO A415Podiums (if any) 0.0%
BUNGALOW NO A415Plinth100.0%
BUNGALOW NO A415Stilt Floor 0.0%
BUNGALOW NO A415Slabs of Super Structure100.0%
BUNGALOW NO A415Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises48.0%
BUNGALOW NO A415Sanitary Fittings within the flats / premises38.0%
BUNGALOW NO A415Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73.0%
BUNGALOW NO A415External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A415Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A416Excavation100.0%
BUNGALOW NO A416Basement (if any)100.0%
BUNGALOW NO A416Podiums (if any) 0.0%
BUNGALOW NO A416Plinth100.0%
BUNGALOW NO A416Stilt Floor 0.0%
BUNGALOW NO A416Slabs of Super Structure100.0%
BUNGALOW NO A416Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A416Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A416Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A416External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A416Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A417Excavation100.0%
BUNGALOW NO A417Basement (if any)100.0%
BUNGALOW NO A417Podiums (if any) 0.0%
BUNGALOW NO A417Plinth100.0%
BUNGALOW NO A417Stilt Floor 0.0%
BUNGALOW NO A417Slabs of Super Structure100.0%
BUNGALOW NO A417Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A417Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A417Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A417External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A417Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A418Excavation100.0%
BUNGALOW NO A418Basement (if any)100.0%
BUNGALOW NO A418Podiums (if any) 0.0%
BUNGALOW NO A418Plinth100.0%
BUNGALOW NO A418Stilt Floor 0.0%
BUNGALOW NO A418Slabs of Super Structure100.0%
BUNGALOW NO A418Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A418Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A418Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A418External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A418Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A419Excavation100.0%
BUNGALOW NO A419Basement (if any)100.0%
BUNGALOW NO A419Podiums (if any) 0.0%
BUNGALOW NO A419Plinth100.0%
BUNGALOW NO A419Stilt Floor 0.0%
BUNGALOW NO A419Slabs of Super Structure100.0%
BUNGALOW NO A419Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A419Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A419Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A419External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A419Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A420Excavation100.0%
BUNGALOW NO A420Basement (if any)100.0%
BUNGALOW NO A420Podiums (if any) 0.0%
BUNGALOW NO A420Plinth100.0%
BUNGALOW NO A420Stilt Floor 0.0%
BUNGALOW NO A420Slabs of Super Structure100.0%
BUNGALOW NO A420Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A420Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A420Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A420External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A420Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70.0%
BUNGALOW NO A421Excavation100.0%
BUNGALOW NO A421Basement (if any)100.0%
BUNGALOW NO A421Podiums (if any) 0.0%
BUNGALOW NO A421Plinth100.0%
BUNGALOW NO A421Stilt Floor 0.0%
BUNGALOW NO A421Slabs of Super Structure100.0%
BUNGALOW NO A421Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A421Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A421Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A421External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A421Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A422Excavation100.0%
BUNGALOW NO A422Basement (if any)100.0%
BUNGALOW NO A422Podiums (if any) 0.0%
BUNGALOW NO A422Plinth100.0%
BUNGALOW NO A422Stilt Floor 0.0%
BUNGALOW NO A422Slabs of Super Structure100.0%
BUNGALOW NO A422Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A422Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A422Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A422External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A422Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A423Excavation100.0%
BUNGALOW NO A423Basement (if any)100.0%
BUNGALOW NO A423Podiums (if any) 0.0%
BUNGALOW NO A423Plinth100.0%
BUNGALOW NO A423Stilt Floor 0.0%
BUNGALOW NO A423Slabs of Super Structure100.0%
BUNGALOW NO A423Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A423Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A423Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A423External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A423Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A424Excavation100.0%
BUNGALOW NO A424Basement (if any)100.0%
BUNGALOW NO A424Podiums (if any) 0.0%
BUNGALOW NO A424Plinth100.0%
BUNGALOW NO A424Stilt Floor 0.0%
BUNGALOW NO A424Slabs of Super Structure100.0%
BUNGALOW NO A424Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A424Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A424Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A424External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A424Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A425Excavation100.0%
BUNGALOW NO A425Basement (if any)100.0%
BUNGALOW NO A425Podiums (if any) 0.0%
BUNGALOW NO A425Plinth100.0%
BUNGALOW NO A425Stilt Floor 0.0%
BUNGALOW NO A425Slabs of Super Structure100.0%
BUNGALOW NO A425Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A425Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A425Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A425External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A425Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A426Excavation100.0%
BUNGALOW NO A426Basement (if any)100.0%
BUNGALOW NO A426Podiums (if any) 0.0%
BUNGALOW NO A426Plinth100.0%
BUNGALOW NO A426Stilt Floor 0.0%
BUNGALOW NO A426Slabs of Super Structure100.0%
BUNGALOW NO A426Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A426Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A426Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A426External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A426Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A427Excavation100.0%
BUNGALOW NO A427Basement (if any)100.0%
BUNGALOW NO A427Podiums (if any) 0.0%
BUNGALOW NO A427Plinth100.0%
BUNGALOW NO A427Stilt Floor 0.0%
BUNGALOW NO A427Slabs of Super Structure100.0%
BUNGALOW NO A427Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A427Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A427Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A427External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A427Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A428Excavation100.0%
BUNGALOW NO A428Basement (if any)100.0%
BUNGALOW NO A428Podiums (if any) 0.0%
BUNGALOW NO A428Plinth100.0%
BUNGALOW NO A428Stilt Floor 0.0%
BUNGALOW NO A428Slabs of Super Structure100.0%
BUNGALOW NO A428Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A428Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A428Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A428External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A428Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A429Excavation100.0%
BUNGALOW NO A429Basement (if any)100.0%
BUNGALOW NO A429Podiums (if any) 0.0%
BUNGALOW NO A429Plinth100.0%
BUNGALOW NO A429Stilt Floor 0.0%
BUNGALOW NO A429Slabs of Super Structure0.0%
BUNGALOW NO A429Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A429Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A429Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A429External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A429Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A430Excavation100.0%
BUNGALOW NO A430Basement (if any)100.0%
BUNGALOW NO A430Podiums (if any) 0.0%
BUNGALOW NO A430Plinth100.0%
BUNGALOW NO A430Stilt Floor 0.0%
BUNGALOW NO A430Slabs of Super Structure0.0%
BUNGALOW NO A430Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A430Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A430Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A430External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A430Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A431Excavation100.0%
BUNGALOW NO A431Basement (if any)100.0%
BUNGALOW NO A431Podiums (if any) 0.0%
BUNGALOW NO A431Plinth100.0%
BUNGALOW NO A431Stilt Floor 0.0%
BUNGALOW NO A431Slabs of Super Structure0.0%
BUNGALOW NO A431Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A431Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A431Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A431External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A431Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A432Excavation100.0%
BUNGALOW NO A432Basement (if any)100.0%
BUNGALOW NO A432Podiums (if any) 0.0%
BUNGALOW NO A432Plinth100.0%
BUNGALOW NO A432Stilt Floor 0.0%
BUNGALOW NO A432Slabs of Super Structure0.0%
BUNGALOW NO A432Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A432Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A432Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A432External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A432Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A433Excavation100.0%
BUNGALOW NO A433Basement (if any)100.0%
BUNGALOW NO A433Podiums (if any) 0.0%
BUNGALOW NO A433Plinth100.0%
BUNGALOW NO A433Stilt Floor 0.0%
BUNGALOW NO A433Slabs of Super Structure100.0%
BUNGALOW NO A433Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A433Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A433Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A433External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A433Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A434Excavation100.0%
BUNGALOW NO A434Basement (if any)100.0%
BUNGALOW NO A434Podiums (if any) 0.0%
BUNGALOW NO A434Plinth100.0%
BUNGALOW NO A434Stilt Floor 0.0%
BUNGALOW NO A434Slabs of Super Structure0.0%
BUNGALOW NO A434Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A434Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A434Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A434External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A434Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A435Excavation100.0%
BUNGALOW NO A435Basement (if any)100.0%
BUNGALOW NO A435Podiums (if any) 0.0%
BUNGALOW NO A435Plinth100.0%
BUNGALOW NO A435Stilt Floor 0.0%
BUNGALOW NO A435Slabs of Super Structure100.0%
BUNGALOW NO A435Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises76.0%
BUNGALOW NO A435Sanitary Fittings within the flats / premises50.0%
BUNGALOW NO A435Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93.0%
BUNGALOW NO A435External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A435Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50.0%
BUNGALOW NO A436Excavation100.0%
BUNGALOW NO A436Basement (if any)100.0%
BUNGALOW NO A436Podiums (if any) 0.0%
BUNGALOW NO A436Plinth100.0%
BUNGALOW NO A436Stilt Floor 0.0%
BUNGALOW NO A436Slabs of Super Structure100.0%
BUNGALOW NO A436Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A436Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A436Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A436External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A436Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A437Excavation100.0%
BUNGALOW NO A437Basement (if any)100.0%
BUNGALOW NO A437Podiums (if any) 0.0%
BUNGALOW NO A437Plinth100.0%
BUNGALOW NO A437Stilt Floor 0.0%
BUNGALOW NO A437Slabs of Super Structure100.0%
BUNGALOW NO A437Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60.0%
BUNGALOW NO A437Sanitary Fittings within the flats / premises10.0%
BUNGALOW NO A437Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks47.0%
BUNGALOW NO A437External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A437Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A438Excavation100.0%
BUNGALOW NO A438Basement (if any)100.0%
BUNGALOW NO A438Podiums (if any) 0.0%
BUNGALOW NO A438Plinth100.0%
BUNGALOW NO A438Stilt Floor 0.0%
BUNGALOW NO A438Slabs of Super Structure0.0%
BUNGALOW NO A438Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A438Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A438Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A438External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A438Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A439Excavation100.0%
BUNGALOW NO A439Basement (if any)100.0%
BUNGALOW NO A439Podiums (if any) 0.0%
BUNGALOW NO A439Plinth100.0%
BUNGALOW NO A439Stilt Floor 0.0%
BUNGALOW NO A439Slabs of Super Structure0.0%
BUNGALOW NO A439Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A439Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A439Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A439External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A439Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A440Excavation100.0%
BUNGALOW NO A440Basement (if any)100.0%
BUNGALOW NO A440Podiums (if any) 0.0%
BUNGALOW NO A440Plinth100.0%
BUNGALOW NO A440Stilt Floor 0.0%
BUNGALOW NO A440Slabs of Super Structure0.0%
BUNGALOW NO A440Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A440Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A440Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A440External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A440Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A441Excavation100.0%
BUNGALOW NO A441Basement (if any)100.0%
BUNGALOW NO A441Podiums (if any) 0.0%
BUNGALOW NO A441Plinth100.0%
BUNGALOW NO A441Stilt Floor 0.0%
BUNGALOW NO A441Slabs of Super Structure0.0%
BUNGALOW NO A441Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A441Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A441Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A441External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A441Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A442Excavation100.0%
BUNGALOW NO A442Basement (if any)100.0%
BUNGALOW NO A442Podiums (if any) 0.0%
BUNGALOW NO A442Plinth100.0%
BUNGALOW NO A442Stilt Floor 0.0%
BUNGALOW NO A442Slabs of Super Structure100.0%
BUNGALOW NO A442Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A442Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A442Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33.0%
BUNGALOW NO A442External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A442Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A443Excavation100.0%
BUNGALOW NO A443Basement (if any)100.0%
BUNGALOW NO A443Podiums (if any) 0.0%
BUNGALOW NO A443Plinth100.0%
BUNGALOW NO A443Stilt Floor 0.0%
BUNGALOW NO A443Slabs of Super Structure100.0%
BUNGALOW NO A443Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A443Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A443Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A443External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A443Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80.0%
BUNGALOW NO A444Excavation100.0%
BUNGALOW NO A444Basement (if any)100.0%
BUNGALOW NO A444Podiums (if any) 0.0%
BUNGALOW NO A444Plinth100.0%
BUNGALOW NO A444Stilt Floor 0.0%
BUNGALOW NO A444Slabs of Super Structure100.0%
BUNGALOW NO A444Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A444Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A444Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A444External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A444Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A445Excavation100.0%
BUNGALOW NO A445Basement (if any)100.0%
BUNGALOW NO A445Podiums (if any) 0.0%
BUNGALOW NO A445Plinth100.0%
BUNGALOW NO A445Stilt Floor 0.0%
BUNGALOW NO A445Slabs of Super Structure100.0%
BUNGALOW NO A445Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A445Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A445Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33.0%
BUNGALOW NO A445External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A445Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A446Excavation100.0%
BUNGALOW NO A446Basement (if any)100.0%
BUNGALOW NO A446Podiums (if any) 0.0%
BUNGALOW NO A446Plinth100.0%
BUNGALOW NO A446Stilt Floor 0.0%
BUNGALOW NO A446Slabs of Super Structure100.0%
BUNGALOW NO A446Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A446Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A446Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A446External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A446Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A447Excavation100.0%
BUNGALOW NO A447Basement (if any)100.0%
BUNGALOW NO A447Podiums (if any) 0.0%
BUNGALOW NO A447Plinth100.0%
BUNGALOW NO A447Stilt Floor 0.0%
BUNGALOW NO A447Slabs of Super Structure0.0%
BUNGALOW NO A447Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A447Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A447Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A447External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A447Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A448Excavation100.0%
BUNGALOW NO A448Basement (if any)100.0%
BUNGALOW NO A448Podiums (if any) 0.0%
BUNGALOW NO A448Plinth100.0%
BUNGALOW NO A448Stilt Floor 0.0%
BUNGALOW NO A448Slabs of Super Structure0.0%
BUNGALOW NO A448Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A448Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A448Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A448External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A448Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A449Excavation100.0%
BUNGALOW NO A449Basement (if any)100.0%
BUNGALOW NO A449Podiums (if any) 0.0%
BUNGALOW NO A449Plinth100.0%
BUNGALOW NO A449Stilt Floor 0.0%
BUNGALOW NO A449Slabs of Super Structure100.0%
BUNGALOW NO A449Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A449Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A449Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A449External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A449Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100.0%
BUNGALOW NO A450Excavation100.0%
BUNGALOW NO A450Basement (if any)100.0%
BUNGALOW NO A450Podiums (if any) 0.0%
BUNGALOW NO A450Plinth100.0%
BUNGALOW NO A450Stilt Floor 0.0%
BUNGALOW NO A450Slabs of Super Structure100.0%
BUNGALOW NO A450Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A450Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A450Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A450External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A450Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A451Excavation100.0%
BUNGALOW NO A451Basement (if any)100.0%
BUNGALOW NO A451Podiums (if any) 0.0%
BUNGALOW NO A451Plinth100.0%
BUNGALOW NO A451Stilt Floor 0.0%
BUNGALOW NO A451Slabs of Super Structure100.0%
BUNGALOW NO A451Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A451Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A451Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A451External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A451Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70.0%
BUNGALOW NO A452Excavation100.0%
BUNGALOW NO A452Basement (if any)0.0%
BUNGALOW NO A452Podiums (if any) 0.0%
BUNGALOW NO A452Plinth0.0%
BUNGALOW NO A452Stilt Floor 0.0%
BUNGALOW NO A452Slabs of Super Structure0.0%
BUNGALOW NO A452Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A452Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A452Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A452External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A452Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A453Excavation0.0%
BUNGALOW NO A453Basement (if any)0.0%
BUNGALOW NO A453Podiums (if any) 0.0%
BUNGALOW NO A453Plinth0.0%
BUNGALOW NO A453Stilt Floor 0.0%
BUNGALOW NO A453Slabs of Super Structure0.0%
BUNGALOW NO A453Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A453Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A453Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A453External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A453Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A454Excavation0.0%
BUNGALOW NO A454Basement (if any)0.0%
BUNGALOW NO A454Podiums (if any) 0.0%
BUNGALOW NO A454Plinth0.0%
BUNGALOW NO A454Stilt Floor 0.0%
BUNGALOW NO A454Slabs of Super Structure0.0%
BUNGALOW NO A454Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUNGALOW NO A454Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A454Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUNGALOW NO A454External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUNGALOW NO A454Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A455Excavation100.0%
BUNGALOW NO A455Basement (if any)100.0%
BUNGALOW NO A455Podiums (if any) 0.0%
BUNGALOW NO A455Plinth100.0%
BUNGALOW NO A455Stilt Floor 0.0%
BUNGALOW NO A455Slabs of Super Structure100.0%
BUNGALOW NO A455Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A455Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A455Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A455External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A455Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A456Excavation100.0%
BUNGALOW NO A456Basement (if any)100.0%
BUNGALOW NO A456Podiums (if any) 0.0%
BUNGALOW NO A456Plinth100.0%
BUNGALOW NO A456Stilt Floor 0.0%
BUNGALOW NO A456Slabs of Super Structure100.0%
BUNGALOW NO A456Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100.0%
BUNGALOW NO A456Sanitary Fittings within the flats / premises100.0%
BUNGALOW NO A456Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100.0%
BUNGALOW NO A456External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100.0%
BUNGALOW NO A456Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90.0%
BUNGALOW NO A457Excavation100.0%
BUNGALOW NO A457Basement (if any)100.0%
BUNGALOW NO A457Podiums (if any) 0.0%
BUNGALOW NO A457Plinth100.0%
BUNGALOW NO A457Stilt Floor 0.0%
BUNGALOW NO A457Slabs of Super Structure100.0%
BUNGALOW NO A457Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A457Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A457Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33.0%
BUNGALOW NO A457External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.77.0%
BUNGALOW NO A457Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUNGALOW NO A458Excavation100.0%
BUNGALOW NO A458Basement (if any)100.0%
BUNGALOW NO A458Podiums (if any) 0.0%
BUNGALOW NO A458Plinth100.0%
BUNGALOW NO A458Stilt Floor 0.0%
BUNGALOW NO A458Slabs of Super Structure100.0%
BUNGALOW NO A458Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40.0%
BUNGALOW NO A458Sanitary Fittings within the flats / premises0.0%
BUNGALOW NO A458Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33.0%
BUNGALOW NO A458External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.76.0%
BUNGALOW NO A458Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100018391

Reported deadline extensions

Revised targetReason given by the builder
30 December 2027To, The MahaRERA Authority, Sub : Reason for the Extension to the Project Vaarivana Phase A1 bearing Registration No. P52100018391. Due to certain technical issues, the project could not be commenced within the originally scheduled timeline. At present, all works are being carried out strictly in accordance with the applicable rules and regulations, and the internal construction activities are in full progress. Upon completion of the construction, additional time will be required to obtain the Occupation Certificate from the concerned authority. We sincerely request your kind consideration in processing the pending extension application, and we assure you that we are making every effort to meet the regulatory requirements and complete the project as per the revised timelines. In view of the above, we hereby apply for an extension of the project completion date up to 30/12/2027.

MahaRERA project filing · read 19 July 2026 · registration P52100018391

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹957,908,137₹743,517,898₹652,324,939₹2,353,750,974
Actual raised₹85,017,102₹743,517,898₹1,426,197,738₹2,254,732,738

MahaRERA project filing · read 19 July 2026 · registration P52100018391

Quarterly filing record

34 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 19 July 2026 · registration P52100018391

Documents named in the filing

  • Promoter PAN · 1 listed
  • Commencement certificate · 1 listed
  • Form 1 — Architect's certificate · 3 listed
  • Form 3 — CA certificate · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Title / search report · 8 listed
  • Sanctioned building plan · 2 listed
  • Sanctioned layout plan · 13 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100018391

Builder and past records

What else does the record show?

Projects registered under this company

Sanjivani Integrated Township LLP

10Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 26 September 2026

    8 marked unsold · 276 sold · 0 booked.

    Saved MahaRERA home list

  2. 17 September 2026

    8 marked unsold · 276 sold · 0 booked.

    Saved MahaRERA home list

  3. 8 September 2026

    8 marked unsold · 276 sold · 0 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    8 marked unsold · 276 sold · 0 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100018391 ↗