Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
Sanjivani Integrated Township LLP · P52100018391
For Vaarivana Phase A - 1 (P52100018391), 8 of 284 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Vaarivana Phase A - 1, ₹7,129 per sq ft of carpet area is the median rate across 276 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹7,129/ sq ft carpet area
Across 276 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,673 and ₹8,556.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
284 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| BUNGALOW NO A100 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A101 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A102 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A103 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A104 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A105 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A106 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A107 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A108 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A109 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A110 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A111 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A112 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A113 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A114 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A115 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A116 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A117 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A118 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A119 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A120 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A121 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A122 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A123 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A124 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A125 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A126 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A127 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A128 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A129 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A130 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A131 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A132 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A133 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A134 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A135 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A136 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A137 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A138 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A139 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A140 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A141 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A142 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A143 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A144 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A145 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A146 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A147 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A148 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A149 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A150 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A151 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A152 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A153 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A154 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A155 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A156 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A157 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A158 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A159 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A160 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A161 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A162 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A163 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A164 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A165 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A166 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A167 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A168 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A169 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A170 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A171 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A172 | 1 | 0 | 0 | 1 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A173 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A174 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A175 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A176 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A177 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A178 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A179 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A180 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A181 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A182 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A183 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A184 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A185 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A186 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A187 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A188 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A189 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A190 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A191 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A192 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A193 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A194 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A195 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A196 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A197 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A198 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A199 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A200 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A201 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A202 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A203 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A204 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A205 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A206 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A207 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A208 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A209 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A210 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A211 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A212 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A213 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A214 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A215 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A216 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A217 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A218 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A219 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A220 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A221 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A222 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A223 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A224 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A225 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A226 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A227 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A228 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A229 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A230 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A231 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A232 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A233 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A234 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A235 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A236 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A237 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A238 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A239 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A240 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A241 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A242 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A243 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A244 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A245 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A246 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A247 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A248 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A249 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A250 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A251 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A252 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A253 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A254 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A255 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A256 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A257 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A258 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A259 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A260 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A261 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A358 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A359 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A360 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A361 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A362 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A363 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A364 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A365 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A366 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A367 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A368 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A369 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A370 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A371 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A372 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A373 | 1 | 0 | 0 | 1 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A374 | 1 | 1 | 0 | 0 | 0 | 150.90 sq m≈ 1,624 sq ft |
| BUNGALOW NO A375 | 1 | 1 | 0 | 0 | 0 | 156.50 sq m≈ 1,685 sq ft |
| BUNGALOW NO A376 | 1 | 0 | 0 | 1 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A377 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A378 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A379 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A380 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A381 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A382 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A383 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A384 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A385 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A386 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A387 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A388 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A389 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A390 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A391 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A392 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A393 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A394 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A395 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A396 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A397 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A398 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A399 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A400 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A401 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A402 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A403 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A404 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A405 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A406 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A407 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A408 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A409 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A410 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A411 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A412 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A413 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A414 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A415 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A416 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A417 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A418 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A419 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A420 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A421 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A422 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A423 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A424 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A425 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A426 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A427 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A428 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A429 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A430 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A431 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A432 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A433 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A434 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A435 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A436 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A437 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A438 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A439 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A440 | 1 | 0 | 0 | 1 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A441 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A442 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A443 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A444 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A445 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A446 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A447 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A448 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A449 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A450 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A451 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A452 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A453 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A454 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A455 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A456 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A457 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A458 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A79 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A80 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A81 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A82 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A83 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A84 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A85 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A86 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A87 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A88 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A89 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A90 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A91 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A92 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A93 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A94 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A95 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A96 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A97 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A98 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A99 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 100BUNGALOW NO A100 | 1 | 152.86 sq m≈ 1,645 sq ft | Sold | ₹10,028,167 | |
| 101BUNGALOW NO A101 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹14,811,100 | |
| 102BUNGALOW NO A102 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹12,500,000 | |
| 103BUNGALOW NO A103 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹12,297,770 | |
| 104BUNGALOW NO A104 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹14,500,000 | |
| 105BUNGALOW NO A105 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹18,405,000 | |
| 106BUNGALOW NO A106 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹19,787,456 | |
| 107BUNGALOW NO A107 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹19,142,373 | |
| 108BUNGALOW NO A108 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹12,875,014 | |
| 109BUNGALOW NO A109 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹12,875,014 | |
| 110BUNGALOW NO A110 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹17,740,232 | |
| 111BUNGALOW NO A111 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹14,741,373 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹1,867,959,472 of an estimated ₹2,353,750,974 was reported as incurred (79.4%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100018391
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| BUNGALOW NO A79 | Excavation | 100.0% |
| BUNGALOW NO A79 | Basement (if any) | 100.0% |
| BUNGALOW NO A79 | Podiums (if any) | 0.0% |
| BUNGALOW NO A79 | Plinth | 100.0% |
| BUNGALOW NO A79 | Stilt Floor | 0.0% |
| BUNGALOW NO A79 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A79 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A79 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A79 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A79 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A79 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A80 | Excavation | 100.0% |
| BUNGALOW NO A80 | Basement (if any) | 100.0% |
| BUNGALOW NO A80 | Podiums (if any) | 0.0% |
| BUNGALOW NO A80 | Plinth | 100.0% |
| BUNGALOW NO A80 | Stilt Floor | 0.0% |
| BUNGALOW NO A80 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A80 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A80 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A80 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A80 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A80 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92.0% |
| BUNGALOW NO A81 | Excavation | 100.0% |
| BUNGALOW NO A81 | Basement (if any) | 100.0% |
| BUNGALOW NO A81 | Podiums (if any) | 0.0% |
| BUNGALOW NO A81 | Plinth | 100.0% |
| BUNGALOW NO A81 | Stilt Floor | 0.0% |
| BUNGALOW NO A81 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A81 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A81 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A81 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A81 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A81 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A82 | Excavation | 100.0% |
| BUNGALOW NO A82 | Basement (if any) | 100.0% |
| BUNGALOW NO A82 | Podiums (if any) | 0.0% |
| BUNGALOW NO A82 | Plinth | 100.0% |
| BUNGALOW NO A82 | Stilt Floor | 100.0% |
| BUNGALOW NO A82 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A82 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A82 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A82 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A82 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A82 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A83 | Excavation | 100.0% |
| BUNGALOW NO A83 | Basement (if any) | 100.0% |
| BUNGALOW NO A83 | Podiums (if any) | 0.0% |
| BUNGALOW NO A83 | Plinth | 100.0% |
| BUNGALOW NO A83 | Stilt Floor | 0.0% |
| BUNGALOW NO A83 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A83 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A83 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A83 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A83 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A83 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A84 | Excavation | 100.0% |
| BUNGALOW NO A84 | Basement (if any) | 100.0% |
| BUNGALOW NO A84 | Podiums (if any) | 0.0% |
| BUNGALOW NO A84 | Plinth | 100.0% |
| BUNGALOW NO A84 | Stilt Floor | 0.0% |
| BUNGALOW NO A84 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A84 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A84 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A84 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A84 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A84 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A85 | Excavation | 100.0% |
| BUNGALOW NO A85 | Basement (if any) | 100.0% |
| BUNGALOW NO A85 | Podiums (if any) | 0.0% |
| BUNGALOW NO A85 | Plinth | 100.0% |
| BUNGALOW NO A85 | Stilt Floor | 0.0% |
| BUNGALOW NO A85 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A85 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A85 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A85 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A85 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A85 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95.0% |
| BUNGALOW NO A86 | Excavation | 100.0% |
| BUNGALOW NO A86 | Basement (if any) | 100.0% |
| BUNGALOW NO A86 | Podiums (if any) | 0.0% |
| BUNGALOW NO A86 | Plinth | 100.0% |
| BUNGALOW NO A86 | Stilt Floor | 0.0% |
| BUNGALOW NO A86 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A86 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A86 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A86 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93.0% |
| BUNGALOW NO A86 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A86 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A87 | Excavation | 100.0% |
| BUNGALOW NO A87 | Basement (if any) | 100.0% |
| BUNGALOW NO A87 | Podiums (if any) | 0.0% |
| BUNGALOW NO A87 | Plinth | 100.0% |
| BUNGALOW NO A87 | Stilt Floor | 0.0% |
| BUNGALOW NO A87 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A87 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A87 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A87 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A87 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A87 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A88 | Excavation | 100.0% |
| BUNGALOW NO A88 | Basement (if any) | 100.0% |
| BUNGALOW NO A88 | Podiums (if any) | 0.0% |
| BUNGALOW NO A88 | Plinth | 100.0% |
| BUNGALOW NO A88 | Stilt Floor | 0.0% |
| BUNGALOW NO A88 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A88 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A88 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A88 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 57.0% |
| BUNGALOW NO A88 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33.0% |
| BUNGALOW NO A88 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A89 | Excavation | 100.0% |
| BUNGALOW NO A89 | Basement (if any) | 100.0% |
| BUNGALOW NO A89 | Podiums (if any) | 0.0% |
| BUNGALOW NO A89 | Plinth | 100.0% |
| BUNGALOW NO A89 | Stilt Floor | 0.0% |
| BUNGALOW NO A89 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A89 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A89 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A89 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A89 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A89 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A90 | Excavation | 100.0% |
| BUNGALOW NO A90 | Basement (if any) | 100.0% |
| BUNGALOW NO A90 | Podiums (if any) | 0.0% |
| BUNGALOW NO A90 | Plinth | 100.0% |
| BUNGALOW NO A90 | Stilt Floor | 0.0% |
| BUNGALOW NO A90 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A90 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A90 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A90 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A90 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A90 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 92.0% |
| BUNGALOW NO A91 | Excavation | 100.0% |
| BUNGALOW NO A91 | Basement (if any) | 100.0% |
| BUNGALOW NO A91 | Podiums (if any) | 0.0% |
| BUNGALOW NO A91 | Plinth | 100.0% |
| BUNGALOW NO A91 | Stilt Floor | 0.0% |
| BUNGALOW NO A91 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A91 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A91 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A91 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60.0% |
| BUNGALOW NO A91 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A91 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A92 | Excavation | 100.0% |
| BUNGALOW NO A92 | Basement (if any) | 100.0% |
| BUNGALOW NO A92 | Podiums (if any) | 0.0% |
| BUNGALOW NO A92 | Plinth | 100.0% |
| BUNGALOW NO A92 | Stilt Floor | 0.0% |
| BUNGALOW NO A92 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A92 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A92 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A92 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60.0% |
| BUNGALOW NO A92 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A92 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A93 | Excavation | 100.0% |
| BUNGALOW NO A93 | Basement (if any) | 100.0% |
| BUNGALOW NO A93 | Podiums (if any) | 0.0% |
| BUNGALOW NO A93 | Plinth | 100.0% |
| BUNGALOW NO A93 | Stilt Floor | 0.0% |
| BUNGALOW NO A93 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A93 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A93 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A93 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 57.0% |
| BUNGALOW NO A93 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A93 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A94 | Excavation | 100.0% |
| BUNGALOW NO A94 | Basement (if any) | 100.0% |
| BUNGALOW NO A94 | Podiums (if any) | 0.0% |
| BUNGALOW NO A94 | Plinth | 100.0% |
| BUNGALOW NO A94 | Stilt Floor | 0.0% |
| BUNGALOW NO A94 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A94 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A94 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A94 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 67.0% |
| BUNGALOW NO A94 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A94 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A95 | Excavation | 100.0% |
| BUNGALOW NO A95 | Basement (if any) | 100.0% |
| BUNGALOW NO A95 | Podiums (if any) | 0.0% |
| BUNGALOW NO A95 | Plinth | 100.0% |
| BUNGALOW NO A95 | Stilt Floor | 0.0% |
| BUNGALOW NO A95 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A95 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A95 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A95 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40.0% |
| BUNGALOW NO A95 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50.0% |
| BUNGALOW NO A95 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A96 | Excavation | 100.0% |
| BUNGALOW NO A96 | Basement (if any) | 100.0% |
| BUNGALOW NO A96 | Podiums (if any) | 0.0% |
| BUNGALOW NO A96 | Plinth | 100.0% |
| BUNGALOW NO A96 | Stilt Floor | 0.0% |
| BUNGALOW NO A96 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A96 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 47.0% |
| BUNGALOW NO A96 | Sanitary Fittings within the flats / premises | 44.0% |
| BUNGALOW NO A96 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93.0% |
| BUNGALOW NO A96 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A96 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A97 | Excavation | 100.0% |
| BUNGALOW NO A97 | Basement (if any) | 100.0% |
| BUNGALOW NO A97 | Podiums (if any) | 0.0% |
| BUNGALOW NO A97 | Plinth | 100.0% |
| BUNGALOW NO A97 | Stilt Floor | 0.0% |
| BUNGALOW NO A97 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A97 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A97 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A97 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 57.0% |
| BUNGALOW NO A97 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A97 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A98 | Excavation | 100.0% |
| BUNGALOW NO A98 | Basement (if any) | 100.0% |
| BUNGALOW NO A98 | Podiums (if any) | 0.0% |
| BUNGALOW NO A98 | Plinth | 100.0% |
| BUNGALOW NO A98 | Stilt Floor | 0.0% |
| BUNGALOW NO A98 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A98 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A98 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A98 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50.0% |
| BUNGALOW NO A98 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A98 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A99 | Excavation | 100.0% |
| BUNGALOW NO A99 | Basement (if any) | 100.0% |
| BUNGALOW NO A99 | Podiums (if any) | 0.0% |
| BUNGALOW NO A99 | Plinth | 100.0% |
| BUNGALOW NO A99 | Stilt Floor | 0.0% |
| BUNGALOW NO A99 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A99 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A99 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A99 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 57.0% |
| BUNGALOW NO A99 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A99 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A100 | Excavation | 100.0% |
| BUNGALOW NO A100 | Basement (if any) | 100.0% |
| BUNGALOW NO A100 | Podiums (if any) | 0.0% |
| BUNGALOW NO A100 | Plinth | 100.0% |
| BUNGALOW NO A100 | Stilt Floor | 0.0% |
| BUNGALOW NO A100 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A100 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A100 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A100 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A100 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A100 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95.0% |
| BUNGALOW NO A101 | Excavation | 100.0% |
| BUNGALOW NO A101 | Basement (if any) | 100.0% |
| BUNGALOW NO A101 | Podiums (if any) | 0.0% |
| BUNGALOW NO A101 | Plinth | 100.0% |
| BUNGALOW NO A101 | Stilt Floor | 0.0% |
| BUNGALOW NO A101 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A101 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A101 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A101 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A101 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A101 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A102 | Excavation | 100.0% |
| BUNGALOW NO A102 | Basement (if any) | 100.0% |
| BUNGALOW NO A102 | Podiums (if any) | 0.0% |
| BUNGALOW NO A102 | Plinth | 100.0% |
| BUNGALOW NO A102 | Stilt Floor | 0.0% |
| BUNGALOW NO A102 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A102 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A102 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A102 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A102 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A102 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A103 | Excavation | 100.0% |
| BUNGALOW NO A103 | Basement (if any) | 100.0% |
| BUNGALOW NO A103 | Podiums (if any) | 0.0% |
| BUNGALOW NO A103 | Plinth | 100.0% |
| BUNGALOW NO A103 | Stilt Floor | 0.0% |
| BUNGALOW NO A103 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A103 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68.0% |
| BUNGALOW NO A103 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A103 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 67.0% |
| BUNGALOW NO A103 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A103 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A104 | Excavation | 100.0% |
| BUNGALOW NO A104 | Basement (if any) | 100.0% |
| BUNGALOW NO A104 | Podiums (if any) | 0.0% |
| BUNGALOW NO A104 | Plinth | 100.0% |
| BUNGALOW NO A104 | Stilt Floor | 0.0% |
| BUNGALOW NO A104 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A104 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 46.0% |
| BUNGALOW NO A104 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A104 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 72.0% |
| BUNGALOW NO A104 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A104 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A105 | Excavation | 100.0% |
| BUNGALOW NO A105 | Basement (if any) | 100.0% |
| BUNGALOW NO A105 | Podiums (if any) | 0.0% |
| BUNGALOW NO A105 | Plinth | 100.0% |
| BUNGALOW NO A105 | Stilt Floor | 0.0% |
| BUNGALOW NO A105 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A105 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A105 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A105 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A105 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A105 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A106 | Excavation | 100.0% |
| BUNGALOW NO A106 | Basement (if any) | 100.0% |
| BUNGALOW NO A106 | Podiums (if any) | 0.0% |
| BUNGALOW NO A106 | Plinth | 100.0% |
| BUNGALOW NO A106 | Stilt Floor | 0.0% |
| BUNGALOW NO A106 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A106 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A106 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A106 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A106 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A106 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A107 | Excavation | 100.0% |
| BUNGALOW NO A107 | Basement (if any) | 100.0% |
| BUNGALOW NO A107 | Podiums (if any) | 0.0% |
| BUNGALOW NO A107 | Plinth | 100.0% |
| BUNGALOW NO A107 | Stilt Floor | 0.0% |
| BUNGALOW NO A107 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A107 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68.0% |
| BUNGALOW NO A107 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A107 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A107 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A107 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A108 | Excavation | 100.0% |
| BUNGALOW NO A108 | Basement (if any) | 100.0% |
| BUNGALOW NO A108 | Podiums (if any) | 0.0% |
| BUNGALOW NO A108 | Plinth | 100.0% |
| BUNGALOW NO A108 | Stilt Floor | 0.0% |
| BUNGALOW NO A108 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A108 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A108 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A108 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 67.0% |
| BUNGALOW NO A108 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A108 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A109 | Excavation | 100.0% |
| BUNGALOW NO A109 | Basement (if any) | 100.0% |
| BUNGALOW NO A109 | Podiums (if any) | 0.0% |
| BUNGALOW NO A109 | Plinth | 100.0% |
| BUNGALOW NO A109 | Stilt Floor | 0.0% |
| BUNGALOW NO A109 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A109 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A109 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A109 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70.0% |
| BUNGALOW NO A109 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A109 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A110 | Excavation | 100.0% |
| BUNGALOW NO A110 | Basement (if any) | 100.0% |
| BUNGALOW NO A110 | Podiums (if any) | 0.0% |
| BUNGALOW NO A110 | Plinth | 100.0% |
| BUNGALOW NO A110 | Stilt Floor | 0.0% |
| BUNGALOW NO A110 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A110 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A110 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A110 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A110 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A110 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A111 | Excavation | 100.0% |
| BUNGALOW NO A111 | Basement (if any) | 100.0% |
| BUNGALOW NO A111 | Podiums (if any) | 0.0% |
| BUNGALOW NO A111 | Plinth | 100.0% |
| BUNGALOW NO A111 | Stilt Floor | 0.0% |
| BUNGALOW NO A111 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A111 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A111 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A111 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A111 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A111 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A112 | Excavation | 100.0% |
| BUNGALOW NO A112 | Basement (if any) | 100.0% |
| BUNGALOW NO A112 | Podiums (if any) | 0.0% |
| BUNGALOW NO A112 | Plinth | 100.0% |
| BUNGALOW NO A112 | Stilt Floor | 0.0% |
| BUNGALOW NO A112 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A112 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A112 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A112 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A112 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A112 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A113 | Excavation | 100.0% |
| BUNGALOW NO A113 | Basement (if any) | 100.0% |
| BUNGALOW NO A113 | Podiums (if any) | 0.0% |
| BUNGALOW NO A113 | Plinth | 100.0% |
| BUNGALOW NO A113 | Stilt Floor | 0.0% |
| BUNGALOW NO A113 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A113 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A113 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A113 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A113 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A113 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A114 | Excavation | 100.0% |
| BUNGALOW NO A114 | Basement (if any) | 100.0% |
| BUNGALOW NO A114 | Podiums (if any) | 0.0% |
| BUNGALOW NO A114 | Plinth | 100.0% |
| BUNGALOW NO A114 | Stilt Floor | 0.0% |
| BUNGALOW NO A114 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A114 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A114 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A114 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A114 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A114 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95.0% |
| BUNGALOW NO A115 | Excavation | 100.0% |
| BUNGALOW NO A115 | Basement (if any) | 100.0% |
| BUNGALOW NO A115 | Podiums (if any) | 0.0% |
| BUNGALOW NO A115 | Plinth | 100.0% |
| BUNGALOW NO A115 | Stilt Floor | 0.0% |
| BUNGALOW NO A115 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A115 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A115 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A115 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A115 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A115 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A116 | Excavation | 100.0% |
| BUNGALOW NO A116 | Basement (if any) | 100.0% |
| BUNGALOW NO A116 | Podiums (if any) | 0.0% |
| BUNGALOW NO A116 | Plinth | 100.0% |
| BUNGALOW NO A116 | Stilt Floor | 0.0% |
| BUNGALOW NO A116 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A116 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A116 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A116 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A116 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A116 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A117 | Excavation | 100.0% |
| BUNGALOW NO A117 | Basement (if any) | 100.0% |
| BUNGALOW NO A117 | Podiums (if any) | 0.0% |
| BUNGALOW NO A117 | Plinth | 100.0% |
| BUNGALOW NO A117 | Stilt Floor | 0.0% |
| BUNGALOW NO A117 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A117 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A117 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A117 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A117 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A117 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A118 | Excavation | 100.0% |
| BUNGALOW NO A118 | Basement (if any) | 100.0% |
| BUNGALOW NO A118 | Podiums (if any) | 0.0% |
| BUNGALOW NO A118 | Plinth | 100.0% |
| BUNGALOW NO A118 | Stilt Floor | 0.0% |
| BUNGALOW NO A118 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A118 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A118 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A118 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69.0% |
| BUNGALOW NO A118 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A118 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A119 | Excavation | 100.0% |
| BUNGALOW NO A119 | Basement (if any) | 100.0% |
| BUNGALOW NO A119 | Podiums (if any) | 0.0% |
| BUNGALOW NO A119 | Plinth | 100.0% |
| BUNGALOW NO A119 | Stilt Floor | 0.0% |
| BUNGALOW NO A119 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A119 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A119 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A119 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A119 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A119 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A120 | Excavation | 100.0% |
| BUNGALOW NO A120 | Basement (if any) | 100.0% |
| BUNGALOW NO A120 | Podiums (if any) | 0.0% |
| BUNGALOW NO A120 | Plinth | 100.0% |
| BUNGALOW NO A120 | Stilt Floor | 0.0% |
| BUNGALOW NO A120 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A120 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A120 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A120 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A120 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A120 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A121 | Excavation | 100.0% |
| BUNGALOW NO A121 | Basement (if any) | 100.0% |
| BUNGALOW NO A121 | Podiums (if any) | 0.0% |
| BUNGALOW NO A121 | Plinth | 100.0% |
| BUNGALOW NO A121 | Stilt Floor | 0.0% |
| BUNGALOW NO A121 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A121 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A121 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A121 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A121 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A121 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A122 | Excavation | 100.0% |
| BUNGALOW NO A122 | Basement (if any) | 100.0% |
| BUNGALOW NO A122 | Podiums (if any) | 0.0% |
| BUNGALOW NO A122 | Plinth | 100.0% |
| BUNGALOW NO A122 | Stilt Floor | 0.0% |
| BUNGALOW NO A122 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A122 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A122 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A122 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 57.0% |
| BUNGALOW NO A122 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A122 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A123 | Excavation | 100.0% |
| BUNGALOW NO A123 | Basement (if any) | 100.0% |
| BUNGALOW NO A123 | Podiums (if any) | 0.0% |
| BUNGALOW NO A123 | Plinth | 100.0% |
| BUNGALOW NO A123 | Stilt Floor | 0.0% |
| BUNGALOW NO A123 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A123 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A123 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A123 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A123 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A123 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95.0% |
| BUNGALOW NO A124 | Excavation | 100.0% |
| BUNGALOW NO A124 | Basement (if any) | 100.0% |
| BUNGALOW NO A124 | Podiums (if any) | 0.0% |
| BUNGALOW NO A124 | Plinth | 100.0% |
| BUNGALOW NO A124 | Stilt Floor | 0.0% |
| BUNGALOW NO A124 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A124 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A124 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A124 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A124 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A124 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A125 | Excavation | 100.0% |
| BUNGALOW NO A125 | Basement (if any) | 100.0% |
| BUNGALOW NO A125 | Podiums (if any) | 0.0% |
| BUNGALOW NO A125 | Plinth | 100.0% |
| BUNGALOW NO A125 | Stilt Floor | 0.0% |
| BUNGALOW NO A125 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A125 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A125 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A125 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A125 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A125 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A126 | Excavation | 100.0% |
| BUNGALOW NO A126 | Basement (if any) | 100.0% |
| BUNGALOW NO A126 | Podiums (if any) | 0.0% |
| BUNGALOW NO A126 | Plinth | 100.0% |
| BUNGALOW NO A126 | Stilt Floor | 0.0% |
| BUNGALOW NO A126 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A126 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A126 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A126 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A126 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A126 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A127 | Excavation | 100.0% |
| BUNGALOW NO A127 | Basement (if any) | 100.0% |
| BUNGALOW NO A127 | Podiums (if any) | 0.0% |
| BUNGALOW NO A127 | Plinth | 100.0% |
| BUNGALOW NO A127 | Stilt Floor | 0.0% |
| BUNGALOW NO A127 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A127 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A127 | Sanitary Fittings within the flats / premises | 90.0% |
| BUNGALOW NO A127 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A127 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A127 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A128 | Excavation | 100.0% |
| BUNGALOW NO A128 | Basement (if any) | 100.0% |
| BUNGALOW NO A128 | Podiums (if any) | 0.0% |
| BUNGALOW NO A128 | Plinth | 100.0% |
| BUNGALOW NO A128 | Stilt Floor | 0.0% |
| BUNGALOW NO A128 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A128 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A128 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A128 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A128 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A128 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A129 | Excavation | 100.0% |
| BUNGALOW NO A129 | Basement (if any) | 100.0% |
| BUNGALOW NO A129 | Podiums (if any) | 0.0% |
| BUNGALOW NO A129 | Plinth | 100.0% |
| BUNGALOW NO A129 | Stilt Floor | 0.0% |
| BUNGALOW NO A129 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A129 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A129 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A129 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A129 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A129 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A130 | Excavation | 100.0% |
| BUNGALOW NO A130 | Basement (if any) | 100.0% |
| BUNGALOW NO A130 | Podiums (if any) | 0.0% |
| BUNGALOW NO A130 | Plinth | 100.0% |
| BUNGALOW NO A130 | Stilt Floor | 0.0% |
| BUNGALOW NO A130 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A130 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A130 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A130 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A130 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A130 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A131 | Excavation | 100.0% |
| BUNGALOW NO A131 | Basement (if any) | 100.0% |
| BUNGALOW NO A131 | Podiums (if any) | 0.0% |
| BUNGALOW NO A131 | Plinth | 100.0% |
| BUNGALOW NO A131 | Stilt Floor | 0.0% |
| BUNGALOW NO A131 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A131 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A131 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A131 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A131 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A131 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A132 | Excavation | 100.0% |
| BUNGALOW NO A132 | Basement (if any) | 100.0% |
| BUNGALOW NO A132 | Podiums (if any) | 0.0% |
| BUNGALOW NO A132 | Plinth | 100.0% |
| BUNGALOW NO A132 | Stilt Floor | 0.0% |
| BUNGALOW NO A132 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A132 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A132 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A132 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A132 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A132 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A133 | Excavation | 100.0% |
| BUNGALOW NO A133 | Basement (if any) | 100.0% |
| BUNGALOW NO A133 | Podiums (if any) | 0.0% |
| BUNGALOW NO A133 | Plinth | 100.0% |
| BUNGALOW NO A133 | Stilt Floor | 0.0% |
| BUNGALOW NO A133 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A133 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A133 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A133 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A133 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A133 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A134 | Excavation | 100.0% |
| BUNGALOW NO A134 | Basement (if any) | 100.0% |
| BUNGALOW NO A134 | Podiums (if any) | 0.0% |
| BUNGALOW NO A134 | Plinth | 100.0% |
| BUNGALOW NO A134 | Stilt Floor | 0.0% |
| BUNGALOW NO A134 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A134 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A134 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A134 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A134 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A134 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A135 | Excavation | 100.0% |
| BUNGALOW NO A135 | Basement (if any) | 100.0% |
| BUNGALOW NO A135 | Podiums (if any) | 0.0% |
| BUNGALOW NO A135 | Plinth | 100.0% |
| BUNGALOW NO A135 | Stilt Floor | 0.0% |
| BUNGALOW NO A135 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A135 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A135 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A135 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A135 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A135 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A136 | Excavation | 100.0% |
| BUNGALOW NO A136 | Basement (if any) | 100.0% |
| BUNGALOW NO A136 | Podiums (if any) | 0.0% |
| BUNGALOW NO A136 | Plinth | 100.0% |
| BUNGALOW NO A136 | Stilt Floor | 0.0% |
| BUNGALOW NO A136 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A136 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A136 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A136 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 73.0% |
| BUNGALOW NO A136 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A136 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A137 | Excavation | 100.0% |
| BUNGALOW NO A137 | Basement (if any) | 0.0% |
| BUNGALOW NO A137 | Podiums (if any) | 0.0% |
| BUNGALOW NO A137 | Plinth | 0.0% |
| BUNGALOW NO A137 | Stilt Floor | 0.0% |
| BUNGALOW NO A137 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A137 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A137 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A137 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A137 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A137 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A138 | Excavation | 100.0% |
| BUNGALOW NO A138 | Basement (if any) | 0.0% |
| BUNGALOW NO A138 | Podiums (if any) | 0.0% |
| BUNGALOW NO A138 | Plinth | 0.0% |
| BUNGALOW NO A138 | Stilt Floor | 0.0% |
| BUNGALOW NO A138 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A138 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A138 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A138 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A138 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A138 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A139 | Excavation | 100.0% |
| BUNGALOW NO A139 | Basement (if any) | 100.0% |
| BUNGALOW NO A139 | Podiums (if any) | 0.0% |
| BUNGALOW NO A139 | Plinth | 100.0% |
| BUNGALOW NO A139 | Stilt Floor | 0.0% |
| BUNGALOW NO A139 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A139 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A139 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A139 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A139 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A139 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A140 | Excavation | 100.0% |
| BUNGALOW NO A140 | Basement (if any) | 100.0% |
| BUNGALOW NO A140 | Podiums (if any) | 0.0% |
| BUNGALOW NO A140 | Plinth | 100.0% |
| BUNGALOW NO A140 | Stilt Floor | 0.0% |
| BUNGALOW NO A140 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A140 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A140 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A140 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A140 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A140 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A141 | Excavation | 100.0% |
| BUNGALOW NO A141 | Basement (if any) | 100.0% |
| BUNGALOW NO A141 | Podiums (if any) | 0.0% |
| BUNGALOW NO A141 | Plinth | 100.0% |
| BUNGALOW NO A141 | Stilt Floor | 0.0% |
| BUNGALOW NO A141 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A141 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A141 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A141 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A141 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A141 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A142 | Excavation | 100.0% |
| BUNGALOW NO A142 | Basement (if any) | 100.0% |
| BUNGALOW NO A142 | Podiums (if any) | 0.0% |
| BUNGALOW NO A142 | Plinth | 100.0% |
| BUNGALOW NO A142 | Stilt Floor | 0.0% |
| BUNGALOW NO A142 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A142 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 38.0% |
| BUNGALOW NO A142 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A142 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A142 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 67.0% |
| BUNGALOW NO A142 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A143 | Excavation | 100.0% |
| BUNGALOW NO A143 | Basement (if any) | 100.0% |
| BUNGALOW NO A143 | Podiums (if any) | 0.0% |
| BUNGALOW NO A143 | Plinth | 100.0% |
| BUNGALOW NO A143 | Stilt Floor | 0.0% |
| BUNGALOW NO A143 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A143 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A143 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A143 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A143 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60.0% |
| BUNGALOW NO A143 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A144 | Excavation | 0.0% |
| BUNGALOW NO A144 | Basement (if any) | 0.0% |
| BUNGALOW NO A144 | Podiums (if any) | 0.0% |
| BUNGALOW NO A144 | Plinth | 0.0% |
| BUNGALOW NO A144 | Stilt Floor | 0.0% |
| BUNGALOW NO A144 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A144 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A144 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A144 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A144 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A144 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A145 | Excavation | 100.0% |
| BUNGALOW NO A145 | Basement (if any) | 100.0% |
| BUNGALOW NO A145 | Podiums (if any) | 0.0% |
| BUNGALOW NO A145 | Plinth | 100.0% |
| BUNGALOW NO A145 | Stilt Floor | 0.0% |
| BUNGALOW NO A145 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A145 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A145 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A145 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A145 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A145 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A146 | Excavation | 100.0% |
| BUNGALOW NO A146 | Basement (if any) | 100.0% |
| BUNGALOW NO A146 | Podiums (if any) | 0.0% |
| BUNGALOW NO A146 | Plinth | 0.0% |
| BUNGALOW NO A146 | Stilt Floor | 0.0% |
| BUNGALOW NO A146 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A146 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A146 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A146 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A146 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A146 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A147 | Excavation | 100.0% |
| BUNGALOW NO A147 | Basement (if any) | 0.0% |
| BUNGALOW NO A147 | Podiums (if any) | 0.0% |
| BUNGALOW NO A147 | Plinth | 0.0% |
| BUNGALOW NO A147 | Stilt Floor | 0.0% |
| BUNGALOW NO A147 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A147 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A147 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A147 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A147 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A147 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A148 | Excavation | 0.0% |
| BUNGALOW NO A148 | Basement (if any) | 0.0% |
| BUNGALOW NO A148 | Podiums (if any) | 0.0% |
| BUNGALOW NO A148 | Plinth | 0.0% |
| BUNGALOW NO A148 | Stilt Floor | 0.0% |
| BUNGALOW NO A148 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A148 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A148 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A148 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A148 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A148 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A149 | Excavation | 0.0% |
| BUNGALOW NO A149 | Basement (if any) | 0.0% |
| BUNGALOW NO A149 | Podiums (if any) | 0.0% |
| BUNGALOW NO A149 | Plinth | 0.0% |
| BUNGALOW NO A149 | Stilt Floor | 0.0% |
| BUNGALOW NO A149 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A149 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A149 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A149 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A149 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A149 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A150 | Excavation | 100.0% |
| BUNGALOW NO A150 | Basement (if any) | 100.0% |
| BUNGALOW NO A150 | Podiums (if any) | 0.0% |
| BUNGALOW NO A150 | Plinth | 100.0% |
| BUNGALOW NO A150 | Stilt Floor | 0.0% |
| BUNGALOW NO A150 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A150 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A150 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A150 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A150 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 67.0% |
| BUNGALOW NO A150 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A151 | Excavation | 100.0% |
| BUNGALOW NO A151 | Basement (if any) | 100.0% |
| BUNGALOW NO A151 | Podiums (if any) | 0.0% |
| BUNGALOW NO A151 | Plinth | 100.0% |
| BUNGALOW NO A151 | Stilt Floor | 0.0% |
| BUNGALOW NO A151 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A151 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 27.0% |
| BUNGALOW NO A151 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A151 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A151 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A151 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A152 | Excavation | 100.0% |
| BUNGALOW NO A152 | Basement (if any) | 100.0% |
| BUNGALOW NO A152 | Podiums (if any) | 0.0% |
| BUNGALOW NO A152 | Plinth | 100.0% |
| BUNGALOW NO A152 | Stilt Floor | 0.0% |
| BUNGALOW NO A152 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A152 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A152 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A152 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A152 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A152 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A153 | Excavation | 100.0% |
| BUNGALOW NO A153 | Basement (if any) | 100.0% |
| BUNGALOW NO A153 | Podiums (if any) | 0.0% |
| BUNGALOW NO A153 | Plinth | 100.0% |
| BUNGALOW NO A153 | Stilt Floor | 0.0% |
| BUNGALOW NO A153 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A153 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A153 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A153 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A153 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A153 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A154 | Excavation | 100.0% |
| BUNGALOW NO A154 | Basement (if any) | 100.0% |
| BUNGALOW NO A154 | Podiums (if any) | 0.0% |
| BUNGALOW NO A154 | Plinth | 100.0% |
| BUNGALOW NO A154 | Stilt Floor | 0.0% |
| BUNGALOW NO A154 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A154 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A154 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A154 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A154 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A154 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A155 | Excavation | 100.0% |
| BUNGALOW NO A155 | Basement (if any) | 100.0% |
| BUNGALOW NO A155 | Podiums (if any) | 0.0% |
| BUNGALOW NO A155 | Plinth | 100.0% |
| BUNGALOW NO A155 | Stilt Floor | 0.0% |
| BUNGALOW NO A155 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A155 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A155 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A155 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A155 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A155 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A156 | Excavation | 100.0% |
| BUNGALOW NO A156 | Basement (if any) | 100.0% |
| BUNGALOW NO A156 | Podiums (if any) | 0.0% |
| BUNGALOW NO A156 | Plinth | 100.0% |
| BUNGALOW NO A156 | Stilt Floor | 0.0% |
| BUNGALOW NO A156 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A156 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A156 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A156 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A156 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A156 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A157 | Excavation | 100.0% |
| BUNGALOW NO A157 | Basement (if any) | 100.0% |
| BUNGALOW NO A157 | Podiums (if any) | 0.0% |
| BUNGALOW NO A157 | Plinth | 100.0% |
| BUNGALOW NO A157 | Stilt Floor | 0.0% |
| BUNGALOW NO A157 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A157 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A157 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A157 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A157 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A157 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A158 | Excavation | 100.0% |
| BUNGALOW NO A158 | Basement (if any) | 100.0% |
| BUNGALOW NO A158 | Podiums (if any) | 0.0% |
| BUNGALOW NO A158 | Plinth | 100.0% |
| BUNGALOW NO A158 | Stilt Floor | 0.0% |
| BUNGALOW NO A158 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A158 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A158 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A158 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A158 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A158 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A159 | Excavation | 100.0% |
| BUNGALOW NO A159 | Basement (if any) | 100.0% |
| BUNGALOW NO A159 | Podiums (if any) | 0.0% |
| BUNGALOW NO A159 | Plinth | 100.0% |
| BUNGALOW NO A159 | Stilt Floor | 0.0% |
| BUNGALOW NO A159 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A159 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A159 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A159 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A159 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A159 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A160 | Excavation | 100.0% |
| BUNGALOW NO A160 | Basement (if any) | 100.0% |
| BUNGALOW NO A160 | Podiums (if any) | 0.0% |
| BUNGALOW NO A160 | Plinth | 100.0% |
| BUNGALOW NO A160 | Stilt Floor | 0.0% |
| BUNGALOW NO A160 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A160 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A160 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A160 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A160 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A160 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A161 | Excavation | 100.0% |
| BUNGALOW NO A161 | Basement (if any) | 100.0% |
| BUNGALOW NO A161 | Podiums (if any) | 0.0% |
| BUNGALOW NO A161 | Plinth | 100.0% |
| BUNGALOW NO A161 | Stilt Floor | 0.0% |
| BUNGALOW NO A161 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A161 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A161 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A161 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A161 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A161 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A162 | Excavation | 100.0% |
| BUNGALOW NO A162 | Basement (if any) | 100.0% |
| BUNGALOW NO A162 | Podiums (if any) | 0.0% |
| BUNGALOW NO A162 | Plinth | 100.0% |
| BUNGALOW NO A162 | Stilt Floor | 0.0% |
| BUNGALOW NO A162 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A162 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A162 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A162 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A162 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A162 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A163 | Excavation | 100.0% |
| BUNGALOW NO A163 | Basement (if any) | 100.0% |
| BUNGALOW NO A163 | Podiums (if any) | 0.0% |
| BUNGALOW NO A163 | Plinth | 100.0% |
| BUNGALOW NO A163 | Stilt Floor | 0.0% |
| BUNGALOW NO A163 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A163 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A163 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A163 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A163 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A163 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A164 | Excavation | 100.0% |
| BUNGALOW NO A164 | Basement (if any) | 100.0% |
| BUNGALOW NO A164 | Podiums (if any) | 0.0% |
| BUNGALOW NO A164 | Plinth | 100.0% |
| BUNGALOW NO A164 | Stilt Floor | 0.0% |
| BUNGALOW NO A164 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A164 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A164 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A164 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A164 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A164 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A165 | Excavation | 100.0% |
| BUNGALOW NO A165 | Basement (if any) | 100.0% |
| BUNGALOW NO A165 | Podiums (if any) | 0.0% |
| BUNGALOW NO A165 | Plinth | 100.0% |
| BUNGALOW NO A165 | Stilt Floor | 0.0% |
| BUNGALOW NO A165 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A165 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A165 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A165 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A165 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A165 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A166 | Excavation | 100.0% |
| BUNGALOW NO A166 | Basement (if any) | 100.0% |
| BUNGALOW NO A166 | Podiums (if any) | 0.0% |
| BUNGALOW NO A166 | Plinth | 100.0% |
| BUNGALOW NO A166 | Stilt Floor | 0.0% |
| BUNGALOW NO A166 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A166 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A166 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A166 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69.0% |
| BUNGALOW NO A166 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A166 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A167 | Excavation | 100.0% |
| BUNGALOW NO A167 | Basement (if any) | 100.0% |
| BUNGALOW NO A167 | Podiums (if any) | 0.0% |
| BUNGALOW NO A167 | Plinth | 100.0% |
| BUNGALOW NO A167 | Stilt Floor | 0.0% |
| BUNGALOW NO A167 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A167 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 93.0% |
| BUNGALOW NO A167 | Sanitary Fittings within the flats / premises | 37.0% |
| BUNGALOW NO A167 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 89.0% |
| BUNGALOW NO A167 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A167 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A168 | Excavation | 100.0% |
| BUNGALOW NO A168 | Basement (if any) | 100.0% |
| BUNGALOW NO A168 | Podiums (if any) | 0.0% |
| BUNGALOW NO A168 | Plinth | 100.0% |
| BUNGALOW NO A168 | Stilt Floor | 0.0% |
| BUNGALOW NO A168 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A168 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 23.0% |
| BUNGALOW NO A168 | Sanitary Fittings within the flats / premises | 6.0% |
| BUNGALOW NO A168 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A168 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A168 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A169 | Excavation | 100.0% |
| BUNGALOW NO A169 | Basement (if any) | 100.0% |
| BUNGALOW NO A169 | Podiums (if any) | 0.0% |
| BUNGALOW NO A169 | Plinth | 100.0% |
| BUNGALOW NO A169 | Stilt Floor | 0.0% |
| BUNGALOW NO A169 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A169 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A169 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A169 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A169 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A169 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A170 | Excavation | 100.0% |
| BUNGALOW NO A170 | Basement (if any) | 100.0% |
| BUNGALOW NO A170 | Podiums (if any) | 0.0% |
| BUNGALOW NO A170 | Plinth | 100.0% |
| BUNGALOW NO A170 | Stilt Floor | 0.0% |
| BUNGALOW NO A170 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A170 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A170 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A170 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A170 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A170 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A171 | Excavation | 100.0% |
| BUNGALOW NO A171 | Basement (if any) | 100.0% |
| BUNGALOW NO A171 | Podiums (if any) | 0.0% |
| BUNGALOW NO A171 | Plinth | 100.0% |
| BUNGALOW NO A171 | Stilt Floor | 0.0% |
| BUNGALOW NO A171 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A171 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A171 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A171 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A171 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A171 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A172 | Excavation | 100.0% |
| BUNGALOW NO A172 | Basement (if any) | 100.0% |
| BUNGALOW NO A172 | Podiums (if any) | 0.0% |
| BUNGALOW NO A172 | Plinth | 100.0% |
| BUNGALOW NO A172 | Stilt Floor | 0.0% |
| BUNGALOW NO A172 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A172 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A172 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A172 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A172 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A172 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A173 | Excavation | 100.0% |
| BUNGALOW NO A173 | Basement (if any) | 100.0% |
| BUNGALOW NO A173 | Podiums (if any) | 0.0% |
| BUNGALOW NO A173 | Plinth | 100.0% |
| BUNGALOW NO A173 | Stilt Floor | 0.0% |
| BUNGALOW NO A173 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A173 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A173 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A173 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A173 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A173 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A174 | Excavation | 100.0% |
| BUNGALOW NO A174 | Basement (if any) | 100.0% |
| BUNGALOW NO A174 | Podiums (if any) | 0.0% |
| BUNGALOW NO A174 | Plinth | 100.0% |
| BUNGALOW NO A174 | Stilt Floor | 0.0% |
| BUNGALOW NO A174 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A174 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A174 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A174 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A174 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A174 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A175 | Excavation | 100.0% |
| BUNGALOW NO A175 | Basement (if any) | 100.0% |
| BUNGALOW NO A175 | Podiums (if any) | 0.0% |
| BUNGALOW NO A175 | Plinth | 100.0% |
| BUNGALOW NO A175 | Stilt Floor | 0.0% |
| BUNGALOW NO A175 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A175 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A175 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A175 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A175 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A175 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A176 | Excavation | 100.0% |
| BUNGALOW NO A176 | Basement (if any) | 100.0% |
| BUNGALOW NO A176 | Podiums (if any) | 0.0% |
| BUNGALOW NO A176 | Plinth | 100.0% |
| BUNGALOW NO A176 | Stilt Floor | 0.0% |
| BUNGALOW NO A176 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A176 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A176 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A176 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A176 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A176 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A177 | Excavation | 100.0% |
| BUNGALOW NO A177 | Basement (if any) | 100.0% |
| BUNGALOW NO A177 | Podiums (if any) | 0.0% |
| BUNGALOW NO A177 | Plinth | 100.0% |
| BUNGALOW NO A177 | Stilt Floor | 0.0% |
| BUNGALOW NO A177 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A177 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A177 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A177 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A177 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A177 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A178 | Excavation | 100.0% |
| BUNGALOW NO A178 | Basement (if any) | 100.0% |
| BUNGALOW NO A178 | Podiums (if any) | 0.0% |
| BUNGALOW NO A178 | Plinth | 100.0% |
| BUNGALOW NO A178 | Stilt Floor | 0.0% |
| BUNGALOW NO A178 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A178 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A178 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A178 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A178 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A178 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A179 | Excavation | 100.0% |
| BUNGALOW NO A179 | Basement (if any) | 100.0% |
| BUNGALOW NO A179 | Podiums (if any) | 0.0% |
| BUNGALOW NO A179 | Plinth | 100.0% |
| BUNGALOW NO A179 | Stilt Floor | 0.0% |
| BUNGALOW NO A179 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A179 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A179 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A179 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A179 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A179 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A180 | Excavation | 100.0% |
| BUNGALOW NO A180 | Basement (if any) | 100.0% |
| BUNGALOW NO A180 | Podiums (if any) | 0.0% |
| BUNGALOW NO A180 | Plinth | 100.0% |
| BUNGALOW NO A180 | Stilt Floor | 0.0% |
| BUNGALOW NO A180 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A180 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A180 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A180 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A180 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A180 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A181 | Excavation | 100.0% |
| BUNGALOW NO A181 | Basement (if any) | 100.0% |
| BUNGALOW NO A181 | Podiums (if any) | 0.0% |
| BUNGALOW NO A181 | Plinth | 100.0% |
| BUNGALOW NO A181 | Stilt Floor | 0.0% |
| BUNGALOW NO A181 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A181 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A181 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A181 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A181 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A181 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A182 | Excavation | 100.0% |
| BUNGALOW NO A182 | Basement (if any) | 100.0% |
| BUNGALOW NO A182 | Podiums (if any) | 0.0% |
| BUNGALOW NO A182 | Plinth | 100.0% |
| BUNGALOW NO A182 | Stilt Floor | 0.0% |
| BUNGALOW NO A182 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A182 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A182 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A182 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A182 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A182 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A183 | Excavation | 100.0% |
| BUNGALOW NO A183 | Basement (if any) | 100.0% |
| BUNGALOW NO A183 | Podiums (if any) | 0.0% |
| BUNGALOW NO A183 | Plinth | 100.0% |
| BUNGALOW NO A183 | Stilt Floor | 0.0% |
| BUNGALOW NO A183 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A183 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A183 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A183 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A183 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A183 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A184 | Excavation | 100.0% |
| BUNGALOW NO A184 | Basement (if any) | 100.0% |
| BUNGALOW NO A184 | Podiums (if any) | 0.0% |
| BUNGALOW NO A184 | Plinth | 100.0% |
| BUNGALOW NO A184 | Stilt Floor | 0.0% |
| BUNGALOW NO A184 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A184 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A184 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A184 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A184 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A184 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A185 | Excavation | 100.0% |
| BUNGALOW NO A185 | Basement (if any) | 100.0% |
| BUNGALOW NO A185 | Podiums (if any) | 0.0% |
| BUNGALOW NO A185 | Plinth | 100.0% |
| BUNGALOW NO A185 | Stilt Floor | 0.0% |
| BUNGALOW NO A185 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A185 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A185 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A185 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A185 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A185 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A186 | Excavation | 100.0% |
| BUNGALOW NO A186 | Basement (if any) | 100.0% |
| BUNGALOW NO A186 | Podiums (if any) | 0.0% |
| BUNGALOW NO A186 | Plinth | 100.0% |
| BUNGALOW NO A186 | Stilt Floor | 0.0% |
| BUNGALOW NO A186 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A186 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A186 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A186 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A186 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A186 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A187 | Excavation | 100.0% |
| BUNGALOW NO A187 | Basement (if any) | 100.0% |
| BUNGALOW NO A187 | Podiums (if any) | 0.0% |
| BUNGALOW NO A187 | Plinth | 100.0% |
| BUNGALOW NO A187 | Stilt Floor | 0.0% |
| BUNGALOW NO A187 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A187 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A187 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A187 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A187 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A187 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A188 | Excavation | 100.0% |
| BUNGALOW NO A188 | Basement (if any) | 100.0% |
| BUNGALOW NO A188 | Podiums (if any) | 0.0% |
| BUNGALOW NO A188 | Plinth | 100.0% |
| BUNGALOW NO A188 | Stilt Floor | 0.0% |
| BUNGALOW NO A188 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A188 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A188 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A188 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A188 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A188 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A189 | Excavation | 100.0% |
| BUNGALOW NO A189 | Basement (if any) | 100.0% |
| BUNGALOW NO A189 | Podiums (if any) | 0.0% |
| BUNGALOW NO A189 | Plinth | 100.0% |
| BUNGALOW NO A189 | Stilt Floor | 0.0% |
| BUNGALOW NO A189 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A189 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A189 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A189 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A189 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A189 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A190 | Excavation | 100.0% |
| BUNGALOW NO A190 | Basement (if any) | 100.0% |
| BUNGALOW NO A190 | Podiums (if any) | 0.0% |
| BUNGALOW NO A190 | Plinth | 100.0% |
| BUNGALOW NO A190 | Stilt Floor | 0.0% |
| BUNGALOW NO A190 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A190 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A190 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A190 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A190 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A190 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A191 | Excavation | 100.0% |
| BUNGALOW NO A191 | Basement (if any) | 100.0% |
| BUNGALOW NO A191 | Podiums (if any) | 0.0% |
| BUNGALOW NO A191 | Plinth | 100.0% |
| BUNGALOW NO A191 | Stilt Floor | 0.0% |
| BUNGALOW NO A191 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A191 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A191 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A191 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A191 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A191 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A192 | Excavation | 100.0% |
| BUNGALOW NO A192 | Basement (if any) | 100.0% |
| BUNGALOW NO A192 | Podiums (if any) | 0.0% |
| BUNGALOW NO A192 | Plinth | 100.0% |
| BUNGALOW NO A192 | Stilt Floor | 0.0% |
| BUNGALOW NO A192 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A192 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A192 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A192 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A192 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A192 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A193 | Excavation | 100.0% |
| BUNGALOW NO A193 | Basement (if any) | 100.0% |
| BUNGALOW NO A193 | Podiums (if any) | 0.0% |
| BUNGALOW NO A193 | Plinth | 100.0% |
| BUNGALOW NO A193 | Stilt Floor | 0.0% |
| BUNGALOW NO A193 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A193 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A193 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A193 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A193 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A193 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A194 | Excavation | 100.0% |
| BUNGALOW NO A194 | Basement (if any) | 100.0% |
| BUNGALOW NO A194 | Podiums (if any) | 0.0% |
| BUNGALOW NO A194 | Plinth | 100.0% |
| BUNGALOW NO A194 | Stilt Floor | 0.0% |
| BUNGALOW NO A194 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A194 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A194 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A194 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A194 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A194 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A195 | Excavation | 100.0% |
| BUNGALOW NO A195 | Basement (if any) | 100.0% |
| BUNGALOW NO A195 | Podiums (if any) | 0.0% |
| BUNGALOW NO A195 | Plinth | 100.0% |
| BUNGALOW NO A195 | Stilt Floor | 0.0% |
| BUNGALOW NO A195 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A195 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A195 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A195 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A195 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A195 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A196 | Excavation | 100.0% |
| BUNGALOW NO A196 | Basement (if any) | 100.0% |
| BUNGALOW NO A196 | Podiums (if any) | 0.0% |
| BUNGALOW NO A196 | Plinth | 100.0% |
| BUNGALOW NO A196 | Stilt Floor | 0.0% |
| BUNGALOW NO A196 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A196 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A196 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A196 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A196 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A196 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A197 | Excavation | 100.0% |
| BUNGALOW NO A197 | Basement (if any) | 100.0% |
| BUNGALOW NO A197 | Podiums (if any) | 0.0% |
| BUNGALOW NO A197 | Plinth | 100.0% |
| BUNGALOW NO A197 | Stilt Floor | 0.0% |
| BUNGALOW NO A197 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A197 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A197 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A197 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A197 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A197 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A198 | Excavation | 100.0% |
| BUNGALOW NO A198 | Basement (if any) | 100.0% |
| BUNGALOW NO A198 | Podiums (if any) | 0.0% |
| BUNGALOW NO A198 | Plinth | 100.0% |
| BUNGALOW NO A198 | Stilt Floor | 0.0% |
| BUNGALOW NO A198 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A198 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A198 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A198 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A198 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A198 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A199 | Excavation | 100.0% |
| BUNGALOW NO A199 | Basement (if any) | 100.0% |
| BUNGALOW NO A199 | Podiums (if any) | 0.0% |
| BUNGALOW NO A199 | Plinth | 100.0% |
| BUNGALOW NO A199 | Stilt Floor | 0.0% |
| BUNGALOW NO A199 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A199 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A199 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A199 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A199 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A199 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A200 | Excavation | 100.0% |
| BUNGALOW NO A200 | Basement (if any) | 100.0% |
| BUNGALOW NO A200 | Podiums (if any) | 0.0% |
| BUNGALOW NO A200 | Plinth | 100.0% |
| BUNGALOW NO A200 | Stilt Floor | 0.0% |
| BUNGALOW NO A200 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A200 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A200 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A200 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A200 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A200 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A201 | Excavation | 100.0% |
| BUNGALOW NO A201 | Basement (if any) | 100.0% |
| BUNGALOW NO A201 | Podiums (if any) | 0.0% |
| BUNGALOW NO A201 | Plinth | 100.0% |
| BUNGALOW NO A201 | Stilt Floor | 0.0% |
| BUNGALOW NO A201 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A201 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A201 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A201 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A201 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A201 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A202 | Excavation | 100.0% |
| BUNGALOW NO A202 | Basement (if any) | 100.0% |
| BUNGALOW NO A202 | Podiums (if any) | 0.0% |
| BUNGALOW NO A202 | Plinth | 100.0% |
| BUNGALOW NO A202 | Stilt Floor | 0.0% |
| BUNGALOW NO A202 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A202 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A202 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A202 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A202 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A202 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A203 | Excavation | 100.0% |
| BUNGALOW NO A203 | Basement (if any) | 100.0% |
| BUNGALOW NO A203 | Podiums (if any) | 0.0% |
| BUNGALOW NO A203 | Plinth | 100.0% |
| BUNGALOW NO A203 | Stilt Floor | 0.0% |
| BUNGALOW NO A203 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A203 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A203 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A203 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A203 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A203 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A204 | Excavation | 100.0% |
| BUNGALOW NO A204 | Basement (if any) | 100.0% |
| BUNGALOW NO A204 | Podiums (if any) | 0.0% |
| BUNGALOW NO A204 | Plinth | 100.0% |
| BUNGALOW NO A204 | Stilt Floor | 0.0% |
| BUNGALOW NO A204 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A204 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A204 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A204 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A204 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A204 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A205 | Excavation | 100.0% |
| BUNGALOW NO A205 | Basement (if any) | 100.0% |
| BUNGALOW NO A205 | Podiums (if any) | 0.0% |
| BUNGALOW NO A205 | Plinth | 100.0% |
| BUNGALOW NO A205 | Stilt Floor | 0.0% |
| BUNGALOW NO A205 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A205 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A205 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A205 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A205 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A205 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A206 | Excavation | 100.0% |
| BUNGALOW NO A206 | Basement (if any) | 100.0% |
| BUNGALOW NO A206 | Podiums (if any) | 0.0% |
| BUNGALOW NO A206 | Plinth | 100.0% |
| BUNGALOW NO A206 | Stilt Floor | 0.0% |
| BUNGALOW NO A206 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A206 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A206 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A206 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A206 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A206 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A207 | Excavation | 100.0% |
| BUNGALOW NO A207 | Basement (if any) | 100.0% |
| BUNGALOW NO A207 | Podiums (if any) | 0.0% |
| BUNGALOW NO A207 | Plinth | 100.0% |
| BUNGALOW NO A207 | Stilt Floor | 0.0% |
| BUNGALOW NO A207 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A207 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 52.0% |
| BUNGALOW NO A207 | Sanitary Fittings within the flats / premises | 40.0% |
| BUNGALOW NO A207 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69.0% |
| BUNGALOW NO A207 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A207 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A208 | Excavation | 100.0% |
| BUNGALOW NO A208 | Basement (if any) | 100.0% |
| BUNGALOW NO A208 | Podiums (if any) | 0.0% |
| BUNGALOW NO A208 | Plinth | 100.0% |
| BUNGALOW NO A208 | Stilt Floor | 0.0% |
| BUNGALOW NO A208 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A208 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A208 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A208 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A208 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A208 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A209 | Excavation | 100.0% |
| BUNGALOW NO A209 | Basement (if any) | 100.0% |
| BUNGALOW NO A209 | Podiums (if any) | 0.0% |
| BUNGALOW NO A209 | Plinth | 100.0% |
| BUNGALOW NO A209 | Stilt Floor | 0.0% |
| BUNGALOW NO A209 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A209 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 48.0% |
| BUNGALOW NO A209 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A209 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A209 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A209 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A210 | Excavation | 100.0% |
| BUNGALOW NO A210 | Basement (if any) | 100.0% |
| BUNGALOW NO A210 | Podiums (if any) | 0.0% |
| BUNGALOW NO A210 | Plinth | 100.0% |
| BUNGALOW NO A210 | Stilt Floor | 0.0% |
| BUNGALOW NO A210 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A210 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A210 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A210 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A210 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A210 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A211 | Excavation | 100.0% |
| BUNGALOW NO A211 | Basement (if any) | 100.0% |
| BUNGALOW NO A211 | Podiums (if any) | 0.0% |
| BUNGALOW NO A211 | Plinth | 100.0% |
| BUNGALOW NO A211 | Stilt Floor | 0.0% |
| BUNGALOW NO A211 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A211 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A211 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A211 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A211 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A211 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A212 | Excavation | 100.0% |
| BUNGALOW NO A212 | Basement (if any) | 100.0% |
| BUNGALOW NO A212 | Podiums (if any) | 0.0% |
| BUNGALOW NO A212 | Plinth | 100.0% |
| BUNGALOW NO A212 | Stilt Floor | 0.0% |
| BUNGALOW NO A212 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A212 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A212 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A212 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A212 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A212 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A213 | Excavation | 100.0% |
| BUNGALOW NO A213 | Basement (if any) | 100.0% |
| BUNGALOW NO A213 | Podiums (if any) | 0.0% |
| BUNGALOW NO A213 | Plinth | 100.0% |
| BUNGALOW NO A213 | Stilt Floor | 0.0% |
| BUNGALOW NO A213 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A213 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 43.0% |
| BUNGALOW NO A213 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A213 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 36.0% |
| BUNGALOW NO A213 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A213 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A214 | Excavation | 100.0% |
| BUNGALOW NO A214 | Basement (if any) | 100.0% |
| BUNGALOW NO A214 | Podiums (if any) | 0.0% |
| BUNGALOW NO A214 | Plinth | 100.0% |
| BUNGALOW NO A214 | Stilt Floor | 0.0% |
| BUNGALOW NO A214 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A214 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A214 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A214 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A214 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A214 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A215 | Excavation | 100.0% |
| BUNGALOW NO A215 | Basement (if any) | 100.0% |
| BUNGALOW NO A215 | Podiums (if any) | 0.0% |
| BUNGALOW NO A215 | Plinth | 100.0% |
| BUNGALOW NO A215 | Stilt Floor | 0.0% |
| BUNGALOW NO A215 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A215 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 47.0% |
| BUNGALOW NO A215 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A215 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60.0% |
| BUNGALOW NO A215 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 67.0% |
| BUNGALOW NO A215 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A216 | Excavation | 100.0% |
| BUNGALOW NO A216 | Basement (if any) | 100.0% |
| BUNGALOW NO A216 | Podiums (if any) | 0.0% |
| BUNGALOW NO A216 | Plinth | 100.0% |
| BUNGALOW NO A216 | Stilt Floor | 0.0% |
| BUNGALOW NO A216 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A216 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A216 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A216 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A216 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A216 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A217 | Excavation | 100.0% |
| BUNGALOW NO A217 | Basement (if any) | 100.0% |
| BUNGALOW NO A217 | Podiums (if any) | 0.0% |
| BUNGALOW NO A217 | Plinth | 100.0% |
| BUNGALOW NO A217 | Stilt Floor | 0.0% |
| BUNGALOW NO A217 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A217 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A217 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A217 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A217 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A217 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A218 | Excavation | 100.0% |
| BUNGALOW NO A218 | Basement (if any) | 100.0% |
| BUNGALOW NO A218 | Podiums (if any) | 0.0% |
| BUNGALOW NO A218 | Plinth | 100.0% |
| BUNGALOW NO A218 | Stilt Floor | 0.0% |
| BUNGALOW NO A218 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A218 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A218 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A218 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A218 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A218 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A219 | Excavation | 100.0% |
| BUNGALOW NO A219 | Basement (if any) | 100.0% |
| BUNGALOW NO A219 | Podiums (if any) | 0.0% |
| BUNGALOW NO A219 | Plinth | 100.0% |
| BUNGALOW NO A219 | Stilt Floor | 0.0% |
| BUNGALOW NO A219 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A219 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A219 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A219 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A219 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A219 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A220 | Excavation | 100.0% |
| BUNGALOW NO A220 | Basement (if any) | 100.0% |
| BUNGALOW NO A220 | Podiums (if any) | 0.0% |
| BUNGALOW NO A220 | Plinth | 100.0% |
| BUNGALOW NO A220 | Stilt Floor | 0.0% |
| BUNGALOW NO A220 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A220 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A220 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A220 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A220 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A220 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A221 | Excavation | 100.0% |
| BUNGALOW NO A221 | Basement (if any) | 100.0% |
| BUNGALOW NO A221 | Podiums (if any) | 0.0% |
| BUNGALOW NO A221 | Plinth | 100.0% |
| BUNGALOW NO A221 | Stilt Floor | 0.0% |
| BUNGALOW NO A221 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A221 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A221 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A221 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A221 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A221 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A222 | Excavation | 100.0% |
| BUNGALOW NO A222 | Basement (if any) | 100.0% |
| BUNGALOW NO A222 | Podiums (if any) | 0.0% |
| BUNGALOW NO A222 | Plinth | 100.0% |
| BUNGALOW NO A222 | Stilt Floor | 0.0% |
| BUNGALOW NO A222 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A222 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A222 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A222 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A222 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A222 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A223 | Excavation | 100.0% |
| BUNGALOW NO A223 | Basement (if any) | 100.0% |
| BUNGALOW NO A223 | Podiums (if any) | 0.0% |
| BUNGALOW NO A223 | Plinth | 100.0% |
| BUNGALOW NO A223 | Stilt Floor | 0.0% |
| BUNGALOW NO A223 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A223 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 53.0% |
| BUNGALOW NO A223 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A223 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A223 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A223 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A224 | Excavation | 100.0% |
| BUNGALOW NO A224 | Basement (if any) | 100.0% |
| BUNGALOW NO A224 | Podiums (if any) | 0.0% |
| BUNGALOW NO A224 | Plinth | 100.0% |
| BUNGALOW NO A224 | Stilt Floor | 0.0% |
| BUNGALOW NO A224 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A224 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A224 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A224 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A224 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A224 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A225 | Excavation | 100.0% |
| BUNGALOW NO A225 | Basement (if any) | 100.0% |
| BUNGALOW NO A225 | Podiums (if any) | 0.0% |
| BUNGALOW NO A225 | Plinth | 100.0% |
| BUNGALOW NO A225 | Stilt Floor | 0.0% |
| BUNGALOW NO A225 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A225 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A225 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A225 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A225 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A225 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A226 | Excavation | 100.0% |
| BUNGALOW NO A226 | Basement (if any) | 100.0% |
| BUNGALOW NO A226 | Podiums (if any) | 0.0% |
| BUNGALOW NO A226 | Plinth | 100.0% |
| BUNGALOW NO A226 | Stilt Floor | 0.0% |
| BUNGALOW NO A226 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A226 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A226 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A226 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A226 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A226 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A227 | Excavation | 100.0% |
| BUNGALOW NO A227 | Basement (if any) | 100.0% |
| BUNGALOW NO A227 | Podiums (if any) | 0.0% |
| BUNGALOW NO A227 | Plinth | 100.0% |
| BUNGALOW NO A227 | Stilt Floor | 0.0% |
| BUNGALOW NO A227 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A227 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A227 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A227 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69.0% |
| BUNGALOW NO A227 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A227 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A228 | Excavation | 100.0% |
| BUNGALOW NO A228 | Basement (if any) | 100.0% |
| BUNGALOW NO A228 | Podiums (if any) | 0.0% |
| BUNGALOW NO A228 | Plinth | 100.0% |
| BUNGALOW NO A228 | Stilt Floor | 0.0% |
| BUNGALOW NO A228 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A228 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A228 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A228 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A228 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A228 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A229 | Excavation | 100.0% |
| BUNGALOW NO A229 | Basement (if any) | 100.0% |
| BUNGALOW NO A229 | Podiums (if any) | 0.0% |
| BUNGALOW NO A229 | Plinth | 100.0% |
| BUNGALOW NO A229 | Stilt Floor | 0.0% |
| BUNGALOW NO A229 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A229 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A229 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A229 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A229 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A229 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A230 | Excavation | 100.0% |
| BUNGALOW NO A230 | Basement (if any) | 100.0% |
| BUNGALOW NO A230 | Podiums (if any) | 0.0% |
| BUNGALOW NO A230 | Plinth | 100.0% |
| BUNGALOW NO A230 | Stilt Floor | 0.0% |
| BUNGALOW NO A230 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A230 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A230 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A230 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A230 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A230 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A231 | Excavation | 100.0% |
| BUNGALOW NO A231 | Basement (if any) | 100.0% |
| BUNGALOW NO A231 | Podiums (if any) | 0.0% |
| BUNGALOW NO A231 | Plinth | 100.0% |
| BUNGALOW NO A231 | Stilt Floor | 0.0% |
| BUNGALOW NO A231 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A231 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A231 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A231 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A231 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A231 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A232 | Excavation | 100.0% |
| BUNGALOW NO A232 | Basement (if any) | 100.0% |
| BUNGALOW NO A232 | Podiums (if any) | 0.0% |
| BUNGALOW NO A232 | Plinth | 100.0% |
| BUNGALOW NO A232 | Stilt Floor | 0.0% |
| BUNGALOW NO A232 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A232 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A232 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A232 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A232 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A232 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A233 | Excavation | 100.0% |
| BUNGALOW NO A233 | Basement (if any) | 100.0% |
| BUNGALOW NO A233 | Podiums (if any) | 0.0% |
| BUNGALOW NO A233 | Plinth | 100.0% |
| BUNGALOW NO A233 | Stilt Floor | 0.0% |
| BUNGALOW NO A233 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A233 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A233 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A233 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A233 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A233 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A234 | Excavation | 100.0% |
| BUNGALOW NO A234 | Basement (if any) | 100.0% |
| BUNGALOW NO A234 | Podiums (if any) | 0.0% |
| BUNGALOW NO A234 | Plinth | 100.0% |
| BUNGALOW NO A234 | Stilt Floor | 0.0% |
| BUNGALOW NO A234 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A234 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A234 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A234 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A234 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A234 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A235 | Excavation | 100.0% |
| BUNGALOW NO A235 | Basement (if any) | 100.0% |
| BUNGALOW NO A235 | Podiums (if any) | 0.0% |
| BUNGALOW NO A235 | Plinth | 100.0% |
| BUNGALOW NO A235 | Stilt Floor | 0.0% |
| BUNGALOW NO A235 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A235 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A235 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A235 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A235 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A235 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A236 | Excavation | 100.0% |
| BUNGALOW NO A236 | Basement (if any) | 100.0% |
| BUNGALOW NO A236 | Podiums (if any) | 0.0% |
| BUNGALOW NO A236 | Plinth | 100.0% |
| BUNGALOW NO A236 | Stilt Floor | 0.0% |
| BUNGALOW NO A236 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A236 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A236 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A236 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A236 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A236 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A237 | Excavation | 100.0% |
| BUNGALOW NO A237 | Basement (if any) | 100.0% |
| BUNGALOW NO A237 | Podiums (if any) | 0.0% |
| BUNGALOW NO A237 | Plinth | 100.0% |
| BUNGALOW NO A237 | Stilt Floor | 0.0% |
| BUNGALOW NO A237 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A237 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A237 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A237 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A237 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A237 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A238 | Excavation | 100.0% |
| BUNGALOW NO A238 | Basement (if any) | 100.0% |
| BUNGALOW NO A238 | Podiums (if any) | 0.0% |
| BUNGALOW NO A238 | Plinth | 100.0% |
| BUNGALOW NO A238 | Stilt Floor | 0.0% |
| BUNGALOW NO A238 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A238 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A238 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A238 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A238 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A238 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A239 | Excavation | 100.0% |
| BUNGALOW NO A239 | Basement (if any) | 100.0% |
| BUNGALOW NO A239 | Podiums (if any) | 0.0% |
| BUNGALOW NO A239 | Plinth | 100.0% |
| BUNGALOW NO A239 | Stilt Floor | 0.0% |
| BUNGALOW NO A239 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A239 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A239 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A239 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A239 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A239 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A240 | Excavation | 100.0% |
| BUNGALOW NO A240 | Basement (if any) | 100.0% |
| BUNGALOW NO A240 | Podiums (if any) | 0.0% |
| BUNGALOW NO A240 | Plinth | 100.0% |
| BUNGALOW NO A240 | Stilt Floor | 0.0% |
| BUNGALOW NO A240 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A240 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A240 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A240 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A240 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A240 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A241 | Excavation | 100.0% |
| BUNGALOW NO A241 | Basement (if any) | 100.0% |
| BUNGALOW NO A241 | Podiums (if any) | 0.0% |
| BUNGALOW NO A241 | Plinth | 100.0% |
| BUNGALOW NO A241 | Stilt Floor | 0.0% |
| BUNGALOW NO A241 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A241 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A241 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A241 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A241 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A241 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A242 | Excavation | 100.0% |
| BUNGALOW NO A242 | Basement (if any) | 100.0% |
| BUNGALOW NO A242 | Podiums (if any) | 0.0% |
| BUNGALOW NO A242 | Plinth | 100.0% |
| BUNGALOW NO A242 | Stilt Floor | 0.0% |
| BUNGALOW NO A242 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A242 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A242 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A242 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A242 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A242 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A243 | Excavation | 100.0% |
| BUNGALOW NO A243 | Basement (if any) | 100.0% |
| BUNGALOW NO A243 | Podiums (if any) | 0.0% |
| BUNGALOW NO A243 | Plinth | 100.0% |
| BUNGALOW NO A243 | Stilt Floor | 0.0% |
| BUNGALOW NO A243 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A243 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A243 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A243 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A243 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A243 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A244 | Excavation | 100.0% |
| BUNGALOW NO A244 | Basement (if any) | 100.0% |
| BUNGALOW NO A244 | Podiums (if any) | 0.0% |
| BUNGALOW NO A244 | Plinth | 100.0% |
| BUNGALOW NO A244 | Stilt Floor | 0.0% |
| BUNGALOW NO A244 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A244 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A244 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A244 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A244 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A244 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A245 | Excavation | 100.0% |
| BUNGALOW NO A245 | Basement (if any) | 100.0% |
| BUNGALOW NO A245 | Podiums (if any) | 0.0% |
| BUNGALOW NO A245 | Plinth | 100.0% |
| BUNGALOW NO A245 | Stilt Floor | 0.0% |
| BUNGALOW NO A245 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A245 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A245 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A245 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A245 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A245 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A246 | Excavation | 100.0% |
| BUNGALOW NO A246 | Basement (if any) | 100.0% |
| BUNGALOW NO A246 | Podiums (if any) | 0.0% |
| BUNGALOW NO A246 | Plinth | 100.0% |
| BUNGALOW NO A246 | Stilt Floor | 0.0% |
| BUNGALOW NO A246 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A246 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A246 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A246 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A246 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A246 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A247 | Excavation | 100.0% |
| BUNGALOW NO A247 | Basement (if any) | 100.0% |
| BUNGALOW NO A247 | Podiums (if any) | 0.0% |
| BUNGALOW NO A247 | Plinth | 100.0% |
| BUNGALOW NO A247 | Stilt Floor | 0.0% |
| BUNGALOW NO A247 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A247 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A247 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A247 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A247 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A247 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A248 | Excavation | 100.0% |
| BUNGALOW NO A248 | Basement (if any) | 100.0% |
| BUNGALOW NO A248 | Podiums (if any) | 0.0% |
| BUNGALOW NO A248 | Plinth | 100.0% |
| BUNGALOW NO A248 | Stilt Floor | 0.0% |
| BUNGALOW NO A248 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A248 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A248 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A248 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A248 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A248 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A249 | Excavation | 100.0% |
| BUNGALOW NO A249 | Basement (if any) | 100.0% |
| BUNGALOW NO A249 | Podiums (if any) | 0.0% |
| BUNGALOW NO A249 | Plinth | 100.0% |
| BUNGALOW NO A249 | Stilt Floor | 0.0% |
| BUNGALOW NO A249 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A249 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A249 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A249 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A249 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A249 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A250 | Excavation | 100.0% |
| BUNGALOW NO A250 | Basement (if any) | 100.0% |
| BUNGALOW NO A250 | Podiums (if any) | 0.0% |
| BUNGALOW NO A250 | Plinth | 100.0% |
| BUNGALOW NO A250 | Stilt Floor | 0.0% |
| BUNGALOW NO A250 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A250 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A250 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A250 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A250 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A250 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A251 | Excavation | 100.0% |
| BUNGALOW NO A251 | Basement (if any) | 100.0% |
| BUNGALOW NO A251 | Podiums (if any) | 0.0% |
| BUNGALOW NO A251 | Plinth | 100.0% |
| BUNGALOW NO A251 | Stilt Floor | 0.0% |
| BUNGALOW NO A251 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A251 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A251 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A251 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69.0% |
| BUNGALOW NO A251 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A251 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A252 | Excavation | 100.0% |
| BUNGALOW NO A252 | Basement (if any) | 100.0% |
| BUNGALOW NO A252 | Podiums (if any) | 0.0% |
| BUNGALOW NO A252 | Plinth | 100.0% |
| BUNGALOW NO A252 | Stilt Floor | 0.0% |
| BUNGALOW NO A252 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A252 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A252 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A252 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A252 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A252 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A253 | Excavation | 100.0% |
| BUNGALOW NO A253 | Basement (if any) | 100.0% |
| BUNGALOW NO A253 | Podiums (if any) | 0.0% |
| BUNGALOW NO A253 | Plinth | 100.0% |
| BUNGALOW NO A253 | Stilt Floor | 0.0% |
| BUNGALOW NO A253 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A253 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 71.0% |
| BUNGALOW NO A253 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A253 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85.0% |
| BUNGALOW NO A253 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A253 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A254 | Excavation | 100.0% |
| BUNGALOW NO A254 | Basement (if any) | 100.0% |
| BUNGALOW NO A254 | Podiums (if any) | 0.0% |
| BUNGALOW NO A254 | Plinth | 100.0% |
| BUNGALOW NO A254 | Stilt Floor | 0.0% |
| BUNGALOW NO A254 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A254 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A254 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A254 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 69.0% |
| BUNGALOW NO A254 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A254 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A255 | Excavation | 100.0% |
| BUNGALOW NO A255 | Basement (if any) | 100.0% |
| BUNGALOW NO A255 | Podiums (if any) | 0.0% |
| BUNGALOW NO A255 | Plinth | 100.0% |
| BUNGALOW NO A255 | Stilt Floor | 0.0% |
| BUNGALOW NO A255 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A255 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A255 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A255 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A255 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A255 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A256 | Excavation | 100.0% |
| BUNGALOW NO A256 | Basement (if any) | 100.0% |
| BUNGALOW NO A256 | Podiums (if any) | 0.0% |
| BUNGALOW NO A256 | Plinth | 100.0% |
| BUNGALOW NO A256 | Stilt Floor | 0.0% |
| BUNGALOW NO A256 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A256 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A256 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A256 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A256 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A256 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A257 | Excavation | 100.0% |
| BUNGALOW NO A257 | Basement (if any) | 100.0% |
| BUNGALOW NO A257 | Podiums (if any) | 0.0% |
| BUNGALOW NO A257 | Plinth | 100.0% |
| BUNGALOW NO A257 | Stilt Floor | 0.0% |
| BUNGALOW NO A257 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A257 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A257 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A257 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A257 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A257 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A258 | Excavation | 100.0% |
| BUNGALOW NO A258 | Basement (if any) | 100.0% |
| BUNGALOW NO A258 | Podiums (if any) | 0.0% |
| BUNGALOW NO A258 | Plinth | 100.0% |
| BUNGALOW NO A258 | Stilt Floor | 0.0% |
| BUNGALOW NO A258 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A258 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A258 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A258 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A258 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A258 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A259 | Excavation | 100.0% |
| BUNGALOW NO A259 | Basement (if any) | 100.0% |
| BUNGALOW NO A259 | Podiums (if any) | 0.0% |
| BUNGALOW NO A259 | Plinth | 100.0% |
| BUNGALOW NO A259 | Stilt Floor | 0.0% |
| BUNGALOW NO A259 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A259 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A259 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A259 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A259 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A259 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A260 | Excavation | 100.0% |
| BUNGALOW NO A260 | Basement (if any) | 100.0% |
| BUNGALOW NO A260 | Podiums (if any) | 0.0% |
| BUNGALOW NO A260 | Plinth | 100.0% |
| BUNGALOW NO A260 | Stilt Floor | 0.0% |
| BUNGALOW NO A260 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A260 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A260 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A260 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A260 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A260 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A261 | Excavation | 100.0% |
| BUNGALOW NO A261 | Basement (if any) | 100.0% |
| BUNGALOW NO A261 | Podiums (if any) | 0.0% |
| BUNGALOW NO A261 | Plinth | 100.0% |
| BUNGALOW NO A261 | Stilt Floor | 0.0% |
| BUNGALOW NO A261 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A261 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A261 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A261 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A261 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A261 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A358 | Excavation | 100.0% |
| BUNGALOW NO A358 | Basement (if any) | 100.0% |
| BUNGALOW NO A358 | Podiums (if any) | 0.0% |
| BUNGALOW NO A358 | Plinth | 100.0% |
| BUNGALOW NO A358 | Stilt Floor | 0.0% |
| BUNGALOW NO A358 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A358 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A358 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A358 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A358 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A358 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A359 | Excavation | 100.0% |
| BUNGALOW NO A359 | Basement (if any) | 100.0% |
| BUNGALOW NO A359 | Podiums (if any) | 0.0% |
| BUNGALOW NO A359 | Plinth | 100.0% |
| BUNGALOW NO A359 | Stilt Floor | 0.0% |
| BUNGALOW NO A359 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A359 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A359 | Sanitary Fittings within the flats / premises | 10.0% |
| BUNGALOW NO A359 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A359 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 83.0% |
| BUNGALOW NO A359 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A360 | Excavation | 100.0% |
| BUNGALOW NO A360 | Basement (if any) | 100.0% |
| BUNGALOW NO A360 | Podiums (if any) | 0.0% |
| BUNGALOW NO A360 | Plinth | 100.0% |
| BUNGALOW NO A360 | Stilt Floor | 0.0% |
| BUNGALOW NO A360 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A360 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A360 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A360 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A360 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A360 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A361 | Excavation | 100.0% |
| BUNGALOW NO A361 | Basement (if any) | 100.0% |
| BUNGALOW NO A361 | Podiums (if any) | 0.0% |
| BUNGALOW NO A361 | Plinth | 100.0% |
| BUNGALOW NO A361 | Stilt Floor | 0.0% |
| BUNGALOW NO A361 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A361 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A361 | Sanitary Fittings within the flats / premises | 10.0% |
| BUNGALOW NO A361 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A361 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A361 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A362 | Excavation | 100.0% |
| BUNGALOW NO A362 | Basement (if any) | 100.0% |
| BUNGALOW NO A362 | Podiums (if any) | 0.0% |
| BUNGALOW NO A362 | Plinth | 100.0% |
| BUNGALOW NO A362 | Stilt Floor | 0.0% |
| BUNGALOW NO A362 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A362 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A362 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A362 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40.0% |
| BUNGALOW NO A362 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A362 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A363 | Excavation | 100.0% |
| BUNGALOW NO A363 | Basement (if any) | 100.0% |
| BUNGALOW NO A363 | Podiums (if any) | 0.0% |
| BUNGALOW NO A363 | Plinth | 100.0% |
| BUNGALOW NO A363 | Stilt Floor | 0.0% |
| BUNGALOW NO A363 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A363 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 52.0% |
| BUNGALOW NO A363 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A363 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70.0% |
| BUNGALOW NO A363 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A363 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A364 | Excavation | 100.0% |
| BUNGALOW NO A364 | Basement (if any) | 100.0% |
| BUNGALOW NO A364 | Podiums (if any) | 0.0% |
| BUNGALOW NO A364 | Plinth | 100.0% |
| BUNGALOW NO A364 | Stilt Floor | 0.0% |
| BUNGALOW NO A364 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A364 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A364 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A364 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A364 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A364 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A365 | Excavation | 100.0% |
| BUNGALOW NO A365 | Basement (if any) | 100.0% |
| BUNGALOW NO A365 | Podiums (if any) | 0.0% |
| BUNGALOW NO A365 | Plinth | 100.0% |
| BUNGALOW NO A365 | Stilt Floor | 0.0% |
| BUNGALOW NO A365 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A365 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A365 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A365 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A365 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A365 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A366 | Excavation | 100.0% |
| BUNGALOW NO A366 | Basement (if any) | 100.0% |
| BUNGALOW NO A366 | Podiums (if any) | 0.0% |
| BUNGALOW NO A366 | Plinth | 100.0% |
| BUNGALOW NO A366 | Stilt Floor | 0.0% |
| BUNGALOW NO A366 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A366 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A366 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A366 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A366 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A366 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A367 | Excavation | 100.0% |
| BUNGALOW NO A367 | Basement (if any) | 100.0% |
| BUNGALOW NO A367 | Podiums (if any) | 0.0% |
| BUNGALOW NO A367 | Plinth | 100.0% |
| BUNGALOW NO A367 | Stilt Floor | 0.0% |
| BUNGALOW NO A367 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A367 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A367 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A367 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A367 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A367 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A368 | Excavation | 100.0% |
| BUNGALOW NO A368 | Basement (if any) | 100.0% |
| BUNGALOW NO A368 | Podiums (if any) | 0.0% |
| BUNGALOW NO A368 | Plinth | 100.0% |
| BUNGALOW NO A368 | Stilt Floor | 0.0% |
| BUNGALOW NO A368 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A368 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A368 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A368 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 81.0% |
| BUNGALOW NO A368 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A368 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 25.0% |
| BUNGALOW NO A369 | Excavation | 100.0% |
| BUNGALOW NO A369 | Basement (if any) | 100.0% |
| BUNGALOW NO A369 | Podiums (if any) | 0.0% |
| BUNGALOW NO A369 | Plinth | 100.0% |
| BUNGALOW NO A369 | Stilt Floor | 0.0% |
| BUNGALOW NO A369 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A369 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A369 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A369 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A369 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A369 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A370 | Excavation | 100.0% |
| BUNGALOW NO A370 | Basement (if any) | 100.0% |
| BUNGALOW NO A370 | Podiums (if any) | 0.0% |
| BUNGALOW NO A370 | Plinth | 100.0% |
| BUNGALOW NO A370 | Stilt Floor | 0.0% |
| BUNGALOW NO A370 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A370 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A370 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A370 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A370 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A370 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A371 | Excavation | 100.0% |
| BUNGALOW NO A371 | Basement (if any) | 100.0% |
| BUNGALOW NO A371 | Podiums (if any) | 0.0% |
| BUNGALOW NO A371 | Plinth | 100.0% |
| BUNGALOW NO A371 | Stilt Floor | 0.0% |
| BUNGALOW NO A371 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A371 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A371 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A371 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A371 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A371 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A372 | Excavation | 100.0% |
| BUNGALOW NO A372 | Basement (if any) | 100.0% |
| BUNGALOW NO A372 | Podiums (if any) | 0.0% |
| BUNGALOW NO A372 | Plinth | 100.0% |
| BUNGALOW NO A372 | Stilt Floor | 0.0% |
| BUNGALOW NO A372 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A372 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A372 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A372 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A372 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A372 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A373 | Excavation | 100.0% |
| BUNGALOW NO A373 | Basement (if any) | 100.0% |
| BUNGALOW NO A373 | Podiums (if any) | 0.0% |
| BUNGALOW NO A373 | Plinth | 100.0% |
| BUNGALOW NO A373 | Stilt Floor | 0.0% |
| BUNGALOW NO A373 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A373 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A373 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A373 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A373 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A373 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A374 | Excavation | 100.0% |
| BUNGALOW NO A374 | Basement (if any) | 100.0% |
| BUNGALOW NO A374 | Podiums (if any) | 0.0% |
| BUNGALOW NO A374 | Plinth | 100.0% |
| BUNGALOW NO A374 | Stilt Floor | 0.0% |
| BUNGALOW NO A374 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A374 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A374 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A374 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A374 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A374 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A375 | Excavation | 100.0% |
| BUNGALOW NO A375 | Basement (if any) | 100.0% |
| BUNGALOW NO A375 | Podiums (if any) | 0.0% |
| BUNGALOW NO A375 | Plinth | 100.0% |
| BUNGALOW NO A375 | Stilt Floor | 0.0% |
| BUNGALOW NO A375 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A375 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A375 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A375 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A375 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A375 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A376 | Excavation | 0.0% |
| BUNGALOW NO A376 | Basement (if any) | 0.0% |
| BUNGALOW NO A376 | Podiums (if any) | 0.0% |
| BUNGALOW NO A376 | Plinth | 0.0% |
| BUNGALOW NO A376 | Stilt Floor | 0.0% |
| BUNGALOW NO A376 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A376 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A376 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A376 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A376 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A376 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A377 | Excavation | 100.0% |
| BUNGALOW NO A377 | Basement (if any) | 100.0% |
| BUNGALOW NO A377 | Podiums (if any) | 0.0% |
| BUNGALOW NO A377 | Plinth | 100.0% |
| BUNGALOW NO A377 | Stilt Floor | 0.0% |
| BUNGALOW NO A377 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A377 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A377 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A377 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A377 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A377 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A378 | Excavation | 100.0% |
| BUNGALOW NO A378 | Basement (if any) | 100.0% |
| BUNGALOW NO A378 | Podiums (if any) | 0.0% |
| BUNGALOW NO A378 | Plinth | 100.0% |
| BUNGALOW NO A378 | Stilt Floor | 0.0% |
| BUNGALOW NO A378 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A378 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A378 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A378 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A378 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A378 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A379 | Excavation | 100.0% |
| BUNGALOW NO A379 | Basement (if any) | 100.0% |
| BUNGALOW NO A379 | Podiums (if any) | 0.0% |
| BUNGALOW NO A379 | Plinth | 100.0% |
| BUNGALOW NO A379 | Stilt Floor | 0.0% |
| BUNGALOW NO A379 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A379 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A379 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A379 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A379 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A379 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A380 | Excavation | 100.0% |
| BUNGALOW NO A380 | Basement (if any) | 100.0% |
| BUNGALOW NO A380 | Podiums (if any) | 0.0% |
| BUNGALOW NO A380 | Plinth | 100.0% |
| BUNGALOW NO A380 | Stilt Floor | 0.0% |
| BUNGALOW NO A380 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A380 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A380 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A380 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A380 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A380 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A381 | Excavation | 100.0% |
| BUNGALOW NO A381 | Basement (if any) | 100.0% |
| BUNGALOW NO A381 | Podiums (if any) | 0.0% |
| BUNGALOW NO A381 | Plinth | 100.0% |
| BUNGALOW NO A381 | Stilt Floor | 0.0% |
| BUNGALOW NO A381 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A381 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A381 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A381 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A381 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A381 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A382 | Excavation | 100.0% |
| BUNGALOW NO A382 | Basement (if any) | 100.0% |
| BUNGALOW NO A382 | Podiums (if any) | 0.0% |
| BUNGALOW NO A382 | Plinth | 100.0% |
| BUNGALOW NO A382 | Stilt Floor | 0.0% |
| BUNGALOW NO A382 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A382 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A382 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A382 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A382 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A382 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A383 | Excavation | 100.0% |
| BUNGALOW NO A383 | Basement (if any) | 100.0% |
| BUNGALOW NO A383 | Podiums (if any) | 0.0% |
| BUNGALOW NO A383 | Plinth | 100.0% |
| BUNGALOW NO A383 | Stilt Floor | 0.0% |
| BUNGALOW NO A383 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A383 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A383 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A383 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A383 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A383 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A384 | Excavation | 100.0% |
| BUNGALOW NO A384 | Basement (if any) | 100.0% |
| BUNGALOW NO A384 | Podiums (if any) | 0.0% |
| BUNGALOW NO A384 | Plinth | 100.0% |
| BUNGALOW NO A384 | Stilt Floor | 0.0% |
| BUNGALOW NO A384 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A384 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96.0% |
| BUNGALOW NO A384 | Sanitary Fittings within the flats / premises | 75.0% |
| BUNGALOW NO A384 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 76.0% |
| BUNGALOW NO A384 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A384 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A385 | Excavation | 100.0% |
| BUNGALOW NO A385 | Basement (if any) | 100.0% |
| BUNGALOW NO A385 | Podiums (if any) | 0.0% |
| BUNGALOW NO A385 | Plinth | 100.0% |
| BUNGALOW NO A385 | Stilt Floor | 0.0% |
| BUNGALOW NO A385 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A385 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A385 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A385 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A385 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A385 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A386 | Excavation | 100.0% |
| BUNGALOW NO A386 | Basement (if any) | 100.0% |
| BUNGALOW NO A386 | Podiums (if any) | 0.0% |
| BUNGALOW NO A386 | Plinth | 100.0% |
| BUNGALOW NO A386 | Stilt Floor | 0.0% |
| BUNGALOW NO A386 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A386 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A386 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A386 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A386 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A386 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A387 | Excavation | 100.0% |
| BUNGALOW NO A387 | Basement (if any) | 100.0% |
| BUNGALOW NO A387 | Podiums (if any) | 0.0% |
| BUNGALOW NO A387 | Plinth | 100.0% |
| BUNGALOW NO A387 | Stilt Floor | 0.0% |
| BUNGALOW NO A387 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A387 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A387 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A387 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A387 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A387 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A388 | Excavation | 100.0% |
| BUNGALOW NO A388 | Basement (if any) | 100.0% |
| BUNGALOW NO A388 | Podiums (if any) | 0.0% |
| BUNGALOW NO A388 | Plinth | 100.0% |
| BUNGALOW NO A388 | Stilt Floor | 0.0% |
| BUNGALOW NO A388 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A388 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A388 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A388 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A388 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A388 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A389 | Excavation | 100.0% |
| BUNGALOW NO A389 | Basement (if any) | 100.0% |
| BUNGALOW NO A389 | Podiums (if any) | 0.0% |
| BUNGALOW NO A389 | Plinth | 100.0% |
| BUNGALOW NO A389 | Stilt Floor | 0.0% |
| BUNGALOW NO A389 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A389 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A389 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A389 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A389 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A389 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A390 | Excavation | 100.0% |
| BUNGALOW NO A390 | Basement (if any) | 100.0% |
| BUNGALOW NO A390 | Podiums (if any) | 0.0% |
| BUNGALOW NO A390 | Plinth | 100.0% |
| BUNGALOW NO A390 | Stilt Floor | 0.0% |
| BUNGALOW NO A390 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A390 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A390 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A390 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A390 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A390 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A391 | Excavation | 100.0% |
| BUNGALOW NO A391 | Basement (if any) | 100.0% |
| BUNGALOW NO A391 | Podiums (if any) | 0.0% |
| BUNGALOW NO A391 | Plinth | 100.0% |
| BUNGALOW NO A391 | Stilt Floor | 0.0% |
| BUNGALOW NO A391 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A391 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A391 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A391 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A391 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A391 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A392 | Excavation | 100.0% |
| BUNGALOW NO A392 | Basement (if any) | 100.0% |
| BUNGALOW NO A392 | Podiums (if any) | 0.0% |
| BUNGALOW NO A392 | Plinth | 100.0% |
| BUNGALOW NO A392 | Stilt Floor | 0.0% |
| BUNGALOW NO A392 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A392 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A392 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A392 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50.0% |
| BUNGALOW NO A392 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A392 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A393 | Excavation | 100.0% |
| BUNGALOW NO A393 | Basement (if any) | 100.0% |
| BUNGALOW NO A393 | Podiums (if any) | 0.0% |
| BUNGALOW NO A393 | Plinth | 100.0% |
| BUNGALOW NO A393 | Stilt Floor | 0.0% |
| BUNGALOW NO A393 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A393 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A393 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A393 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A393 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A393 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A394 | Excavation | 100.0% |
| BUNGALOW NO A394 | Basement (if any) | 100.0% |
| BUNGALOW NO A394 | Podiums (if any) | 0.0% |
| BUNGALOW NO A394 | Plinth | 100.0% |
| BUNGALOW NO A394 | Stilt Floor | 0.0% |
| BUNGALOW NO A394 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A394 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 96.0% |
| BUNGALOW NO A394 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A394 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93.0% |
| BUNGALOW NO A394 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A394 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A395 | Excavation | 100.0% |
| BUNGALOW NO A395 | Basement (if any) | 100.0% |
| BUNGALOW NO A395 | Podiums (if any) | 0.0% |
| BUNGALOW NO A395 | Plinth | 100.0% |
| BUNGALOW NO A395 | Stilt Floor | 0.0% |
| BUNGALOW NO A395 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A395 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A395 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A395 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A395 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A395 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A396 | Excavation | 100.0% |
| BUNGALOW NO A396 | Basement (if any) | 100.0% |
| BUNGALOW NO A396 | Podiums (if any) | 0.0% |
| BUNGALOW NO A396 | Plinth | 100.0% |
| BUNGALOW NO A396 | Stilt Floor | 0.0% |
| BUNGALOW NO A396 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A396 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A396 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A396 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A396 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A396 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A397 | Excavation | 100.0% |
| BUNGALOW NO A397 | Basement (if any) | 100.0% |
| BUNGALOW NO A397 | Podiums (if any) | 0.0% |
| BUNGALOW NO A397 | Plinth | 100.0% |
| BUNGALOW NO A397 | Stilt Floor | 0.0% |
| BUNGALOW NO A397 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A397 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A397 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A397 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A397 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A397 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A398 | Excavation | 100.0% |
| BUNGALOW NO A398 | Basement (if any) | 100.0% |
| BUNGALOW NO A398 | Podiums (if any) | 0.0% |
| BUNGALOW NO A398 | Plinth | 100.0% |
| BUNGALOW NO A398 | Stilt Floor | 0.0% |
| BUNGALOW NO A398 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A398 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A398 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A398 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A398 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A398 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A399 | Excavation | 100.0% |
| BUNGALOW NO A399 | Basement (if any) | 100.0% |
| BUNGALOW NO A399 | Podiums (if any) | 0.0% |
| BUNGALOW NO A399 | Plinth | 100.0% |
| BUNGALOW NO A399 | Stilt Floor | 0.0% |
| BUNGALOW NO A399 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A399 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A399 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A399 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A399 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A399 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A400 | Excavation | 100.0% |
| BUNGALOW NO A400 | Basement (if any) | 100.0% |
| BUNGALOW NO A400 | Podiums (if any) | 0.0% |
| BUNGALOW NO A400 | Plinth | 100.0% |
| BUNGALOW NO A400 | Stilt Floor | 0.0% |
| BUNGALOW NO A400 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A400 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A400 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A400 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A400 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A400 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A401 | Excavation | 100.0% |
| BUNGALOW NO A401 | Basement (if any) | 100.0% |
| BUNGALOW NO A401 | Podiums (if any) | 0.0% |
| BUNGALOW NO A401 | Plinth | 100.0% |
| BUNGALOW NO A401 | Stilt Floor | 0.0% |
| BUNGALOW NO A401 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A401 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A401 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A401 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A401 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A401 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A402 | Excavation | 100.0% |
| BUNGALOW NO A402 | Basement (if any) | 100.0% |
| BUNGALOW NO A402 | Podiums (if any) | 0.0% |
| BUNGALOW NO A402 | Plinth | 100.0% |
| BUNGALOW NO A402 | Stilt Floor | 0.0% |
| BUNGALOW NO A402 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A402 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A402 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A402 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A402 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A402 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A403 | Excavation | 100.0% |
| BUNGALOW NO A403 | Basement (if any) | 100.0% |
| BUNGALOW NO A403 | Podiums (if any) | 0.0% |
| BUNGALOW NO A403 | Plinth | 100.0% |
| BUNGALOW NO A403 | Stilt Floor | 0.0% |
| BUNGALOW NO A403 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A403 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A403 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A403 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A403 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A403 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A404 | Excavation | 100.0% |
| BUNGALOW NO A404 | Basement (if any) | 100.0% |
| BUNGALOW NO A404 | Podiums (if any) | 0.0% |
| BUNGALOW NO A404 | Plinth | 100.0% |
| BUNGALOW NO A404 | Stilt Floor | 0.0% |
| BUNGALOW NO A404 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A404 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A404 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A404 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A404 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A404 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A405 | Excavation | 100.0% |
| BUNGALOW NO A405 | Basement (if any) | 100.0% |
| BUNGALOW NO A405 | Podiums (if any) | 0.0% |
| BUNGALOW NO A405 | Plinth | 100.0% |
| BUNGALOW NO A405 | Stilt Floor | 0.0% |
| BUNGALOW NO A405 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A405 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A405 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A405 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A405 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A405 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A406 | Excavation | 100.0% |
| BUNGALOW NO A406 | Basement (if any) | 100.0% |
| BUNGALOW NO A406 | Podiums (if any) | 0.0% |
| BUNGALOW NO A406 | Plinth | 100.0% |
| BUNGALOW NO A406 | Stilt Floor | 0.0% |
| BUNGALOW NO A406 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A406 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A406 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A406 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A406 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A406 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A407 | Excavation | 100.0% |
| BUNGALOW NO A407 | Basement (if any) | 100.0% |
| BUNGALOW NO A407 | Podiums (if any) | 0.0% |
| BUNGALOW NO A407 | Plinth | 100.0% |
| BUNGALOW NO A407 | Stilt Floor | 0.0% |
| BUNGALOW NO A407 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A407 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A407 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A407 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A407 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A407 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A408 | Excavation | 100.0% |
| BUNGALOW NO A408 | Basement (if any) | 100.0% |
| BUNGALOW NO A408 | Podiums (if any) | 0.0% |
| BUNGALOW NO A408 | Plinth | 100.0% |
| BUNGALOW NO A408 | Stilt Floor | 0.0% |
| BUNGALOW NO A408 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A408 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A408 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A408 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A408 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A408 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A409 | Excavation | 100.0% |
| BUNGALOW NO A409 | Basement (if any) | 100.0% |
| BUNGALOW NO A409 | Podiums (if any) | 0.0% |
| BUNGALOW NO A409 | Plinth | 100.0% |
| BUNGALOW NO A409 | Stilt Floor | 0.0% |
| BUNGALOW NO A409 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A409 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A409 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A409 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A409 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A409 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A410 | Excavation | 100.0% |
| BUNGALOW NO A410 | Basement (if any) | 100.0% |
| BUNGALOW NO A410 | Podiums (if any) | 0.0% |
| BUNGALOW NO A410 | Plinth | 100.0% |
| BUNGALOW NO A410 | Stilt Floor | 0.0% |
| BUNGALOW NO A410 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A410 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A410 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A410 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A410 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A410 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A411 | Excavation | 100.0% |
| BUNGALOW NO A411 | Basement (if any) | 100.0% |
| BUNGALOW NO A411 | Podiums (if any) | 0.0% |
| BUNGALOW NO A411 | Plinth | 100.0% |
| BUNGALOW NO A411 | Stilt Floor | 0.0% |
| BUNGALOW NO A411 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A411 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A411 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A411 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A411 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A411 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A412 | Excavation | 100.0% |
| BUNGALOW NO A412 | Basement (if any) | 100.0% |
| BUNGALOW NO A412 | Podiums (if any) | 0.0% |
| BUNGALOW NO A412 | Plinth | 100.0% |
| BUNGALOW NO A412 | Stilt Floor | 0.0% |
| BUNGALOW NO A412 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A412 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A412 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A412 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A412 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A412 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A413 | Excavation | 100.0% |
| BUNGALOW NO A413 | Basement (if any) | 100.0% |
| BUNGALOW NO A413 | Podiums (if any) | 0.0% |
| BUNGALOW NO A413 | Plinth | 100.0% |
| BUNGALOW NO A413 | Stilt Floor | 0.0% |
| BUNGALOW NO A413 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A413 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A413 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A413 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A413 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A413 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A414 | Excavation | 100.0% |
| BUNGALOW NO A414 | Basement (if any) | 100.0% |
| BUNGALOW NO A414 | Podiums (if any) | 0.0% |
| BUNGALOW NO A414 | Plinth | 100.0% |
| BUNGALOW NO A414 | Stilt Floor | 0.0% |
| BUNGALOW NO A414 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A414 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A414 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A414 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A414 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A414 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A415 | Excavation | 100.0% |
| BUNGALOW NO A415 | Basement (if any) | 100.0% |
| BUNGALOW NO A415 | Podiums (if any) | 0.0% |
| BUNGALOW NO A415 | Plinth | 100.0% |
| BUNGALOW NO A415 | Stilt Floor | 0.0% |
| BUNGALOW NO A415 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A415 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 48.0% |
| BUNGALOW NO A415 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A415 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 73.0% |
| BUNGALOW NO A415 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A415 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A416 | Excavation | 100.0% |
| BUNGALOW NO A416 | Basement (if any) | 100.0% |
| BUNGALOW NO A416 | Podiums (if any) | 0.0% |
| BUNGALOW NO A416 | Plinth | 100.0% |
| BUNGALOW NO A416 | Stilt Floor | 0.0% |
| BUNGALOW NO A416 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A416 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A416 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A416 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A416 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A416 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A417 | Excavation | 100.0% |
| BUNGALOW NO A417 | Basement (if any) | 100.0% |
| BUNGALOW NO A417 | Podiums (if any) | 0.0% |
| BUNGALOW NO A417 | Plinth | 100.0% |
| BUNGALOW NO A417 | Stilt Floor | 0.0% |
| BUNGALOW NO A417 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A417 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A417 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A417 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A417 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A417 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A418 | Excavation | 100.0% |
| BUNGALOW NO A418 | Basement (if any) | 100.0% |
| BUNGALOW NO A418 | Podiums (if any) | 0.0% |
| BUNGALOW NO A418 | Plinth | 100.0% |
| BUNGALOW NO A418 | Stilt Floor | 0.0% |
| BUNGALOW NO A418 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A418 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A418 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A418 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A418 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A418 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A419 | Excavation | 100.0% |
| BUNGALOW NO A419 | Basement (if any) | 100.0% |
| BUNGALOW NO A419 | Podiums (if any) | 0.0% |
| BUNGALOW NO A419 | Plinth | 100.0% |
| BUNGALOW NO A419 | Stilt Floor | 0.0% |
| BUNGALOW NO A419 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A419 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A419 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A419 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A419 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A419 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A420 | Excavation | 100.0% |
| BUNGALOW NO A420 | Basement (if any) | 100.0% |
| BUNGALOW NO A420 | Podiums (if any) | 0.0% |
| BUNGALOW NO A420 | Plinth | 100.0% |
| BUNGALOW NO A420 | Stilt Floor | 0.0% |
| BUNGALOW NO A420 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A420 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A420 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A420 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A420 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A420 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70.0% |
| BUNGALOW NO A421 | Excavation | 100.0% |
| BUNGALOW NO A421 | Basement (if any) | 100.0% |
| BUNGALOW NO A421 | Podiums (if any) | 0.0% |
| BUNGALOW NO A421 | Plinth | 100.0% |
| BUNGALOW NO A421 | Stilt Floor | 0.0% |
| BUNGALOW NO A421 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A421 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A421 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A421 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A421 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A421 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A422 | Excavation | 100.0% |
| BUNGALOW NO A422 | Basement (if any) | 100.0% |
| BUNGALOW NO A422 | Podiums (if any) | 0.0% |
| BUNGALOW NO A422 | Plinth | 100.0% |
| BUNGALOW NO A422 | Stilt Floor | 0.0% |
| BUNGALOW NO A422 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A422 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A422 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A422 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A422 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A422 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A423 | Excavation | 100.0% |
| BUNGALOW NO A423 | Basement (if any) | 100.0% |
| BUNGALOW NO A423 | Podiums (if any) | 0.0% |
| BUNGALOW NO A423 | Plinth | 100.0% |
| BUNGALOW NO A423 | Stilt Floor | 0.0% |
| BUNGALOW NO A423 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A423 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A423 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A423 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A423 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A423 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A424 | Excavation | 100.0% |
| BUNGALOW NO A424 | Basement (if any) | 100.0% |
| BUNGALOW NO A424 | Podiums (if any) | 0.0% |
| BUNGALOW NO A424 | Plinth | 100.0% |
| BUNGALOW NO A424 | Stilt Floor | 0.0% |
| BUNGALOW NO A424 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A424 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A424 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A424 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A424 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A424 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A425 | Excavation | 100.0% |
| BUNGALOW NO A425 | Basement (if any) | 100.0% |
| BUNGALOW NO A425 | Podiums (if any) | 0.0% |
| BUNGALOW NO A425 | Plinth | 100.0% |
| BUNGALOW NO A425 | Stilt Floor | 0.0% |
| BUNGALOW NO A425 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A425 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A425 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A425 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A425 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A425 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A426 | Excavation | 100.0% |
| BUNGALOW NO A426 | Basement (if any) | 100.0% |
| BUNGALOW NO A426 | Podiums (if any) | 0.0% |
| BUNGALOW NO A426 | Plinth | 100.0% |
| BUNGALOW NO A426 | Stilt Floor | 0.0% |
| BUNGALOW NO A426 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A426 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A426 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A426 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A426 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A426 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A427 | Excavation | 100.0% |
| BUNGALOW NO A427 | Basement (if any) | 100.0% |
| BUNGALOW NO A427 | Podiums (if any) | 0.0% |
| BUNGALOW NO A427 | Plinth | 100.0% |
| BUNGALOW NO A427 | Stilt Floor | 0.0% |
| BUNGALOW NO A427 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A427 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A427 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A427 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A427 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A427 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A428 | Excavation | 100.0% |
| BUNGALOW NO A428 | Basement (if any) | 100.0% |
| BUNGALOW NO A428 | Podiums (if any) | 0.0% |
| BUNGALOW NO A428 | Plinth | 100.0% |
| BUNGALOW NO A428 | Stilt Floor | 0.0% |
| BUNGALOW NO A428 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A428 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A428 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A428 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A428 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A428 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A429 | Excavation | 100.0% |
| BUNGALOW NO A429 | Basement (if any) | 100.0% |
| BUNGALOW NO A429 | Podiums (if any) | 0.0% |
| BUNGALOW NO A429 | Plinth | 100.0% |
| BUNGALOW NO A429 | Stilt Floor | 0.0% |
| BUNGALOW NO A429 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A429 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A429 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A429 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A429 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A429 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A430 | Excavation | 100.0% |
| BUNGALOW NO A430 | Basement (if any) | 100.0% |
| BUNGALOW NO A430 | Podiums (if any) | 0.0% |
| BUNGALOW NO A430 | Plinth | 100.0% |
| BUNGALOW NO A430 | Stilt Floor | 0.0% |
| BUNGALOW NO A430 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A430 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A430 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A430 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A430 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A430 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A431 | Excavation | 100.0% |
| BUNGALOW NO A431 | Basement (if any) | 100.0% |
| BUNGALOW NO A431 | Podiums (if any) | 0.0% |
| BUNGALOW NO A431 | Plinth | 100.0% |
| BUNGALOW NO A431 | Stilt Floor | 0.0% |
| BUNGALOW NO A431 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A431 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A431 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A431 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A431 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A431 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A432 | Excavation | 100.0% |
| BUNGALOW NO A432 | Basement (if any) | 100.0% |
| BUNGALOW NO A432 | Podiums (if any) | 0.0% |
| BUNGALOW NO A432 | Plinth | 100.0% |
| BUNGALOW NO A432 | Stilt Floor | 0.0% |
| BUNGALOW NO A432 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A432 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A432 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A432 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A432 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A432 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A433 | Excavation | 100.0% |
| BUNGALOW NO A433 | Basement (if any) | 100.0% |
| BUNGALOW NO A433 | Podiums (if any) | 0.0% |
| BUNGALOW NO A433 | Plinth | 100.0% |
| BUNGALOW NO A433 | Stilt Floor | 0.0% |
| BUNGALOW NO A433 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A433 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A433 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A433 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A433 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A433 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A434 | Excavation | 100.0% |
| BUNGALOW NO A434 | Basement (if any) | 100.0% |
| BUNGALOW NO A434 | Podiums (if any) | 0.0% |
| BUNGALOW NO A434 | Plinth | 100.0% |
| BUNGALOW NO A434 | Stilt Floor | 0.0% |
| BUNGALOW NO A434 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A434 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A434 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A434 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A434 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A434 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A435 | Excavation | 100.0% |
| BUNGALOW NO A435 | Basement (if any) | 100.0% |
| BUNGALOW NO A435 | Podiums (if any) | 0.0% |
| BUNGALOW NO A435 | Plinth | 100.0% |
| BUNGALOW NO A435 | Stilt Floor | 0.0% |
| BUNGALOW NO A435 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A435 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 76.0% |
| BUNGALOW NO A435 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A435 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93.0% |
| BUNGALOW NO A435 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A435 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A436 | Excavation | 100.0% |
| BUNGALOW NO A436 | Basement (if any) | 100.0% |
| BUNGALOW NO A436 | Podiums (if any) | 0.0% |
| BUNGALOW NO A436 | Plinth | 100.0% |
| BUNGALOW NO A436 | Stilt Floor | 0.0% |
| BUNGALOW NO A436 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A436 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A436 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A436 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A436 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A436 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A437 | Excavation | 100.0% |
| BUNGALOW NO A437 | Basement (if any) | 100.0% |
| BUNGALOW NO A437 | Podiums (if any) | 0.0% |
| BUNGALOW NO A437 | Plinth | 100.0% |
| BUNGALOW NO A437 | Stilt Floor | 0.0% |
| BUNGALOW NO A437 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A437 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A437 | Sanitary Fittings within the flats / premises | 10.0% |
| BUNGALOW NO A437 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47.0% |
| BUNGALOW NO A437 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A437 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A438 | Excavation | 100.0% |
| BUNGALOW NO A438 | Basement (if any) | 100.0% |
| BUNGALOW NO A438 | Podiums (if any) | 0.0% |
| BUNGALOW NO A438 | Plinth | 100.0% |
| BUNGALOW NO A438 | Stilt Floor | 0.0% |
| BUNGALOW NO A438 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A438 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A438 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A438 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A438 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A438 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A439 | Excavation | 100.0% |
| BUNGALOW NO A439 | Basement (if any) | 100.0% |
| BUNGALOW NO A439 | Podiums (if any) | 0.0% |
| BUNGALOW NO A439 | Plinth | 100.0% |
| BUNGALOW NO A439 | Stilt Floor | 0.0% |
| BUNGALOW NO A439 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A439 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A439 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A439 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A439 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A439 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A440 | Excavation | 100.0% |
| BUNGALOW NO A440 | Basement (if any) | 100.0% |
| BUNGALOW NO A440 | Podiums (if any) | 0.0% |
| BUNGALOW NO A440 | Plinth | 100.0% |
| BUNGALOW NO A440 | Stilt Floor | 0.0% |
| BUNGALOW NO A440 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A440 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A440 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A440 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A440 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A440 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A441 | Excavation | 100.0% |
| BUNGALOW NO A441 | Basement (if any) | 100.0% |
| BUNGALOW NO A441 | Podiums (if any) | 0.0% |
| BUNGALOW NO A441 | Plinth | 100.0% |
| BUNGALOW NO A441 | Stilt Floor | 0.0% |
| BUNGALOW NO A441 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A441 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A441 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A441 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A441 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A441 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A442 | Excavation | 100.0% |
| BUNGALOW NO A442 | Basement (if any) | 100.0% |
| BUNGALOW NO A442 | Podiums (if any) | 0.0% |
| BUNGALOW NO A442 | Plinth | 100.0% |
| BUNGALOW NO A442 | Stilt Floor | 0.0% |
| BUNGALOW NO A442 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A442 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A442 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A442 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A442 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A442 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A443 | Excavation | 100.0% |
| BUNGALOW NO A443 | Basement (if any) | 100.0% |
| BUNGALOW NO A443 | Podiums (if any) | 0.0% |
| BUNGALOW NO A443 | Plinth | 100.0% |
| BUNGALOW NO A443 | Stilt Floor | 0.0% |
| BUNGALOW NO A443 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A443 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A443 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A443 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A443 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A443 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A444 | Excavation | 100.0% |
| BUNGALOW NO A444 | Basement (if any) | 100.0% |
| BUNGALOW NO A444 | Podiums (if any) | 0.0% |
| BUNGALOW NO A444 | Plinth | 100.0% |
| BUNGALOW NO A444 | Stilt Floor | 0.0% |
| BUNGALOW NO A444 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A444 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A444 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A444 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A444 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A444 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A445 | Excavation | 100.0% |
| BUNGALOW NO A445 | Basement (if any) | 100.0% |
| BUNGALOW NO A445 | Podiums (if any) | 0.0% |
| BUNGALOW NO A445 | Plinth | 100.0% |
| BUNGALOW NO A445 | Stilt Floor | 0.0% |
| BUNGALOW NO A445 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A445 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A445 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A445 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A445 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A445 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A446 | Excavation | 100.0% |
| BUNGALOW NO A446 | Basement (if any) | 100.0% |
| BUNGALOW NO A446 | Podiums (if any) | 0.0% |
| BUNGALOW NO A446 | Plinth | 100.0% |
| BUNGALOW NO A446 | Stilt Floor | 0.0% |
| BUNGALOW NO A446 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A446 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A446 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A446 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A446 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A446 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A447 | Excavation | 100.0% |
| BUNGALOW NO A447 | Basement (if any) | 100.0% |
| BUNGALOW NO A447 | Podiums (if any) | 0.0% |
| BUNGALOW NO A447 | Plinth | 100.0% |
| BUNGALOW NO A447 | Stilt Floor | 0.0% |
| BUNGALOW NO A447 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A447 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A447 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A447 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A447 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A447 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A448 | Excavation | 100.0% |
| BUNGALOW NO A448 | Basement (if any) | 100.0% |
| BUNGALOW NO A448 | Podiums (if any) | 0.0% |
| BUNGALOW NO A448 | Plinth | 100.0% |
| BUNGALOW NO A448 | Stilt Floor | 0.0% |
| BUNGALOW NO A448 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A448 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A448 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A448 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A448 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A448 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A449 | Excavation | 100.0% |
| BUNGALOW NO A449 | Basement (if any) | 100.0% |
| BUNGALOW NO A449 | Podiums (if any) | 0.0% |
| BUNGALOW NO A449 | Plinth | 100.0% |
| BUNGALOW NO A449 | Stilt Floor | 0.0% |
| BUNGALOW NO A449 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A449 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A449 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A449 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A449 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A449 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A450 | Excavation | 100.0% |
| BUNGALOW NO A450 | Basement (if any) | 100.0% |
| BUNGALOW NO A450 | Podiums (if any) | 0.0% |
| BUNGALOW NO A450 | Plinth | 100.0% |
| BUNGALOW NO A450 | Stilt Floor | 0.0% |
| BUNGALOW NO A450 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A450 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A450 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A450 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A450 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A450 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A451 | Excavation | 100.0% |
| BUNGALOW NO A451 | Basement (if any) | 100.0% |
| BUNGALOW NO A451 | Podiums (if any) | 0.0% |
| BUNGALOW NO A451 | Plinth | 100.0% |
| BUNGALOW NO A451 | Stilt Floor | 0.0% |
| BUNGALOW NO A451 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A451 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A451 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A451 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A451 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A451 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 70.0% |
| BUNGALOW NO A452 | Excavation | 100.0% |
| BUNGALOW NO A452 | Basement (if any) | 0.0% |
| BUNGALOW NO A452 | Podiums (if any) | 0.0% |
| BUNGALOW NO A452 | Plinth | 0.0% |
| BUNGALOW NO A452 | Stilt Floor | 0.0% |
| BUNGALOW NO A452 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A452 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A452 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A452 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A452 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A452 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A453 | Excavation | 0.0% |
| BUNGALOW NO A453 | Basement (if any) | 0.0% |
| BUNGALOW NO A453 | Podiums (if any) | 0.0% |
| BUNGALOW NO A453 | Plinth | 0.0% |
| BUNGALOW NO A453 | Stilt Floor | 0.0% |
| BUNGALOW NO A453 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A453 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A453 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A453 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A453 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A453 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A454 | Excavation | 0.0% |
| BUNGALOW NO A454 | Basement (if any) | 0.0% |
| BUNGALOW NO A454 | Podiums (if any) | 0.0% |
| BUNGALOW NO A454 | Plinth | 0.0% |
| BUNGALOW NO A454 | Stilt Floor | 0.0% |
| BUNGALOW NO A454 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A454 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A454 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A454 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A454 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A454 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A455 | Excavation | 100.0% |
| BUNGALOW NO A455 | Basement (if any) | 100.0% |
| BUNGALOW NO A455 | Podiums (if any) | 0.0% |
| BUNGALOW NO A455 | Plinth | 100.0% |
| BUNGALOW NO A455 | Stilt Floor | 0.0% |
| BUNGALOW NO A455 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A455 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A455 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A455 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A455 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A455 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A456 | Excavation | 100.0% |
| BUNGALOW NO A456 | Basement (if any) | 100.0% |
| BUNGALOW NO A456 | Podiums (if any) | 0.0% |
| BUNGALOW NO A456 | Plinth | 100.0% |
| BUNGALOW NO A456 | Stilt Floor | 0.0% |
| BUNGALOW NO A456 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A456 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A456 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A456 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A456 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A456 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A457 | Excavation | 100.0% |
| BUNGALOW NO A457 | Basement (if any) | 100.0% |
| BUNGALOW NO A457 | Podiums (if any) | 0.0% |
| BUNGALOW NO A457 | Plinth | 100.0% |
| BUNGALOW NO A457 | Stilt Floor | 0.0% |
| BUNGALOW NO A457 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A457 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A457 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A457 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A457 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A457 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A458 | Excavation | 100.0% |
| BUNGALOW NO A458 | Basement (if any) | 100.0% |
| BUNGALOW NO A458 | Podiums (if any) | 0.0% |
| BUNGALOW NO A458 | Plinth | 100.0% |
| BUNGALOW NO A458 | Stilt Floor | 0.0% |
| BUNGALOW NO A458 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A458 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A458 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A458 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A458 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 76.0% |
| BUNGALOW NO A458 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100018391
| Revised target | Reason given by the builder |
|---|---|
| 30 December 2027 | To, The MahaRERA Authority, Sub : Reason for the Extension to the Project Vaarivana Phase A1 bearing Registration No. P52100018391. Due to certain technical issues, the project could not be commenced within the originally scheduled timeline. At present, all works are being carried out strictly in accordance with the applicable rules and regulations, and the internal construction activities are in full progress. Upon completion of the construction, additional time will be required to obtain the Occupation Certificate from the concerned authority. We sincerely request your kind consideration in processing the pending extension application, and we assure you that we are making every effort to meet the regulatory requirements and complete the project as per the revised timelines. In view of the above, we hereby apply for an extension of the project completion date up to 30/12/2027. |
MahaRERA project filing · read 19 July 2026 · registration P52100018391
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹957,908,137 | ₹743,517,898 | ₹652,324,939 | ₹2,353,750,974 |
| Actual raised | ₹85,017,102 | ₹743,517,898 | ₹1,426,197,738 | ₹2,254,732,738 |
MahaRERA project filing · read 19 July 2026 · registration P52100018391
34 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.
MahaRERA project filing · read 19 July 2026 · registration P52100018391
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100018391
Builder and past records
Projects registered under this company
10Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
26 September 2026
8 marked unsold · 276 sold · 0 booked.
Saved MahaRERA home list
17 September 2026
8 marked unsold · 276 sold · 0 booked.
Saved MahaRERA home list
8 September 2026
8 marked unsold · 276 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
8 marked unsold · 276 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Urse · Pune
P52100077518
120 of 120 entries marked unsold
MahaRERA · per-home inventory · read 19 July 2026
View project details →Urse · Pune
P52100025843
4 of 170 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Urse · Pune
P52100018123
2 of 150 entries marked unsold
MahaRERA · per-home inventory · read 19 July 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100018391 ↗