Sanjivani Integrated Township LLP · P52100025843
For Vaarivana Phase A - 2 (P52100025843), 4 of 170 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
For Vaarivana Phase A - 2, ₹7,891 per sq ft of carpet area is the median rate across 166 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Prices reported to RERA
₹7,891/ sq ft carpet area
Across 166 sold or booked entries with reported prices. The middle 80% of rates fall between ₹6,311 and ₹9,510.
MahaRERA · per-home inventory · saved-file date 18 July 2026
For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.
Sales Report
Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.
Inside this registered phase
170 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| BUNGALOW NO A10 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A11 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A13 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A14 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A15 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A16 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A17 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A18 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A19 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A20 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A21 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A22 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A23 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A24 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A25 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A26 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A262 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A263 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A264 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A265 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A266 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A267 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A268 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A269 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A27 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A270 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A271 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A272 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A273 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A274 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A275 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A276 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A277 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A278 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A279 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A28 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A280 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A281 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A282 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A283 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A284 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A285 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A286 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A287 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A288 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A289 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A29 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A290 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A291 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A292 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A293 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A294 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A295 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A296 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A297 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A298 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A299 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A30 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A300 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A301 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A302 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A303 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A304 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A305 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A306 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A307 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A308 | 1 | 0 | 0 | 1 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A309 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A31 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A310 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A311 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A312 | 1 | 1 | 0 | 0 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A313 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A314 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A315 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A316 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A317 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A318 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A319 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A32 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A320 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A321 | 1 | 1 | 0 | 0 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A322 | 1 | 0 | 0 | 1 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A323 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A324 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A325 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A326 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A327 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A328 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A329 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A33 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A330 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A331 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A332 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A333 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A334 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A335 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A336 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A337 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A338 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A339 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A34 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A340 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A341 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A342 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A343 | 1 | 1 | 0 | 0 | 0 | 153.32 sq m≈ 1,650 sq ft |
| BUNGALOW NO A344 | 1 | 1 | 0 | 0 | 0 | 154.40 sq m≈ 1,662 sq ft |
| BUNGALOW NO A345 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A346 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A347 | 1 | 1 | 0 | 0 | 0 | 152.86 sq m≈ 1,645 sq ft |
| BUNGALOW NO A348 | 1 | 1 | 0 | 0 | 0 | 148.63 sq m≈ 1,600 sq ft |
| BUNGALOW NO A349 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A35 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A350 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A351 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A352 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A353 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A354 | 1 | 1 | 0 | 0 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A355 | 1 | 1 | 0 | 0 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A356 | 1 | 1 | 0 | 0 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A357 | 1 | 1 | 0 | 0 | 0 | 198.14 sq m≈ 2,133 sq ft |
| BUNGALOW NO A36 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A37 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A38 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A39 | 1 | 1 | 0 | 0 | 0 | 276.85 sq m≈ 2,980 sq ft |
| BUNGALOW NO A40 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A41 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A42 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A43 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A44 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A45 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A46 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A47 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A48 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A49 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A5 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A50 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A51 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A52 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A53 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A54 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A55 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A56 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A57 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A58 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A59 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A6 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A60 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A61 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A62 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A63 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A64 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A65 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A66 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A67 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A68 | 1 | 1 | 0 | 0 | 0 | 197.80 sq m≈ 2,129 sq ft |
| BUNGALOW NO A69 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A7 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A70 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A71 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A72 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A73 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A74 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A75 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A76 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A77 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A78 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A8 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGALOW NO A9 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
| BUNGAOW NO A12 | 1 | 1 | 0 | 0 | 0 | 196.36 sq m≈ 2,114 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 10BUNGALOW NO A10 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹16,101,000 | |
| 11BUNGALOW NO A11 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹18,750,697 | |
| 13BUNGALOW NO A13 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹16,561,868 | |
| 14BUNGALOW NO A14 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹16,793,822 | |
| 15BUNGALOW NO A15 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹13,193,000 | |
| 16BUNGALOW NO A16 | 1 | 196.36 sq m≈ 2,114 sq ft | Sold | ₹14,752,872 | |
| 17BUNGALOW NO A17 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹17,712,258 | |
| 18BUNGALOW NO A18 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹17,022,089 | |
| 19BUNGALOW NO A19 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹17,372,688 | |
| 20BUNGALOW NO A20 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹17,544,478 | |
| 21BUNGALOW NO A21 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹17,765,399 | |
| 22BUNGALOW NO A22 | 1 | 197.8 sq m≈ 2,129 sq ft | Sold | ₹13,065,223 |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹1,009,225,277 of an estimated ₹1,582,451,547 was reported as incurred (63.8%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration P52100025843
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| BUNGALOW NO A5 | Excavation | 100.0% |
| BUNGALOW NO A5 | Basement (if any) | 100.0% |
| BUNGALOW NO A5 | Podiums (if any) | 0.0% |
| BUNGALOW NO A5 | Plinth | 100.0% |
| BUNGALOW NO A5 | Stilt Floor | 0.0% |
| BUNGALOW NO A5 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A5 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A5 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A5 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87.0% |
| BUNGALOW NO A5 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A5 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A6 | Excavation | 100.0% |
| BUNGALOW NO A6 | Basement (if any) | 100.0% |
| BUNGALOW NO A6 | Podiums (if any) | 0.0% |
| BUNGALOW NO A6 | Plinth | 100.0% |
| BUNGALOW NO A6 | Stilt Floor | 0.0% |
| BUNGALOW NO A6 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A6 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A6 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A6 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A6 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A6 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A7 | Excavation | 100.0% |
| BUNGALOW NO A7 | Basement (if any) | 100.0% |
| BUNGALOW NO A7 | Podiums (if any) | 0.0% |
| BUNGALOW NO A7 | Plinth | 100.0% |
| BUNGALOW NO A7 | Stilt Floor | 0.0% |
| BUNGALOW NO A7 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A7 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68.0% |
| BUNGALOW NO A7 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A7 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87.0% |
| BUNGALOW NO A7 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A7 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A8 | Excavation | 100.0% |
| BUNGALOW NO A8 | Basement (if any) | 100.0% |
| BUNGALOW NO A8 | Podiums (if any) | 0.0% |
| BUNGALOW NO A8 | Plinth | 100.0% |
| BUNGALOW NO A8 | Stilt Floor | 0.0% |
| BUNGALOW NO A8 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A8 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 57.0% |
| BUNGALOW NO A8 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A8 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87.0% |
| BUNGALOW NO A8 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A8 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A9 | Excavation | 100.0% |
| BUNGALOW NO A9 | Basement (if any) | 100.0% |
| BUNGALOW NO A9 | Podiums (if any) | 0.0% |
| BUNGALOW NO A9 | Plinth | 100.0% |
| BUNGALOW NO A9 | Stilt Floor | 0.0% |
| BUNGALOW NO A9 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A9 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 54.0% |
| BUNGALOW NO A9 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A9 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70.0% |
| BUNGALOW NO A9 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A9 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A10 | Excavation | 100.0% |
| BUNGALOW NO A10 | Basement (if any) | 100.0% |
| BUNGALOW NO A10 | Podiums (if any) | 0.0% |
| BUNGALOW NO A10 | Plinth | 100.0% |
| BUNGALOW NO A10 | Stilt Floor | 0.0% |
| BUNGALOW NO A10 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A10 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A10 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A10 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A10 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A10 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A11 | Excavation | 100.0% |
| BUNGALOW NO A11 | Basement (if any) | 100.0% |
| BUNGALOW NO A11 | Podiums (if any) | 0.0% |
| BUNGALOW NO A11 | Plinth | 100.0% |
| BUNGALOW NO A11 | Stilt Floor | 0.0% |
| BUNGALOW NO A11 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A11 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 57.0% |
| BUNGALOW NO A11 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A11 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 75.0% |
| BUNGALOW NO A11 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 72.0% |
| BUNGALOW NO A11 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGAOW NO A12 | Excavation | 100.0% |
| BUNGAOW NO A12 | Basement (if any) | 100.0% |
| BUNGAOW NO A12 | Podiums (if any) | 0.0% |
| BUNGAOW NO A12 | Plinth | 100.0% |
| BUNGAOW NO A12 | Stilt Floor | 0.0% |
| BUNGAOW NO A12 | Slabs of Super Structure | 100.0% |
| BUNGAOW NO A12 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGAOW NO A12 | Sanitary Fittings within the flats / premises | 29.0% |
| BUNGAOW NO A12 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGAOW NO A12 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGAOW NO A12 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A13 | Excavation | 100.0% |
| BUNGALOW NO A13 | Basement (if any) | 100.0% |
| BUNGALOW NO A13 | Podiums (if any) | 0.0% |
| BUNGALOW NO A13 | Plinth | 100.0% |
| BUNGALOW NO A13 | Stilt Floor | 0.0% |
| BUNGALOW NO A13 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A13 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A13 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A13 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A13 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A13 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A14 | Excavation | 100.0% |
| BUNGALOW NO A14 | Basement (if any) | 100.0% |
| BUNGALOW NO A14 | Podiums (if any) | 0.0% |
| BUNGALOW NO A14 | Plinth | 100.0% |
| BUNGALOW NO A14 | Stilt Floor | 0.0% |
| BUNGALOW NO A14 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A14 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A14 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A14 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A14 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A14 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A15 | Excavation | 100.0% |
| BUNGALOW NO A15 | Basement (if any) | 100.0% |
| BUNGALOW NO A15 | Podiums (if any) | 0.0% |
| BUNGALOW NO A15 | Plinth | 100.0% |
| BUNGALOW NO A15 | Stilt Floor | 0.0% |
| BUNGALOW NO A15 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A15 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A15 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A15 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A15 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33.0% |
| BUNGALOW NO A15 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A16 | Excavation | 100.0% |
| BUNGALOW NO A16 | Basement (if any) | 100.0% |
| BUNGALOW NO A16 | Podiums (if any) | 0.0% |
| BUNGALOW NO A16 | Plinth | 100.0% |
| BUNGALOW NO A16 | Stilt Floor | 0.0% |
| BUNGALOW NO A16 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A16 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A16 | Sanitary Fittings within the flats / premises | 19.0% |
| BUNGALOW NO A16 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A16 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A16 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A17 | Excavation | 100.0% |
| BUNGALOW NO A17 | Basement (if any) | 100.0% |
| BUNGALOW NO A17 | Podiums (if any) | 0.0% |
| BUNGALOW NO A17 | Plinth | 100.0% |
| BUNGALOW NO A17 | Stilt Floor | 0.0% |
| BUNGALOW NO A17 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A17 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A17 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A17 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37.0% |
| BUNGALOW NO A17 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A17 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A18 | Excavation | 100.0% |
| BUNGALOW NO A18 | Basement (if any) | 100.0% |
| BUNGALOW NO A18 | Podiums (if any) | 0.0% |
| BUNGALOW NO A18 | Plinth | 100.0% |
| BUNGALOW NO A18 | Stilt Floor | 0.0% |
| BUNGALOW NO A18 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A18 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A18 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A18 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37.0% |
| BUNGALOW NO A18 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A18 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A19 | Excavation | 100.0% |
| BUNGALOW NO A19 | Basement (if any) | 100.0% |
| BUNGALOW NO A19 | Podiums (if any) | 0.0% |
| BUNGALOW NO A19 | Plinth | 100.0% |
| BUNGALOW NO A19 | Stilt Floor | 0.0% |
| BUNGALOW NO A19 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A19 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A19 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A19 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37.0% |
| BUNGALOW NO A19 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A19 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A20 | Excavation | 100.0% |
| BUNGALOW NO A20 | Basement (if any) | 100.0% |
| BUNGALOW NO A20 | Podiums (if any) | 0.0% |
| BUNGALOW NO A20 | Plinth | 100.0% |
| BUNGALOW NO A20 | Stilt Floor | 0.0% |
| BUNGALOW NO A20 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A20 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A20 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A20 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37.0% |
| BUNGALOW NO A20 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A20 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A21 | Excavation | 100.0% |
| BUNGALOW NO A21 | Basement (if any) | 100.0% |
| BUNGALOW NO A21 | Podiums (if any) | 0.0% |
| BUNGALOW NO A21 | Plinth | 100.0% |
| BUNGALOW NO A21 | Stilt Floor | 0.0% |
| BUNGALOW NO A21 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A21 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A21 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A21 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A21 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A21 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A22 | Excavation | 100.0% |
| BUNGALOW NO A22 | Basement (if any) | 100.0% |
| BUNGALOW NO A22 | Podiums (if any) | 0.0% |
| BUNGALOW NO A22 | Plinth | 100.0% |
| BUNGALOW NO A22 | Stilt Floor | 0.0% |
| BUNGALOW NO A22 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A22 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A22 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A22 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A22 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A22 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A23 | Excavation | 100.0% |
| BUNGALOW NO A23 | Basement (if any) | 100.0% |
| BUNGALOW NO A23 | Podiums (if any) | 0.0% |
| BUNGALOW NO A23 | Plinth | 100.0% |
| BUNGALOW NO A23 | Stilt Floor | 0.0% |
| BUNGALOW NO A23 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A23 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A23 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A23 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A23 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A23 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A24 | Excavation | 100.0% |
| BUNGALOW NO A24 | Basement (if any) | 100.0% |
| BUNGALOW NO A24 | Podiums (if any) | 0.0% |
| BUNGALOW NO A24 | Plinth | 100.0% |
| BUNGALOW NO A24 | Stilt Floor | 0.0% |
| BUNGALOW NO A24 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A24 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A24 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A24 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A24 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A24 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1000.0% |
| BUNGALOW NO A25 | Excavation | 100.0% |
| BUNGALOW NO A25 | Basement (if any) | 100.0% |
| BUNGALOW NO A25 | Podiums (if any) | 0.0% |
| BUNGALOW NO A25 | Plinth | 100.0% |
| BUNGALOW NO A25 | Stilt Floor | 0.0% |
| BUNGALOW NO A25 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A25 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A25 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A25 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A25 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A25 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A26 | Excavation | 100.0% |
| BUNGALOW NO A26 | Basement (if any) | 100.0% |
| BUNGALOW NO A26 | Podiums (if any) | 0.0% |
| BUNGALOW NO A26 | Plinth | 100.0% |
| BUNGALOW NO A26 | Stilt Floor | 0.0% |
| BUNGALOW NO A26 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A26 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A26 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A26 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A26 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A26 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A27 | Excavation | 100.0% |
| BUNGALOW NO A27 | Basement (if any) | 100.0% |
| BUNGALOW NO A27 | Podiums (if any) | 0.0% |
| BUNGALOW NO A27 | Plinth | 100.0% |
| BUNGALOW NO A27 | Stilt Floor | 0.0% |
| BUNGALOW NO A27 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A27 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A27 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A27 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A27 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A27 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A28 | Excavation | 100.0% |
| BUNGALOW NO A28 | Basement (if any) | 100.0% |
| BUNGALOW NO A28 | Podiums (if any) | 0.0% |
| BUNGALOW NO A28 | Plinth | 100.0% |
| BUNGALOW NO A28 | Stilt Floor | 0.0% |
| BUNGALOW NO A28 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A28 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A28 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A28 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A28 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A28 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A29 | Excavation | 100.0% |
| BUNGALOW NO A29 | Basement (if any) | 100.0% |
| BUNGALOW NO A29 | Podiums (if any) | 0.0% |
| BUNGALOW NO A29 | Plinth | 100.0% |
| BUNGALOW NO A29 | Stilt Floor | 0.0% |
| BUNGALOW NO A29 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A29 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A29 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A29 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47.0% |
| BUNGALOW NO A29 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A29 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A30 | Excavation | 100.0% |
| BUNGALOW NO A30 | Basement (if any) | 100.0% |
| BUNGALOW NO A30 | Podiums (if any) | 0.0% |
| BUNGALOW NO A30 | Plinth | 100.0% |
| BUNGALOW NO A30 | Stilt Floor | 0.0% |
| BUNGALOW NO A30 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A30 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A30 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A30 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A30 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40.0% |
| BUNGALOW NO A30 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A31 | Excavation | 100.0% |
| BUNGALOW NO A31 | Basement (if any) | 100.0% |
| BUNGALOW NO A31 | Podiums (if any) | 0.0% |
| BUNGALOW NO A31 | Plinth | 100.0% |
| BUNGALOW NO A31 | Stilt Floor | 0.0% |
| BUNGALOW NO A31 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A31 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A31 | Sanitary Fittings within the flats / premises | 6.0% |
| BUNGALOW NO A31 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A31 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A31 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A32 | Excavation | 100.0% |
| BUNGALOW NO A32 | Basement (if any) | 100.0% |
| BUNGALOW NO A32 | Podiums (if any) | 0.0% |
| BUNGALOW NO A32 | Plinth | 100.0% |
| BUNGALOW NO A32 | Stilt Floor | 0.0% |
| BUNGALOW NO A32 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A32 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A32 | Sanitary Fittings within the flats / premises | 6.0% |
| BUNGALOW NO A32 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A32 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A32 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A33 | Excavation | 100.0% |
| BUNGALOW NO A33 | Basement (if any) | 100.0% |
| BUNGALOW NO A33 | Podiums (if any) | 0.0% |
| BUNGALOW NO A33 | Plinth | 100.0% |
| BUNGALOW NO A33 | Stilt Floor | 0.0% |
| BUNGALOW NO A33 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A33 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A33 | Sanitary Fittings within the flats / premises | 6.0% |
| BUNGALOW NO A33 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A33 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A33 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A34 | Excavation | 100.0% |
| BUNGALOW NO A34 | Basement (if any) | 100.0% |
| BUNGALOW NO A34 | Podiums (if any) | 0.0% |
| BUNGALOW NO A34 | Plinth | 100.0% |
| BUNGALOW NO A34 | Stilt Floor | 0.0% |
| BUNGALOW NO A34 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A34 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A34 | Sanitary Fittings within the flats / premises | 6.0% |
| BUNGALOW NO A34 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A34 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A34 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A35 | Excavation | 100.0% |
| BUNGALOW NO A35 | Basement (if any) | 100.0% |
| BUNGALOW NO A35 | Podiums (if any) | 0.0% |
| BUNGALOW NO A35 | Plinth | 100.0% |
| BUNGALOW NO A35 | Stilt Floor | 0.0% |
| BUNGALOW NO A35 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A35 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A35 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A35 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A35 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A35 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A36 | Excavation | 100.0% |
| BUNGALOW NO A36 | Basement (if any) | 100.0% |
| BUNGALOW NO A36 | Podiums (if any) | 0.0% |
| BUNGALOW NO A36 | Plinth | 100.0% |
| BUNGALOW NO A36 | Stilt Floor | 0.0% |
| BUNGALOW NO A36 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A36 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 1000.0% |
| BUNGALOW NO A36 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A36 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 1000.0% |
| BUNGALOW NO A36 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 1000.0% |
| BUNGALOW NO A36 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A37 | Excavation | 100.0% |
| BUNGALOW NO A37 | Basement (if any) | 100.0% |
| BUNGALOW NO A37 | Podiums (if any) | 0.0% |
| BUNGALOW NO A37 | Plinth | 100.0% |
| BUNGALOW NO A37 | Stilt Floor | 0.0% |
| BUNGALOW NO A37 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A37 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A37 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A37 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 26.0% |
| BUNGALOW NO A37 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A37 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A38 | Excavation | 100.0% |
| BUNGALOW NO A38 | Basement (if any) | 100.0% |
| BUNGALOW NO A38 | Podiums (if any) | 0.0% |
| BUNGALOW NO A38 | Plinth | 100.0% |
| BUNGALOW NO A38 | Stilt Floor | 0.0% |
| BUNGALOW NO A38 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A38 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A38 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A38 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A38 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A38 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A39 | Excavation | 100.0% |
| BUNGALOW NO A39 | Basement (if any) | 100.0% |
| BUNGALOW NO A39 | Podiums (if any) | 0.0% |
| BUNGALOW NO A39 | Plinth | 100.0% |
| BUNGALOW NO A39 | Stilt Floor | 0.0% |
| BUNGALOW NO A39 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A39 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A39 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A39 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 1000.0% |
| BUNGALOW NO A39 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A39 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A40 | Excavation | 100.0% |
| BUNGALOW NO A40 | Basement (if any) | 100.0% |
| BUNGALOW NO A40 | Podiums (if any) | 0.0% |
| BUNGALOW NO A40 | Plinth | 100.0% |
| BUNGALOW NO A40 | Stilt Floor | 0.0% |
| BUNGALOW NO A40 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A40 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A40 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A40 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40.0% |
| BUNGALOW NO A40 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A40 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A41 | Excavation | 100.0% |
| BUNGALOW NO A41 | Basement (if any) | 100.0% |
| BUNGALOW NO A41 | Podiums (if any) | 0.0% |
| BUNGALOW NO A41 | Plinth | 100.0% |
| BUNGALOW NO A41 | Stilt Floor | 0.0% |
| BUNGALOW NO A41 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A41 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A41 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A41 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 1000.0% |
| BUNGALOW NO A41 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A41 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A42 | Excavation | 100.0% |
| BUNGALOW NO A42 | Basement (if any) | 100.0% |
| BUNGALOW NO A42 | Podiums (if any) | 0.0% |
| BUNGALOW NO A42 | Plinth | 100.0% |
| BUNGALOW NO A42 | Stilt Floor | 0.0% |
| BUNGALOW NO A42 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A42 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A42 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A42 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A42 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A42 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A43 | Excavation | 100.0% |
| BUNGALOW NO A43 | Basement (if any) | 100.0% |
| BUNGALOW NO A43 | Podiums (if any) | 0.0% |
| BUNGALOW NO A43 | Plinth | 100.0% |
| BUNGALOW NO A43 | Stilt Floor | 0.0% |
| BUNGALOW NO A43 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A43 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A43 | Sanitary Fittings within the flats / premises | 1000.0% |
| BUNGALOW NO A43 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A43 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A43 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A44 | Excavation | 100.0% |
| BUNGALOW NO A44 | Basement (if any) | 100.0% |
| BUNGALOW NO A44 | Podiums (if any) | 0.0% |
| BUNGALOW NO A44 | Plinth | 100.0% |
| BUNGALOW NO A44 | Stilt Floor | 0.0% |
| BUNGALOW NO A44 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A44 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A44 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A44 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A44 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A44 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A45 | Excavation | 100.0% |
| BUNGALOW NO A45 | Basement (if any) | 100.0% |
| BUNGALOW NO A45 | Podiums (if any) | 0.0% |
| BUNGALOW NO A45 | Plinth | 100.0% |
| BUNGALOW NO A45 | Stilt Floor | 0.0% |
| BUNGALOW NO A45 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A45 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A45 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A45 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A45 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A45 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A46 | Excavation | 100.0% |
| BUNGALOW NO A46 | Basement (if any) | 100.0% |
| BUNGALOW NO A46 | Podiums (if any) | 0.0% |
| BUNGALOW NO A46 | Plinth | 100.0% |
| BUNGALOW NO A46 | Stilt Floor | 0.0% |
| BUNGALOW NO A46 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A46 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80.0% |
| BUNGALOW NO A46 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A46 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93.0% |
| BUNGALOW NO A46 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A46 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A47 | Excavation | 100.0% |
| BUNGALOW NO A47 | Basement (if any) | 100.0% |
| BUNGALOW NO A47 | Podiums (if any) | 0.0% |
| BUNGALOW NO A47 | Plinth | 100.0% |
| BUNGALOW NO A47 | Stilt Floor | 0.0% |
| BUNGALOW NO A47 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A47 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A47 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A47 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A47 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33.0% |
| BUNGALOW NO A47 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A48 | Excavation | 100.0% |
| BUNGALOW NO A48 | Basement (if any) | 100.0% |
| BUNGALOW NO A48 | Podiums (if any) | 0.0% |
| BUNGALOW NO A48 | Plinth | 100.0% |
| BUNGALOW NO A48 | Stilt Floor | 0.0% |
| BUNGALOW NO A48 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A48 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A48 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A48 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A48 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33.0% |
| BUNGALOW NO A48 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A49 | Excavation | 100.0% |
| BUNGALOW NO A49 | Basement (if any) | 100.0% |
| BUNGALOW NO A49 | Podiums (if any) | 0.0% |
| BUNGALOW NO A49 | Plinth | 100.0% |
| BUNGALOW NO A49 | Stilt Floor | 0.0% |
| BUNGALOW NO A49 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A49 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A49 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A49 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A49 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A49 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A50 | Excavation | 100.0% |
| BUNGALOW NO A50 | Basement (if any) | 100.0% |
| BUNGALOW NO A50 | Podiums (if any) | 0.0% |
| BUNGALOW NO A50 | Plinth | 100.0% |
| BUNGALOW NO A50 | Stilt Floor | 0.0% |
| BUNGALOW NO A50 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A50 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A50 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A50 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A50 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A50 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A51 | Excavation | 100.0% |
| BUNGALOW NO A51 | Basement (if any) | 100.0% |
| BUNGALOW NO A51 | Podiums (if any) | 0.0% |
| BUNGALOW NO A51 | Plinth | 100.0% |
| BUNGALOW NO A51 | Stilt Floor | 0.0% |
| BUNGALOW NO A51 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A51 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A51 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A51 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A51 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A51 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A52 | Excavation | 100.0% |
| BUNGALOW NO A52 | Basement (if any) | 100.0% |
| BUNGALOW NO A52 | Podiums (if any) | 0.0% |
| BUNGALOW NO A52 | Plinth | 100.0% |
| BUNGALOW NO A52 | Stilt Floor | 0.0% |
| BUNGALOW NO A52 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A52 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A52 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A52 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A52 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A52 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A53 | Excavation | 100.0% |
| BUNGALOW NO A53 | Basement (if any) | 100.0% |
| BUNGALOW NO A53 | Podiums (if any) | 0.0% |
| BUNGALOW NO A53 | Plinth | 100.0% |
| BUNGALOW NO A53 | Stilt Floor | 0.0% |
| BUNGALOW NO A53 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A53 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A53 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A53 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A53 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A53 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A54 | Excavation | 100.0% |
| BUNGALOW NO A54 | Basement (if any) | 100.0% |
| BUNGALOW NO A54 | Podiums (if any) | 0.0% |
| BUNGALOW NO A54 | Plinth | 100.0% |
| BUNGALOW NO A54 | Stilt Floor | 0.0% |
| BUNGALOW NO A54 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A54 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A54 | Sanitary Fittings within the flats / premises | 59.0% |
| BUNGALOW NO A54 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 79.0% |
| BUNGALOW NO A54 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A54 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A55 | Excavation | 100.0% |
| BUNGALOW NO A55 | Basement (if any) | 100.0% |
| BUNGALOW NO A55 | Podiums (if any) | 0.0% |
| BUNGALOW NO A55 | Plinth | 100.0% |
| BUNGALOW NO A55 | Stilt Floor | 0.0% |
| BUNGALOW NO A55 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A55 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A55 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A55 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80.0% |
| BUNGALOW NO A55 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A55 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A56 | Excavation | 100.0% |
| BUNGALOW NO A56 | Basement (if any) | 100.0% |
| BUNGALOW NO A56 | Podiums (if any) | 0.0% |
| BUNGALOW NO A56 | Plinth | 100.0% |
| BUNGALOW NO A56 | Stilt Floor | 0.0% |
| BUNGALOW NO A56 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A56 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A56 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A56 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A56 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A56 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A57 | Excavation | 100.0% |
| BUNGALOW NO A57 | Basement (if any) | 100.0% |
| BUNGALOW NO A57 | Podiums (if any) | 0.0% |
| BUNGALOW NO A57 | Plinth | 100.0% |
| BUNGALOW NO A57 | Stilt Floor | 0.0% |
| BUNGALOW NO A57 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A57 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A57 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A57 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A57 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A57 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A58 | Excavation | 100.0% |
| BUNGALOW NO A58 | Basement (if any) | 100.0% |
| BUNGALOW NO A58 | Podiums (if any) | 0.0% |
| BUNGALOW NO A58 | Plinth | 100.0% |
| BUNGALOW NO A58 | Stilt Floor | 0.0% |
| BUNGALOW NO A58 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A58 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A58 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A58 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A58 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A58 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A59 | Excavation | 100.0% |
| BUNGALOW NO A59 | Basement (if any) | 100.0% |
| BUNGALOW NO A59 | Podiums (if any) | 0.0% |
| BUNGALOW NO A59 | Plinth | 100.0% |
| BUNGALOW NO A59 | Stilt Floor | 0.0% |
| BUNGALOW NO A59 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A59 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A59 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A59 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 53.0% |
| BUNGALOW NO A59 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A59 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A60 | Excavation | 100.0% |
| BUNGALOW NO A60 | Basement (if any) | 100.0% |
| BUNGALOW NO A60 | Podiums (if any) | 0.0% |
| BUNGALOW NO A60 | Plinth | 100.0% |
| BUNGALOW NO A60 | Stilt Floor | 0.0% |
| BUNGALOW NO A60 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A60 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A60 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A60 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A60 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A60 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A61 | Excavation | 100.0% |
| BUNGALOW NO A61 | Basement (if any) | 100.0% |
| BUNGALOW NO A61 | Podiums (if any) | 0.0% |
| BUNGALOW NO A61 | Plinth | 100.0% |
| BUNGALOW NO A61 | Stilt Floor | 0.0% |
| BUNGALOW NO A61 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A61 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 48.0% |
| BUNGALOW NO A61 | Sanitary Fittings within the flats / premises | 58.0% |
| BUNGALOW NO A61 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 43.0% |
| BUNGALOW NO A61 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A61 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A62 | Excavation | 100.0% |
| BUNGALOW NO A62 | Basement (if any) | 100.0% |
| BUNGALOW NO A62 | Podiums (if any) | 0.0% |
| BUNGALOW NO A62 | Plinth | 100.0% |
| BUNGALOW NO A62 | Stilt Floor | 0.0% |
| BUNGALOW NO A62 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A62 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A62 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A62 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A62 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A62 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A63 | Excavation | 100.0% |
| BUNGALOW NO A63 | Basement (if any) | 100.0% |
| BUNGALOW NO A63 | Podiums (if any) | 0.0% |
| BUNGALOW NO A63 | Plinth | 100.0% |
| BUNGALOW NO A63 | Stilt Floor | 0.0% |
| BUNGALOW NO A63 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A63 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A63 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A63 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A63 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 900.0% |
| BUNGALOW NO A63 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60.0% |
| BUNGALOW NO A64 | Excavation | 100.0% |
| BUNGALOW NO A64 | Basement (if any) | 100.0% |
| BUNGALOW NO A64 | Podiums (if any) | 0.0% |
| BUNGALOW NO A64 | Plinth | 100.0% |
| BUNGALOW NO A64 | Stilt Floor | 0.0% |
| BUNGALOW NO A64 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A64 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A64 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A64 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A64 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A64 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A65 | Excavation | 100.0% |
| BUNGALOW NO A65 | Basement (if any) | 100.0% |
| BUNGALOW NO A65 | Podiums (if any) | 0.0% |
| BUNGALOW NO A65 | Plinth | 100.0% |
| BUNGALOW NO A65 | Stilt Floor | 0.0% |
| BUNGALOW NO A65 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A65 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60.0% |
| BUNGALOW NO A65 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A65 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47.0% |
| BUNGALOW NO A65 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40.0% |
| BUNGALOW NO A65 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A66 | Excavation | 100.0% |
| BUNGALOW NO A66 | Basement (if any) | 100.0% |
| BUNGALOW NO A66 | Podiums (if any) | 0.0% |
| BUNGALOW NO A66 | Plinth | 100.0% |
| BUNGALOW NO A66 | Stilt Floor | 0.0% |
| BUNGALOW NO A66 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A66 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A66 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A66 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A66 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33.0% |
| BUNGALOW NO A66 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A67 | Excavation | 100.0% |
| BUNGALOW NO A67 | Basement (if any) | 100.0% |
| BUNGALOW NO A67 | Podiums (if any) | 0.0% |
| BUNGALOW NO A67 | Plinth | 100.0% |
| BUNGALOW NO A67 | Stilt Floor | 0.0% |
| BUNGALOW NO A67 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A67 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A67 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A67 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A67 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A67 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A68 | Excavation | 100.0% |
| BUNGALOW NO A68 | Basement (if any) | 100.0% |
| BUNGALOW NO A68 | Podiums (if any) | 0.0% |
| BUNGALOW NO A68 | Plinth | 100.0% |
| BUNGALOW NO A68 | Stilt Floor | 0.0% |
| BUNGALOW NO A68 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A68 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A68 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A68 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A68 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A68 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A69 | Excavation | 100.0% |
| BUNGALOW NO A69 | Basement (if any) | 100.0% |
| BUNGALOW NO A69 | Podiums (if any) | 0.0% |
| BUNGALOW NO A69 | Plinth | 100.0% |
| BUNGALOW NO A69 | Stilt Floor | 0.0% |
| BUNGALOW NO A69 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A69 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A69 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A69 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A69 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A69 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A70 | Excavation | 100.0% |
| BUNGALOW NO A70 | Basement (if any) | 100.0% |
| BUNGALOW NO A70 | Podiums (if any) | 0.0% |
| BUNGALOW NO A70 | Plinth | 100.0% |
| BUNGALOW NO A70 | Stilt Floor | 0.0% |
| BUNGALOW NO A70 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A70 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A70 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A70 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A70 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 1000.0% |
| BUNGALOW NO A70 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A71 | Excavation | 100.0% |
| BUNGALOW NO A71 | Basement (if any) | 100.0% |
| BUNGALOW NO A71 | Podiums (if any) | 0.0% |
| BUNGALOW NO A71 | Plinth | 100.0% |
| BUNGALOW NO A71 | Stilt Floor | 0.0% |
| BUNGALOW NO A71 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A71 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A71 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A71 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A71 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A71 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A72 | Excavation | 100.0% |
| BUNGALOW NO A72 | Basement (if any) | 100.0% |
| BUNGALOW NO A72 | Podiums (if any) | 0.0% |
| BUNGALOW NO A72 | Plinth | 100.0% |
| BUNGALOW NO A72 | Stilt Floor | 0.0% |
| BUNGALOW NO A72 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A72 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A72 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A72 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A72 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A72 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A73 | Excavation | 100.0% |
| BUNGALOW NO A73 | Basement (if any) | 100.0% |
| BUNGALOW NO A73 | Podiums (if any) | 0.0% |
| BUNGALOW NO A73 | Plinth | 100.0% |
| BUNGALOW NO A73 | Stilt Floor | 0.0% |
| BUNGALOW NO A73 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A73 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A73 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A73 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A73 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A73 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A74 | Excavation | 100.0% |
| BUNGALOW NO A74 | Basement (if any) | 100.0% |
| BUNGALOW NO A74 | Podiums (if any) | 0.0% |
| BUNGALOW NO A74 | Plinth | 100.0% |
| BUNGALOW NO A74 | Stilt Floor | 0.0% |
| BUNGALOW NO A74 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A74 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A74 | Sanitary Fittings within the flats / premises | 50.0% |
| BUNGALOW NO A74 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A74 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60.0% |
| BUNGALOW NO A74 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A75 | Excavation | 100.0% |
| BUNGALOW NO A75 | Basement (if any) | 100.0% |
| BUNGALOW NO A75 | Podiums (if any) | 0.0% |
| BUNGALOW NO A75 | Plinth | 100.0% |
| BUNGALOW NO A75 | Stilt Floor | 0.0% |
| BUNGALOW NO A75 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A75 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A75 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A75 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A75 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A75 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A76 | Excavation | 100.0% |
| BUNGALOW NO A76 | Basement (if any) | 100.0% |
| BUNGALOW NO A76 | Podiums (if any) | 0.0% |
| BUNGALOW NO A76 | Plinth | 100.0% |
| BUNGALOW NO A76 | Stilt Floor | 0.0% |
| BUNGALOW NO A76 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A76 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55.0% |
| BUNGALOW NO A76 | Sanitary Fittings within the flats / premises | 59.0% |
| BUNGALOW NO A76 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 37.0% |
| BUNGALOW NO A76 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A76 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A77 | Excavation | 100.0% |
| BUNGALOW NO A77 | Basement (if any) | 100.0% |
| BUNGALOW NO A77 | Podiums (if any) | 0.0% |
| BUNGALOW NO A77 | Plinth | 100.0% |
| BUNGALOW NO A77 | Stilt Floor | 0.0% |
| BUNGALOW NO A77 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A77 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A77 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A77 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A77 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A77 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A78 | Excavation | 100.0% |
| BUNGALOW NO A78 | Basement (if any) | 100.0% |
| BUNGALOW NO A78 | Podiums (if any) | 0.0% |
| BUNGALOW NO A78 | Plinth | 100.0% |
| BUNGALOW NO A78 | Stilt Floor | 0.0% |
| BUNGALOW NO A78 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A78 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A78 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A78 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A78 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A78 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A262 | Excavation | 100.0% |
| BUNGALOW NO A262 | Basement (if any) | 100.0% |
| BUNGALOW NO A262 | Podiums (if any) | 0.0% |
| BUNGALOW NO A262 | Plinth | 100.0% |
| BUNGALOW NO A262 | Stilt Floor | 100.0% |
| BUNGALOW NO A262 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A262 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A262 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A262 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47.0% |
| BUNGALOW NO A262 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A262 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A263 | Excavation | 100.0% |
| BUNGALOW NO A263 | Basement (if any) | 100.0% |
| BUNGALOW NO A263 | Podiums (if any) | 0.0% |
| BUNGALOW NO A263 | Plinth | 100.0% |
| BUNGALOW NO A263 | Stilt Floor | 100.0% |
| BUNGALOW NO A263 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A263 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A263 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A263 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A263 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A263 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A264 | Excavation | 100.0% |
| BUNGALOW NO A264 | Basement (if any) | 100.0% |
| BUNGALOW NO A264 | Podiums (if any) | 0.0% |
| BUNGALOW NO A264 | Plinth | 100.0% |
| BUNGALOW NO A264 | Stilt Floor | 100.0% |
| BUNGALOW NO A264 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A264 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A264 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A264 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A264 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A264 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A265 | Excavation | 100.0% |
| BUNGALOW NO A265 | Basement (if any) | 100.0% |
| BUNGALOW NO A265 | Podiums (if any) | 0.0% |
| BUNGALOW NO A265 | Plinth | 100.0% |
| BUNGALOW NO A265 | Stilt Floor | 0.0% |
| BUNGALOW NO A265 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A265 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A265 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A265 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A265 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A265 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A266 | Excavation | 100.0% |
| BUNGALOW NO A266 | Basement (if any) | 100.0% |
| BUNGALOW NO A266 | Podiums (if any) | 0.0% |
| BUNGALOW NO A266 | Plinth | 100.0% |
| BUNGALOW NO A266 | Stilt Floor | 0.0% |
| BUNGALOW NO A266 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A266 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A266 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A266 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A266 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A266 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A267 | Excavation | 100.0% |
| BUNGALOW NO A267 | Basement (if any) | 100.0% |
| BUNGALOW NO A267 | Podiums (if any) | 0.0% |
| BUNGALOW NO A267 | Plinth | 100.0% |
| BUNGALOW NO A267 | Stilt Floor | 0.0% |
| BUNGALOW NO A267 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A267 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A267 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A267 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A267 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A267 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A268 | Excavation | 100.0% |
| BUNGALOW NO A268 | Basement (if any) | 100.0% |
| BUNGALOW NO A268 | Podiums (if any) | 0.0% |
| BUNGALOW NO A268 | Plinth | 100.0% |
| BUNGALOW NO A268 | Stilt Floor | 0.0% |
| BUNGALOW NO A268 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A268 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A268 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A268 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A268 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A268 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A269 | Excavation | 100.0% |
| BUNGALOW NO A269 | Basement (if any) | 100.0% |
| BUNGALOW NO A269 | Podiums (if any) | 0.0% |
| BUNGALOW NO A269 | Plinth | 100.0% |
| BUNGALOW NO A269 | Stilt Floor | 0.0% |
| BUNGALOW NO A269 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A269 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A269 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A269 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A269 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A269 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A270 | Excavation | 100.0% |
| BUNGALOW NO A270 | Basement (if any) | 100.0% |
| BUNGALOW NO A270 | Podiums (if any) | 0.0% |
| BUNGALOW NO A270 | Plinth | 100.0% |
| BUNGALOW NO A270 | Stilt Floor | 0.0% |
| BUNGALOW NO A270 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A270 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A270 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A270 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A270 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A270 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A271 | Excavation | 100.0% |
| BUNGALOW NO A271 | Basement (if any) | 100.0% |
| BUNGALOW NO A271 | Podiums (if any) | 0.0% |
| BUNGALOW NO A271 | Plinth | 100.0% |
| BUNGALOW NO A271 | Stilt Floor | 0.0% |
| BUNGALOW NO A271 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A271 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A271 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A271 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A271 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A271 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 1000.0% |
| BUNGALOW NO A272 | Excavation | 100.0% |
| BUNGALOW NO A272 | Basement (if any) | 100.0% |
| BUNGALOW NO A272 | Podiums (if any) | 0.0% |
| BUNGALOW NO A272 | Plinth | 100.0% |
| BUNGALOW NO A272 | Stilt Floor | 0.0% |
| BUNGALOW NO A272 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A272 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A272 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A272 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A272 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A272 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A273 | Excavation | 100.0% |
| BUNGALOW NO A273 | Basement (if any) | 100.0% |
| BUNGALOW NO A273 | Podiums (if any) | 0.0% |
| BUNGALOW NO A273 | Plinth | 100.0% |
| BUNGALOW NO A273 | Stilt Floor | 0.0% |
| BUNGALOW NO A273 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A273 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A273 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A273 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A273 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 8.0% |
| BUNGALOW NO A273 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A274 | Excavation | 100.0% |
| BUNGALOW NO A274 | Basement (if any) | 100.0% |
| BUNGALOW NO A274 | Podiums (if any) | 0.0% |
| BUNGALOW NO A274 | Plinth | 100.0% |
| BUNGALOW NO A274 | Stilt Floor | 0.0% |
| BUNGALOW NO A274 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A274 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A274 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A274 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A274 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A274 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A275 | Excavation | 100.0% |
| BUNGALOW NO A275 | Basement (if any) | 100.0% |
| BUNGALOW NO A275 | Podiums (if any) | 0.0% |
| BUNGALOW NO A275 | Plinth | 100.0% |
| BUNGALOW NO A275 | Stilt Floor | 0.0% |
| BUNGALOW NO A275 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A275 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A275 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A275 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A275 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A275 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A276 | Excavation | 100.0% |
| BUNGALOW NO A276 | Basement (if any) | 100.0% |
| BUNGALOW NO A276 | Podiums (if any) | 0.0% |
| BUNGALOW NO A276 | Plinth | 100.0% |
| BUNGALOW NO A276 | Stilt Floor | 0.0% |
| BUNGALOW NO A276 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A276 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 23.0% |
| BUNGALOW NO A276 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A276 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A276 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 17.0% |
| BUNGALOW NO A276 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A277 | Excavation | 100.0% |
| BUNGALOW NO A277 | Basement (if any) | 100.0% |
| BUNGALOW NO A277 | Podiums (if any) | 0.0% |
| BUNGALOW NO A277 | Plinth | 100.0% |
| BUNGALOW NO A277 | Stilt Floor | 0.0% |
| BUNGALOW NO A277 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A277 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A277 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A277 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A277 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A277 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A278 | Excavation | 100.0% |
| BUNGALOW NO A278 | Basement (if any) | 100.0% |
| BUNGALOW NO A278 | Podiums (if any) | 0.0% |
| BUNGALOW NO A278 | Plinth | 100.0% |
| BUNGALOW NO A278 | Stilt Floor | 0.0% |
| BUNGALOW NO A278 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A278 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A278 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A278 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A278 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A278 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A279 | Excavation | 100.0% |
| BUNGALOW NO A279 | Basement (if any) | 100.0% |
| BUNGALOW NO A279 | Podiums (if any) | 0.0% |
| BUNGALOW NO A279 | Plinth | 100.0% |
| BUNGALOW NO A279 | Stilt Floor | 0.0% |
| BUNGALOW NO A279 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A279 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A279 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A279 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A279 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 17.0% |
| BUNGALOW NO A279 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A280 | Excavation | 100.0% |
| BUNGALOW NO A280 | Basement (if any) | 100.0% |
| BUNGALOW NO A280 | Podiums (if any) | 0.0% |
| BUNGALOW NO A280 | Plinth | 100.0% |
| BUNGALOW NO A280 | Stilt Floor | 0.0% |
| BUNGALOW NO A280 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A280 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A280 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A280 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A280 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 17.0% |
| BUNGALOW NO A280 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A281 | Excavation | 100.0% |
| BUNGALOW NO A281 | Basement (if any) | 100.0% |
| BUNGALOW NO A281 | Podiums (if any) | 0.0% |
| BUNGALOW NO A281 | Plinth | 100.0% |
| BUNGALOW NO A281 | Stilt Floor | 0.0% |
| BUNGALOW NO A281 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A281 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A281 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A281 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A281 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 25.0% |
| BUNGALOW NO A281 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A282 | Excavation | 100.0% |
| BUNGALOW NO A282 | Basement (if any) | 100.0% |
| BUNGALOW NO A282 | Podiums (if any) | 0.0% |
| BUNGALOW NO A282 | Plinth | 100.0% |
| BUNGALOW NO A282 | Stilt Floor | 0.0% |
| BUNGALOW NO A282 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A282 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A282 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A282 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A282 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A282 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A283 | Excavation | 100.0% |
| BUNGALOW NO A283 | Basement (if any) | 100.0% |
| BUNGALOW NO A283 | Podiums (if any) | 0.0% |
| BUNGALOW NO A283 | Plinth | 100.0% |
| BUNGALOW NO A283 | Stilt Floor | 0.0% |
| BUNGALOW NO A283 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A283 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A283 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A283 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A283 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A283 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A284 | Excavation | 100.0% |
| BUNGALOW NO A284 | Basement (if any) | 100.0% |
| BUNGALOW NO A284 | Podiums (if any) | 0.0% |
| BUNGALOW NO A284 | Plinth | 100.0% |
| BUNGALOW NO A284 | Stilt Floor | 0.0% |
| BUNGALOW NO A284 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A284 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A284 | Sanitary Fittings within the flats / premises | 18.0% |
| BUNGALOW NO A284 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A284 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A284 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A285 | Excavation | 100.0% |
| BUNGALOW NO A285 | Basement (if any) | 100.0% |
| BUNGALOW NO A285 | Podiums (if any) | 0.0% |
| BUNGALOW NO A285 | Plinth | 100.0% |
| BUNGALOW NO A285 | Stilt Floor | 0.0% |
| BUNGALOW NO A285 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A285 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15.0% |
| BUNGALOW NO A285 | Sanitary Fittings within the flats / premises | 9.0% |
| BUNGALOW NO A285 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A285 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 17.0% |
| BUNGALOW NO A285 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A286 | Excavation | 100.0% |
| BUNGALOW NO A286 | Basement (if any) | 100.0% |
| BUNGALOW NO A286 | Podiums (if any) | 0.0% |
| BUNGALOW NO A286 | Plinth | 100.0% |
| BUNGALOW NO A286 | Stilt Floor | 0.0% |
| BUNGALOW NO A286 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A286 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A286 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A286 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A286 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A286 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A287 | Excavation | 100.0% |
| BUNGALOW NO A287 | Basement (if any) | 100.0% |
| BUNGALOW NO A287 | Podiums (if any) | 0.0% |
| BUNGALOW NO A287 | Plinth | 100.0% |
| BUNGALOW NO A287 | Stilt Floor | 0.0% |
| BUNGALOW NO A287 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A287 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A287 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A287 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A287 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 33.0% |
| BUNGALOW NO A287 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A288 | Excavation | 100.0% |
| BUNGALOW NO A288 | Basement (if any) | 100.0% |
| BUNGALOW NO A288 | Podiums (if any) | 0.0% |
| BUNGALOW NO A288 | Plinth | 100.0% |
| BUNGALOW NO A288 | Stilt Floor | 0.0% |
| BUNGALOW NO A288 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A288 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A288 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A288 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A288 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A288 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A289 | Excavation | 100.0% |
| BUNGALOW NO A289 | Basement (if any) | 100.0% |
| BUNGALOW NO A289 | Podiums (if any) | 0.0% |
| BUNGALOW NO A289 | Plinth | 100.0% |
| BUNGALOW NO A289 | Stilt Floor | 0.0% |
| BUNGALOW NO A289 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A289 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 23.0% |
| BUNGALOW NO A289 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A289 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A289 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A289 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A290 | Excavation | 100.0% |
| BUNGALOW NO A290 | Basement (if any) | 100.0% |
| BUNGALOW NO A290 | Podiums (if any) | 0.0% |
| BUNGALOW NO A290 | Plinth | 100.0% |
| BUNGALOW NO A290 | Stilt Floor | 0.0% |
| BUNGALOW NO A290 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A290 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 23.0% |
| BUNGALOW NO A290 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A290 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A290 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A290 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A291 | Excavation | 100.0% |
| BUNGALOW NO A291 | Basement (if any) | 100.0% |
| BUNGALOW NO A291 | Podiums (if any) | 0.0% |
| BUNGALOW NO A291 | Plinth | 100.0% |
| BUNGALOW NO A291 | Stilt Floor | 0.0% |
| BUNGALOW NO A291 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A291 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A291 | Sanitary Fittings within the flats / premises | 190.0% |
| BUNGALOW NO A291 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A291 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A291 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50.0% |
| BUNGALOW NO A292 | Excavation | 100.0% |
| BUNGALOW NO A292 | Basement (if any) | 100.0% |
| BUNGALOW NO A292 | Podiums (if any) | 0.0% |
| BUNGALOW NO A292 | Plinth | 100.0% |
| BUNGALOW NO A292 | Stilt Floor | 0.0% |
| BUNGALOW NO A292 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A292 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A292 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A292 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A292 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A292 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A293 | Excavation | 100.0% |
| BUNGALOW NO A293 | Basement (if any) | 100.0% |
| BUNGALOW NO A293 | Podiums (if any) | 0.0% |
| BUNGALOW NO A293 | Plinth | 100.0% |
| BUNGALOW NO A293 | Stilt Floor | 0.0% |
| BUNGALOW NO A293 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A293 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A293 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A293 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 1000.0% |
| BUNGALOW NO A293 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A293 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 85.0% |
| BUNGALOW NO A294 | Excavation | 100.0% |
| BUNGALOW NO A294 | Basement (if any) | 100.0% |
| BUNGALOW NO A294 | Podiums (if any) | 0.0% |
| BUNGALOW NO A294 | Plinth | 100.0% |
| BUNGALOW NO A294 | Stilt Floor | 0.0% |
| BUNGALOW NO A294 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A294 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A294 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A294 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A294 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A294 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 80.0% |
| BUNGALOW NO A295 | Excavation | 100.0% |
| BUNGALOW NO A295 | Basement (if any) | 100.0% |
| BUNGALOW NO A295 | Podiums (if any) | 0.0% |
| BUNGALOW NO A295 | Plinth | 100.0% |
| BUNGALOW NO A295 | Stilt Floor | 0.0% |
| BUNGALOW NO A295 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A295 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A295 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A295 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A295 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A295 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A296 | Excavation | 100.0% |
| BUNGALOW NO A296 | Basement (if any) | 100.0% |
| BUNGALOW NO A296 | Podiums (if any) | 0.0% |
| BUNGALOW NO A296 | Plinth | 100.0% |
| BUNGALOW NO A296 | Stilt Floor | 0.0% |
| BUNGALOW NO A296 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A296 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A296 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A296 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A296 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A296 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A297 | Excavation | 100.0% |
| BUNGALOW NO A297 | Basement (if any) | 100.0% |
| BUNGALOW NO A297 | Podiums (if any) | 0.0% |
| BUNGALOW NO A297 | Plinth | 100.0% |
| BUNGALOW NO A297 | Stilt Floor | 0.0% |
| BUNGALOW NO A297 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A297 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A297 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A297 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A297 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A297 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A298 | Excavation | 100.0% |
| BUNGALOW NO A298 | Basement (if any) | 100.0% |
| BUNGALOW NO A298 | Podiums (if any) | 0.0% |
| BUNGALOW NO A298 | Plinth | 100.0% |
| BUNGALOW NO A298 | Stilt Floor | 0.0% |
| BUNGALOW NO A298 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A298 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A298 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A298 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A298 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80.0% |
| BUNGALOW NO A298 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A299 | Excavation | 100.0% |
| BUNGALOW NO A299 | Basement (if any) | 100.0% |
| BUNGALOW NO A299 | Podiums (if any) | 0.0% |
| BUNGALOW NO A299 | Plinth | 100.0% |
| BUNGALOW NO A299 | Stilt Floor | 0.0% |
| BUNGALOW NO A299 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A299 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A299 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A299 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A299 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A299 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A300 | Excavation | 100.0% |
| BUNGALOW NO A300 | Basement (if any) | 100.0% |
| BUNGALOW NO A300 | Podiums (if any) | 0.0% |
| BUNGALOW NO A300 | Plinth | 100.0% |
| BUNGALOW NO A300 | Stilt Floor | 0.0% |
| BUNGALOW NO A300 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A300 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A300 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A300 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A300 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A300 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A301 | Excavation | 100.0% |
| BUNGALOW NO A301 | Basement (if any) | 100.0% |
| BUNGALOW NO A301 | Podiums (if any) | 0.0% |
| BUNGALOW NO A301 | Plinth | 100.0% |
| BUNGALOW NO A301 | Stilt Floor | 0.0% |
| BUNGALOW NO A301 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A301 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A301 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A301 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A301 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A301 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A302 | Excavation | 100.0% |
| BUNGALOW NO A302 | Basement (if any) | 100.0% |
| BUNGALOW NO A302 | Podiums (if any) | 0.0% |
| BUNGALOW NO A302 | Plinth | 100.0% |
| BUNGALOW NO A302 | Stilt Floor | 0.0% |
| BUNGALOW NO A302 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A302 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A302 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A302 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A302 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A302 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A303 | Excavation | 100.0% |
| BUNGALOW NO A303 | Basement (if any) | 0.0% |
| BUNGALOW NO A303 | Podiums (if any) | 0.0% |
| BUNGALOW NO A303 | Plinth | 0.0% |
| BUNGALOW NO A303 | Stilt Floor | 0.0% |
| BUNGALOW NO A303 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A303 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A303 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A303 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A303 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A303 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A304 | Excavation | 100.0% |
| BUNGALOW NO A304 | Basement (if any) | 100.0% |
| BUNGALOW NO A304 | Podiums (if any) | 0.0% |
| BUNGALOW NO A304 | Plinth | 100.0% |
| BUNGALOW NO A304 | Stilt Floor | 0.0% |
| BUNGALOW NO A304 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A304 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A304 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A304 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A304 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A304 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A305 | Excavation | 100.0% |
| BUNGALOW NO A305 | Basement (if any) | 100.0% |
| BUNGALOW NO A305 | Podiums (if any) | 0.0% |
| BUNGALOW NO A305 | Plinth | 100.0% |
| BUNGALOW NO A305 | Stilt Floor | 0.0% |
| BUNGALOW NO A305 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A305 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A305 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A305 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A305 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A305 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A306 | Excavation | 0.0% |
| BUNGALOW NO A306 | Basement (if any) | 0.0% |
| BUNGALOW NO A306 | Podiums (if any) | 0.0% |
| BUNGALOW NO A306 | Plinth | 0.0% |
| BUNGALOW NO A306 | Stilt Floor | 0.0% |
| BUNGALOW NO A306 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A306 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A306 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A306 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A306 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A306 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A307 | Excavation | 100.0% |
| BUNGALOW NO A307 | Basement (if any) | 100.0% |
| BUNGALOW NO A307 | Podiums (if any) | 0.0% |
| BUNGALOW NO A307 | Plinth | 100.0% |
| BUNGALOW NO A307 | Stilt Floor | 0.0% |
| BUNGALOW NO A307 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A307 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A307 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A307 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A307 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A307 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A308 | Excavation | 0.0% |
| BUNGALOW NO A308 | Basement (if any) | 0.0% |
| BUNGALOW NO A308 | Podiums (if any) | 0.0% |
| BUNGALOW NO A308 | Plinth | 0.0% |
| BUNGALOW NO A308 | Stilt Floor | 0.0% |
| BUNGALOW NO A308 | Slabs of Super Structure | 0.0% |
| BUNGALOW NO A308 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A308 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A308 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A308 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A308 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A309 | Excavation | 100.0% |
| BUNGALOW NO A309 | Basement (if any) | 100.0% |
| BUNGALOW NO A309 | Podiums (if any) | 0.0% |
| BUNGALOW NO A309 | Plinth | 100.0% |
| BUNGALOW NO A309 | Stilt Floor | 0.0% |
| BUNGALOW NO A309 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A309 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A309 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A309 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A309 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A309 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A310 | Excavation | 100.0% |
| BUNGALOW NO A310 | Basement (if any) | 100.0% |
| BUNGALOW NO A310 | Podiums (if any) | 0.0% |
| BUNGALOW NO A310 | Plinth | 100.0% |
| BUNGALOW NO A310 | Stilt Floor | 0.0% |
| BUNGALOW NO A310 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A310 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 42.0% |
| BUNGALOW NO A310 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A310 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 39.0% |
| BUNGALOW NO A310 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40.0% |
| BUNGALOW NO A310 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A311 | Excavation | 100.0% |
| BUNGALOW NO A311 | Basement (if any) | 100.0% |
| BUNGALOW NO A311 | Podiums (if any) | 0.0% |
| BUNGALOW NO A311 | Plinth | 100.0% |
| BUNGALOW NO A311 | Stilt Floor | 0.0% |
| BUNGALOW NO A311 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A311 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A311 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A311 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A311 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A311 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A312 | Excavation | 100.0% |
| BUNGALOW NO A312 | Basement (if any) | 100.0% |
| BUNGALOW NO A312 | Podiums (if any) | 0.0% |
| BUNGALOW NO A312 | Plinth | 100.0% |
| BUNGALOW NO A312 | Stilt Floor | 0.0% |
| BUNGALOW NO A312 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A312 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A312 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A312 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A312 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A312 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90.0% |
| BUNGALOW NO A313 | Excavation | 100.0% |
| BUNGALOW NO A313 | Basement (if any) | 100.0% |
| BUNGALOW NO A313 | Podiums (if any) | 0.0% |
| BUNGALOW NO A313 | Plinth | 100.0% |
| BUNGALOW NO A313 | Stilt Floor | 0.0% |
| BUNGALOW NO A313 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A313 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A313 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A313 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A313 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A313 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A314 | Excavation | 100.0% |
| BUNGALOW NO A314 | Basement (if any) | 100.0% |
| BUNGALOW NO A314 | Podiums (if any) | 0.0% |
| BUNGALOW NO A314 | Plinth | 100.0% |
| BUNGALOW NO A314 | Stilt Floor | 0.0% |
| BUNGALOW NO A314 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A314 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A314 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A314 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A314 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 17.0% |
| BUNGALOW NO A314 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A315 | Excavation | 100.0% |
| BUNGALOW NO A315 | Basement (if any) | 100.0% |
| BUNGALOW NO A315 | Podiums (if any) | 0.0% |
| BUNGALOW NO A315 | Plinth | 100.0% |
| BUNGALOW NO A315 | Stilt Floor | 0.0% |
| BUNGALOW NO A315 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A315 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A315 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A315 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 7.0% |
| BUNGALOW NO A315 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A315 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A316 | Excavation | 100.0% |
| BUNGALOW NO A316 | Basement (if any) | 100.0% |
| BUNGALOW NO A316 | Podiums (if any) | 0.0% |
| BUNGALOW NO A316 | Plinth | 100.0% |
| BUNGALOW NO A316 | Stilt Floor | 0.0% |
| BUNGALOW NO A316 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A316 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A316 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A316 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A316 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A316 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A317 | Excavation | 100.0% |
| BUNGALOW NO A317 | Basement (if any) | 100.0% |
| BUNGALOW NO A317 | Podiums (if any) | 0.0% |
| BUNGALOW NO A317 | Plinth | 100.0% |
| BUNGALOW NO A317 | Stilt Floor | 0.0% |
| BUNGALOW NO A317 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A317 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A317 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A317 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A317 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 73.0% |
| BUNGALOW NO A317 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A318 | Excavation | 100.0% |
| BUNGALOW NO A318 | Basement (if any) | 100.0% |
| BUNGALOW NO A318 | Podiums (if any) | 0.0% |
| BUNGALOW NO A318 | Plinth | 100.0% |
| BUNGALOW NO A318 | Stilt Floor | 0.0% |
| BUNGALOW NO A318 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A318 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A318 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A318 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A318 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A318 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A319 | Excavation | 100.0% |
| BUNGALOW NO A319 | Basement (if any) | 100.0% |
| BUNGALOW NO A319 | Podiums (if any) | 0.0% |
| BUNGALOW NO A319 | Plinth | 100.0% |
| BUNGALOW NO A319 | Stilt Floor | 0.0% |
| BUNGALOW NO A319 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A319 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A319 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A319 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A319 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A319 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A320 | Excavation | 100.0% |
| BUNGALOW NO A320 | Basement (if any) | 100.0% |
| BUNGALOW NO A320 | Podiums (if any) | 0.0% |
| BUNGALOW NO A320 | Plinth | 100.0% |
| BUNGALOW NO A320 | Stilt Floor | 0.0% |
| BUNGALOW NO A320 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A320 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A320 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A320 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A320 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A320 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A321 | Excavation | 100.0% |
| BUNGALOW NO A321 | Basement (if any) | 100.0% |
| BUNGALOW NO A321 | Podiums (if any) | 0.0% |
| BUNGALOW NO A321 | Plinth | 100.0% |
| BUNGALOW NO A321 | Stilt Floor | 0.0% |
| BUNGALOW NO A321 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A321 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A321 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A321 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 33.0% |
| BUNGALOW NO A321 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A321 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A322 | Excavation | 100.0% |
| BUNGALOW NO A322 | Basement (if any) | 100.0% |
| BUNGALOW NO A322 | Podiums (if any) | 0.0% |
| BUNGALOW NO A322 | Plinth | 100.0% |
| BUNGALOW NO A322 | Stilt Floor | 0.0% |
| BUNGALOW NO A322 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A322 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A322 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A322 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A322 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A322 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A323 | Excavation | 100.0% |
| BUNGALOW NO A323 | Basement (if any) | 100.0% |
| BUNGALOW NO A323 | Podiums (if any) | 0.0% |
| BUNGALOW NO A323 | Plinth | 100.0% |
| BUNGALOW NO A323 | Stilt Floor | 0.0% |
| BUNGALOW NO A323 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A323 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A323 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A323 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A323 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A323 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A324 | Excavation | 100.0% |
| BUNGALOW NO A324 | Basement (if any) | 100.0% |
| BUNGALOW NO A324 | Podiums (if any) | 0.0% |
| BUNGALOW NO A324 | Plinth | 100.0% |
| BUNGALOW NO A324 | Stilt Floor | 0.0% |
| BUNGALOW NO A324 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A324 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A324 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A324 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A324 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A324 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A325 | Excavation | 100.0% |
| BUNGALOW NO A325 | Basement (if any) | 100.0% |
| BUNGALOW NO A325 | Podiums (if any) | 0.0% |
| BUNGALOW NO A325 | Plinth | 100.0% |
| BUNGALOW NO A325 | Stilt Floor | 0.0% |
| BUNGALOW NO A325 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A325 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A325 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A325 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A325 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A325 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A326 | Excavation | 100.0% |
| BUNGALOW NO A326 | Basement (if any) | 100.0% |
| BUNGALOW NO A326 | Podiums (if any) | 0.0% |
| BUNGALOW NO A326 | Plinth | 100.0% |
| BUNGALOW NO A326 | Stilt Floor | 0.0% |
| BUNGALOW NO A326 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A326 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A326 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A326 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A326 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A326 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A327 | Excavation | 100.0% |
| BUNGALOW NO A327 | Basement (if any) | 100.0% |
| BUNGALOW NO A327 | Podiums (if any) | 0.0% |
| BUNGALOW NO A327 | Plinth | 100.0% |
| BUNGALOW NO A327 | Stilt Floor | 0.0% |
| BUNGALOW NO A327 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A327 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50.0% |
| BUNGALOW NO A327 | Sanitary Fittings within the flats / premises | 56.0% |
| BUNGALOW NO A327 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 47.0% |
| BUNGALOW NO A327 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A327 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A328 | Excavation | 100.0% |
| BUNGALOW NO A328 | Basement (if any) | 100.0% |
| BUNGALOW NO A328 | Podiums (if any) | 0.0% |
| BUNGALOW NO A328 | Plinth | 100.0% |
| BUNGALOW NO A328 | Stilt Floor | 0.0% |
| BUNGALOW NO A328 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A328 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A328 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A328 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A328 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A328 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A329 | Excavation | 100.0% |
| BUNGALOW NO A329 | Basement (if any) | 100.0% |
| BUNGALOW NO A329 | Podiums (if any) | 0.0% |
| BUNGALOW NO A329 | Plinth | 100.0% |
| BUNGALOW NO A329 | Stilt Floor | 0.0% |
| BUNGALOW NO A329 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A329 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A329 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A329 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A329 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A329 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A330 | Excavation | 100.0% |
| BUNGALOW NO A330 | Basement (if any) | 100.0% |
| BUNGALOW NO A330 | Podiums (if any) | 0.0% |
| BUNGALOW NO A330 | Plinth | 100.0% |
| BUNGALOW NO A330 | Stilt Floor | 0.0% |
| BUNGALOW NO A330 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A330 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A330 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A330 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A330 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A330 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A331 | Excavation | 100.0% |
| BUNGALOW NO A331 | Basement (if any) | 100.0% |
| BUNGALOW NO A331 | Podiums (if any) | 0.0% |
| BUNGALOW NO A331 | Plinth | 100.0% |
| BUNGALOW NO A331 | Stilt Floor | 0.0% |
| BUNGALOW NO A331 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A331 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A331 | Sanitary Fittings within the flats / premises | 38.0% |
| BUNGALOW NO A331 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A331 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 77.0% |
| BUNGALOW NO A331 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A332 | Excavation | 100.0% |
| BUNGALOW NO A332 | Basement (if any) | 100.0% |
| BUNGALOW NO A332 | Podiums (if any) | 0.0% |
| BUNGALOW NO A332 | Plinth | 100.0% |
| BUNGALOW NO A332 | Stilt Floor | 0.0% |
| BUNGALOW NO A332 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A332 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A332 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A332 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A332 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A332 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A333 | Excavation | 100.0% |
| BUNGALOW NO A333 | Basement (if any) | 100.0% |
| BUNGALOW NO A333 | Podiums (if any) | 0.0% |
| BUNGALOW NO A333 | Plinth | 100.0% |
| BUNGALOW NO A333 | Stilt Floor | 0.0% |
| BUNGALOW NO A333 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A333 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A333 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A333 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A333 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A333 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A334 | Excavation | 100.0% |
| BUNGALOW NO A334 | Basement (if any) | 100.0% |
| BUNGALOW NO A334 | Podiums (if any) | 0.0% |
| BUNGALOW NO A334 | Plinth | 100.0% |
| BUNGALOW NO A334 | Stilt Floor | 0.0% |
| BUNGALOW NO A334 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A334 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A334 | Sanitary Fittings within the flats / premises | 10.0% |
| BUNGALOW NO A334 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A334 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A334 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A335 | Excavation | 100.0% |
| BUNGALOW NO A335 | Basement (if any) | 100.0% |
| BUNGALOW NO A335 | Podiums (if any) | 0.0% |
| BUNGALOW NO A335 | Plinth | 100.0% |
| BUNGALOW NO A335 | Stilt Floor | 0.0% |
| BUNGALOW NO A335 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A335 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A335 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A335 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A335 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A335 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A336 | Excavation | 100.0% |
| BUNGALOW NO A336 | Basement (if any) | 100.0% |
| BUNGALOW NO A336 | Podiums (if any) | 0.0% |
| BUNGALOW NO A336 | Plinth | 100.0% |
| BUNGALOW NO A336 | Stilt Floor | 0.0% |
| BUNGALOW NO A336 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A336 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A336 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A336 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 13.0% |
| BUNGALOW NO A336 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A336 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A337 | Excavation | 100.0% |
| BUNGALOW NO A337 | Basement (if any) | 100.0% |
| BUNGALOW NO A337 | Podiums (if any) | 0.0% |
| BUNGALOW NO A337 | Plinth | 100.0% |
| BUNGALOW NO A337 | Stilt Floor | 0.0% |
| BUNGALOW NO A337 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A337 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A337 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A337 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 7.0% |
| BUNGALOW NO A337 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A337 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A338 | Excavation | 100.0% |
| BUNGALOW NO A338 | Basement (if any) | 100.0% |
| BUNGALOW NO A338 | Podiums (if any) | 0.0% |
| BUNGALOW NO A338 | Plinth | 100.0% |
| BUNGALOW NO A338 | Stilt Floor | 0.0% |
| BUNGALOW NO A338 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A338 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A338 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A338 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A338 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A338 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A339 | Excavation | 100.0% |
| BUNGALOW NO A339 | Basement (if any) | 100.0% |
| BUNGALOW NO A339 | Podiums (if any) | 0.0% |
| BUNGALOW NO A339 | Plinth | 100.0% |
| BUNGALOW NO A339 | Stilt Floor | 0.0% |
| BUNGALOW NO A339 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A339 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A339 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A339 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A339 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A339 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A340 | Excavation | 100.0% |
| BUNGALOW NO A340 | Basement (if any) | 100.0% |
| BUNGALOW NO A340 | Podiums (if any) | 0.0% |
| BUNGALOW NO A340 | Plinth | 100.0% |
| BUNGALOW NO A340 | Stilt Floor | 0.0% |
| BUNGALOW NO A340 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A340 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25.0% |
| BUNGALOW NO A340 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A340 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A340 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A340 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A341 | Excavation | 100.0% |
| BUNGALOW NO A341 | Basement (if any) | 100.0% |
| BUNGALOW NO A341 | Podiums (if any) | 0.0% |
| BUNGALOW NO A341 | Plinth | 100.0% |
| BUNGALOW NO A341 | Stilt Floor | 0.0% |
| BUNGALOW NO A341 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A341 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A341 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A341 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A341 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A341 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A342 | Excavation | 100.0% |
| BUNGALOW NO A342 | Basement (if any) | 100.0% |
| BUNGALOW NO A342 | Podiums (if any) | 0.0% |
| BUNGALOW NO A342 | Plinth | 100.0% |
| BUNGALOW NO A342 | Stilt Floor | 0.0% |
| BUNGALOW NO A342 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A342 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A342 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A342 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A342 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A342 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A343 | Excavation | 100.0% |
| BUNGALOW NO A343 | Basement (if any) | 100.0% |
| BUNGALOW NO A343 | Podiums (if any) | 0.0% |
| BUNGALOW NO A343 | Plinth | 100.0% |
| BUNGALOW NO A343 | Stilt Floor | 0.0% |
| BUNGALOW NO A343 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A343 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A343 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A343 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A343 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A343 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A344 | Excavation | 100.0% |
| BUNGALOW NO A344 | Basement (if any) | 100.0% |
| BUNGALOW NO A344 | Podiums (if any) | 0.0% |
| BUNGALOW NO A344 | Plinth | 100.0% |
| BUNGALOW NO A344 | Stilt Floor | 0.0% |
| BUNGALOW NO A344 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A344 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A344 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A344 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A344 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A344 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A345 | Excavation | 100.0% |
| BUNGALOW NO A345 | Basement (if any) | 100.0% |
| BUNGALOW NO A345 | Podiums (if any) | 0.0% |
| BUNGALOW NO A345 | Plinth | 100.0% |
| BUNGALOW NO A345 | Stilt Floor | 0.0% |
| BUNGALOW NO A345 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A345 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A345 | Sanitary Fittings within the flats / premises | 17.0% |
| BUNGALOW NO A345 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A345 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A345 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A346 | Excavation | 100.0% |
| BUNGALOW NO A346 | Basement (if any) | 100.0% |
| BUNGALOW NO A346 | Podiums (if any) | 0.0% |
| BUNGALOW NO A346 | Plinth | 100.0% |
| BUNGALOW NO A346 | Stilt Floor | 0.0% |
| BUNGALOW NO A346 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A346 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A346 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A346 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| BUNGALOW NO A346 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A346 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A347 | Excavation | 100.0% |
| BUNGALOW NO A347 | Basement (if any) | 100.0% |
| BUNGALOW NO A347 | Podiums (if any) | 0.0% |
| BUNGALOW NO A347 | Plinth | 100.0% |
| BUNGALOW NO A347 | Stilt Floor | 0.0% |
| BUNGALOW NO A347 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A347 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A347 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A347 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A347 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A347 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A348 | Excavation | 100.0% |
| BUNGALOW NO A348 | Basement (if any) | 100.0% |
| BUNGALOW NO A348 | Podiums (if any) | 0.0% |
| BUNGALOW NO A348 | Plinth | 100.0% |
| BUNGALOW NO A348 | Stilt Floor | 0.0% |
| BUNGALOW NO A348 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A348 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A348 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A348 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A348 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A348 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A349 | Excavation | 100.0% |
| BUNGALOW NO A349 | Basement (if any) | 100.0% |
| BUNGALOW NO A349 | Podiums (if any) | 0.0% |
| BUNGALOW NO A349 | Plinth | 100.0% |
| BUNGALOW NO A349 | Stilt Floor | 0.0% |
| BUNGALOW NO A349 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A349 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100.0% |
| BUNGALOW NO A349 | Sanitary Fittings within the flats / premises | 100.0% |
| BUNGALOW NO A349 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100.0% |
| BUNGALOW NO A349 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100.0% |
| BUNGALOW NO A349 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100.0% |
| BUNGALOW NO A350 | Excavation | 100.0% |
| BUNGALOW NO A350 | Basement (if any) | 100.0% |
| BUNGALOW NO A350 | Podiums (if any) | 0.0% |
| BUNGALOW NO A350 | Plinth | 100.0% |
| BUNGALOW NO A350 | Stilt Floor | 0.0% |
| BUNGALOW NO A350 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A350 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| BUNGALOW NO A350 | Sanitary Fittings within the flats / premises | 0.0% |
| BUNGALOW NO A350 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 17.0% |
| BUNGALOW NO A350 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A350 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A351 | Excavation | 100.0% |
| BUNGALOW NO A351 | Basement (if any) | 100.0% |
| BUNGALOW NO A351 | Podiums (if any) | 0.0% |
| BUNGALOW NO A351 | Plinth | 100.0% |
| BUNGALOW NO A351 | Stilt Floor | 0.0% |
| BUNGALOW NO A351 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A351 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10.0% |
| BUNGALOW NO A351 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A351 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A351 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A351 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A352 | Excavation | 100.0% |
| BUNGALOW NO A352 | Basement (if any) | 100.0% |
| BUNGALOW NO A352 | Podiums (if any) | 0.0% |
| BUNGALOW NO A352 | Plinth | 100.0% |
| BUNGALOW NO A352 | Stilt Floor | 0.0% |
| BUNGALOW NO A352 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A352 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A352 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A352 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 23.0% |
| BUNGALOW NO A352 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A352 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A353 | Excavation | 100.0% |
| BUNGALOW NO A353 | Basement (if any) | 100.0% |
| BUNGALOW NO A353 | Podiums (if any) | 0.0% |
| BUNGALOW NO A353 | Plinth | 100.0% |
| BUNGALOW NO A353 | Stilt Floor | 0.0% |
| BUNGALOW NO A353 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A353 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A353 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A353 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A353 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A353 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A354 | Excavation | 100.0% |
| BUNGALOW NO A354 | Basement (if any) | 100.0% |
| BUNGALOW NO A354 | Podiums (if any) | 0.0% |
| BUNGALOW NO A354 | Plinth | 100.0% |
| BUNGALOW NO A354 | Stilt Floor | 0.0% |
| BUNGALOW NO A354 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A354 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A354 | Sanitary Fittings within the flats / premises | 25.0% |
| BUNGALOW NO A354 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A354 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A354 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A355 | Excavation | 100.0% |
| BUNGALOW NO A355 | Basement (if any) | 100.0% |
| BUNGALOW NO A355 | Podiums (if any) | 0.0% |
| BUNGALOW NO A355 | Plinth | 100.0% |
| BUNGALOW NO A355 | Stilt Floor | 0.0% |
| BUNGALOW NO A355 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A355 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20.0% |
| BUNGALOW NO A355 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A355 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A355 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| BUNGALOW NO A355 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A356 | Excavation | 100.0% |
| BUNGALOW NO A356 | Basement (if any) | 100.0% |
| BUNGALOW NO A356 | Podiums (if any) | 0.0% |
| BUNGALOW NO A356 | Plinth | 100.0% |
| BUNGALOW NO A356 | Stilt Floor | 0.0% |
| BUNGALOW NO A356 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A356 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A356 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A356 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A356 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A356 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| BUNGALOW NO A357 | Excavation | 100.0% |
| BUNGALOW NO A357 | Basement (if any) | 100.0% |
| BUNGALOW NO A357 | Podiums (if any) | 0.0% |
| BUNGALOW NO A357 | Plinth | 100.0% |
| BUNGALOW NO A357 | Stilt Floor | 0.0% |
| BUNGALOW NO A357 | Slabs of Super Structure | 100.0% |
| BUNGALOW NO A357 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40.0% |
| BUNGALOW NO A357 | Sanitary Fittings within the flats / premises | 13.0% |
| BUNGALOW NO A357 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| BUNGALOW NO A357 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 43.0% |
| BUNGALOW NO A357 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100025843
| Revised target | Reason given by the builder |
|---|---|
| 30 December 2027 | To, The MahaRERA Authority, Sub : Reason for the Extension to the Project Vaarivana Phase A2 bearing Registration No. P52100025843. Due to certain technical issues, the project could not be commenced within the originally scheduled timeline. At present, all works are being carried out strictly in accordance with the applicable rules and regulations, and the internal construction activities are in full progress. Upon completion of the construction, additional time will be required to obtain the Occupation Certificate from the concerned authority. We sincerely request your kind consideration in processing the pending extension application, and we assure you that we are making every effort to meet the regulatory requirements and complete the project as per the revised timelines. In view of the above, we hereby apply for an extension of the project completion date up to 30/12/2027. |
MahaRERA project filing · read 19 July 2026 · registration P52100025843
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹729,798,379 | ₹689,253,168 | ₹163,400,000 | ₹1,582,451,547 |
| Actual raised | ₹15,842,938 | ₹0 | ₹1,278,622,016 | ₹1,294,464,954 |
MahaRERA project filing · read 19 July 2026 · registration P52100025843
23 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100025843
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100025843
Builder and past records
Projects registered under this company
10Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 12 July 2026
Past records of sales and unsold homes
26 September 2026
4 marked unsold · 166 sold · 0 booked.
Saved MahaRERA home list
17 September 2026
4 marked unsold · 166 sold · 0 booked.
Saved MahaRERA home list
9 September 2026
4 marked unsold · 166 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
4 marked unsold · 166 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Urse · Pune
P52100077518
120 of 120 entries marked unsold
MahaRERA · per-home inventory · read 19 July 2026
View project details →Urse · Pune
P52100018391
8 of 284 entries marked unsold
MahaRERA · per-home inventory · saved-file date 18 July 2026
View project details →Urse · Pune
P52100018123
2 of 150 entries marked unsold
MahaRERA · per-home inventory · read 19 July 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.