homeonpaper.

Builder’s RERA records,
explained for buyers.

The builder’s RERA record, explained

VARAD COMPLEX

Suprabhat Constructions · P52100029105

MahaRERA · registration record · read 12 July 2026

Choose a report ↓

What does the RERA record show?

For VARAD COMPLEX (P52100029105), 82 of 92 entries were marked unsold in the MahaRERA unit list read 9 September 2026.

MahaRERA · per-unit inventory · read 9 September 2026

For VARAD COMPLEX, ₹8,482 per sq ft of filed area is the median rate across 6 sold or booked entries with prices in the MahaRERA unit list read 9 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · read 9 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹8,482/ sq ft filed area

Across 6 sold or booked entries with reported prices. The middle 80% of rates fall between ₹7,949 and ₹8,838.

MahaRERA · per-unit inventory · read 9 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

92 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 9 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
AMENITY BUILDING40004161.00 sq m≈ 1,733 sq ft
BUILDING A WING A AND B326026037.93–39.34 sq m≈ 408–423 sq ft
BUILDING B320032038.00–48.64 sq m≈ 409–524 sq ft
BUILDING C240024041.23–53.17 sq m≈ 444–572 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

92 listed entries

MahaRERA · per-unit inventory · read 9 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
101AMENITY BUILDING / Wing NA1161.0 sq m≈ 1,733 sq ft · RERA carpet areaReservedNot stated
201AMENITY BUILDING / Wing NA2161.0 sq m≈ 1,733 sq ft · RERA carpet areaReservedNot stated
301AMENITY BUILDING / Wing NA3161.0 sq m≈ 1,733 sq ft · RERA carpet areaReservedNot stated
401AMENITY BUILDING / Wing NA4161.0 sq m≈ 1,733 sq ft · RERA carpet areaReservedNot stated
101BUILDING A WING A AND B / Wing NA139.34 sq m≈ 423 sq ft · RERA carpet areaSold₹3,496,440
101BUILDING A WING A AND B / Wing NA139.34 sq m≈ 423 sq ft · RERA carpet areaMarked unsoldNot stated
102BUILDING A WING A AND B / Wing NA137.93 sq m≈ 408 sq ft · RERA carpet areaMarked unsoldNot stated
102BUILDING A WING A AND B / Wing NA137.93 sq m≈ 408 sq ft · RERA carpet areaMarked unsoldNot stated
103BUILDING A WING A AND B / Wing NA138.74 sq m≈ 417 sq ft · RERA carpet areaSold₹3,314,800
103BUILDING A WING A AND B / Wing NA138.74 sq m≈ 417 sq ft · RERA carpet areaMarked unsoldNot stated
104BUILDING A WING A AND B / Wing NA139.34 sq m≈ 423 sq ft · RERA carpet areaSold₹3,583,800
104BUILDING A WING A AND B / Wing NA139.34 sq m≈ 423 sq ft · RERA carpet areaMarked unsoldNot stated

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹62,050,000 of an estimated ₹110,000,000 was reported as incurred (56.4%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100029105

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
BUILDING A WING A AND BExcavation100.0%
BUILDING A WING A AND BBasement (if any)0.0%
BUILDING A WING A AND BPodiums (if any) 0.0%
BUILDING A WING A AND BPlinth100.0%
BUILDING A WING A AND BStilt Floor 80.0%
BUILDING A WING A AND BSlabs of Super Structure80.0%
BUILDING A WING A AND BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80.0%
BUILDING A WING A AND BSanitary Fittings within the flats / premises30.0%
BUILDING A WING A AND BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING A WING A AND BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60.0%
BUILDING A WING A AND BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
AMENITY BUILDINGExcavation0.0%
AMENITY BUILDINGBasement (if any)0.0%
AMENITY BUILDINGPodiums (if any) 0.0%
AMENITY BUILDINGPlinth0.0%
AMENITY BUILDINGStilt Floor 0.0%
AMENITY BUILDINGSlabs of Super Structure0.0%
AMENITY BUILDINGInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
AMENITY BUILDINGSanitary Fittings within the flats / premises0.0%
AMENITY BUILDINGStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
AMENITY BUILDINGExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
AMENITY BUILDINGInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING BExcavation0.0%
BUILDING BBasement (if any)0.0%
BUILDING BPodiums (if any) 0.0%
BUILDING BPlinth0.0%
BUILDING BStilt Floor 0.0%
BUILDING BSlabs of Super Structure0.0%
BUILDING BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING BSanitary Fittings within the flats / premises0.0%
BUILDING BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BUILDING CExcavation0.0%
BUILDING CBasement (if any)0.0%
BUILDING CPodiums (if any) 0.0%
BUILDING CPlinth0.0%
BUILDING CStilt Floor 0.0%
BUILDING CSlabs of Super Structure0.0%
BUILDING CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BUILDING CSanitary Fittings within the flats / premises0.0%
BUILDING CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BUILDING CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BUILDING CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100029105

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹109,857,210₹0₹17,642,790₹127,500,000
Actual raised₹52,781,288₹0₹14,279,978₹67,061,266

MahaRERA project filing · read 19 July 2026 · registration P52100029105

Quarterly filing record

16 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100029105

Documents named in the filing

  • Promoter PAN · 2 listed
  • Form 3 — CA certificate · 14 listed
  • Title / search report · 2 listed
  • Form B — Promoter declaration · 3 listed
  • Sanctioned layout plan · 2 listed
  • Sanctioned building plan · 12 listed
  • Form 1 — Architect's certificate · 15 listed
  • Form 2 — Engineer's certificate · 16 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100029105

Builder and past records

What else does the record show?

Projects registered under this company

Suprabhat Constructions

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 26 September 2026

      82 marked unsold · 6 sold · 0 booked.

      Saved MahaRERA unit list

    2. 17 September 2026

      82 marked unsold · 6 sold · 0 booked.

      Saved MahaRERA unit list

    3. 9 September 2026

      82 marked unsold · 6 sold · 0 booked.

      Saved MahaRERA unit list

    4. 19 July 2026

      83 marked unsold · 5 sold · 0 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, property type and price.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-unit inventory · read 9 September 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100029105 ↗
    homeonpaper