Buyer’s Report
Understand this project
Find homes to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
M/s. Sharad Shree Enterprises, Sachin Date, Jayshree Date · P52100046709
For Majestique Towers East Phase 05 (P52100046709), 232 of 232 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).
MahaRERA · per-home inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Inside this registered phase
232 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-home inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded carpet-area range |
|---|---|---|---|---|---|---|
| Wing F1 | 91 | 0 | 0 | 91 | 0 | 27.12–60.05 sq m≈ 292–646 sq ft |
| Wing F2 | 141 | 0 | 0 | 141 | 0 | 21.42–60.63 sq m≈ 231–653 sq ft |
Different sizes are not necessarily different bedroom types. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same home number may appear in more than one building. Check both before choosing.
MahaRERA · per-home inventory · saved-file date 18 July 2026
| Home / building | Floor in the record | Carpet area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001Wing F1 | 10 | 51.18 sq m≈ 551 sq ft | Marked unsold | Not stated | |
| 1002Wing F1 | 10 | 50.8 sq m≈ 547 sq ft | Marked unsold | Not stated | |
| 1003Wing F1 | 10 | 50.8 sq m≈ 547 sq ft | Marked unsold | Not stated | |
| 1004Wing F1 | 10 | 51.18 sq m≈ 551 sq ft | Marked unsold | Not stated | |
| 1201Wing F1 | 12 | 59.6 sq m≈ 642 sq ft | Marked unsold | Not stated | |
| 1202Wing F1 | 12 | 42.95 sq m≈ 462 sq ft | Marked unsold | Not stated | |
| 1203Wing F1 | 12 | 60.05 sq m≈ 646 sq ft | Marked unsold | Not stated | |
| 1204Wing F1 | 12 | 59.6 sq m≈ 642 sq ft | Marked unsold | Not stated | |
| 1301Wing F1 | 13 | 59.6 sq m≈ 642 sq ft | Marked unsold | Not stated | |
| 1302Wing F1 | 13 | 60.05 sq m≈ 646 sq ft | Marked unsold | Not stated | |
| 1303Wing F1 | 13 | 60.05 sq m≈ 646 sq ft | Marked unsold | Not stated | |
| 1304Wing F1 | 13 | 59.6 sq m≈ 642 sq ft | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved home list.
Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Wing F1 | Excavation | 100.0% |
| Wing F1 | Basement (if any) | 100.0% |
| Wing F1 | Podiums (if any) | 0.0% |
| Wing F1 | Plinth | 100.0% |
| Wing F1 | Stilt Floor | 0.0% |
| Wing F1 | Slabs of Super Structure | 12.0% |
| Wing F1 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 45.0% |
| Wing F1 | Sanitary Fittings within the flats / premises | 0.0% |
| Wing F1 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| Wing F1 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Wing F1 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
| Wing F2 | Excavation | 100.0% |
| Wing F2 | Basement (if any) | 100.0% |
| Wing F2 | Podiums (if any) | 0.0% |
| Wing F2 | Plinth | 100.0% |
| Wing F2 | Stilt Floor | 0.0% |
| Wing F2 | Slabs of Super Structure | 5.0% |
| Wing F2 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 50.0% |
| Wing F2 | Sanitary Fittings within the flats / premises | 0.0% |
| Wing F2 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 30.0% |
| Wing F2 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Wing F2 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration P52100046709
17 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration P52100046709
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration P52100046709
Builder and past records
Projects registered under this company
6Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 2 July 2026 – 12 July 2026
Past records of sales and unsold homes
27 September 2026
232 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
18 September 2026
232 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
10 September 2026
232 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
19 July 2026
232 marked unsold · 0 sold · 0 booked.
Saved MahaRERA home list
These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.
More projects to explore
These projects list the same locality. They may differ in exact location, home type and price.
Wagholi · Pune
PR1260002501224
114 of 158 entries marked unsold
MahaRERA · per-home inventory · read 12 September 2026
View project details →Wagholi · Pune
P52100050630
43 of 104 entries marked unsold
MahaRERA · per-home inventory · read 10 September 2026
View project details →Wagholi · Pune
P52100032093
26 of 152 entries marked unsold
MahaRERA · per-home inventory · read 9 September 2026
View project details →Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-home inventory · saved-file date 18 July 2026
This is a past RERA home list, not current availability. It does not give the date each home was sold.
The home-list date is based on the saved file’s details.
Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search P52100046709 ↗