What does the RERA record show?

For Geras Island of Joy Project B (P52100052474), 23 of 626 entries were marked unsold in the MahaRERA home list dated 18 July 2026 (saved-file date).

MahaRERA · per-home inventory · saved-file date 18 July 2026

For Geras Island of Joy Project B, ₹12,407 per sq ft of carpet area is the median rate across 603 sold or booked entries with prices in the MahaRERA home list dated 18 July 2026 (saved-file date). These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · saved-file date 18 July 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹12,407/ sq ft carpet area

Across 603 sold or booked entries with reported prices. The middle 80% of rates fall between ₹11,523 and ₹13,568.

MahaRERA · per-home inventory · saved-file date 18 July 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

626 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · saved-file date 18 July 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Tower 0418517456068.74–138.32 sq m≈ 740–1,489 sq ft
Tower 08187174310057.04–131.37 sq m≈ 614–1,414 sq ft
Tower 09A and 09B25424527055.42–140.21 sq m≈ 597–1,509 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

626 listed entries

MahaRERA · per-home inventory · saved-file date 18 July 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Tower 041083.73 sq m≈ 901 sq ftSold₹10,851,299
1002Tower 0410138.32 sq m≈ 1,489 sq ftSold₹18,491,291
1003Tower 041084.7 sq m≈ 912 sq ftSold₹11,096,344
1004Tower 041084.53 sq m≈ 910 sq ftSold₹11,694,501
1005Tower 041094.96 sq m≈ 1,022 sq ftSold₹12,691,728
1006Tower 041093.74 sq m≈ 1,009 sq ftSold₹12,480,499
101Tower 04183.73 sq m≈ 901 sq ftSold₹10,790,803
102Tower 041138.32 sq m≈ 1,489 sq ftSold₹21,136,052
103Tower 04184.7 sq m≈ 912 sq ftMarked unsoldNot stated
105Tower 04194.96 sq m≈ 1,022 sq ftMarked unsoldNot stated
106Tower 04193.74 sq m≈ 1,009 sq ftSold₹13,269,823
1101Tower 041183.73 sq m≈ 901 sq ftSold₹10,864,348

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹1,096,916,273 of an estimated ₹3,837,788,151 was reported as incurred (28.6%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100052474

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Tower 09A and 09BExcavation100.0%
Tower 09A and 09BBasement (if any)85.0%
Tower 09A and 09BPodiums (if any) 0.0%
Tower 09A and 09BPlinth85.0%
Tower 09A and 09BStilt Floor 80.0%
Tower 09A and 09BSlabs of Super Structure20.8%
Tower 09A and 09BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises1.0%
Tower 09A and 09BSanitary Fittings within the flats / premises0.0%
Tower 09A and 09BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks14.0%
Tower 09A and 09BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower 09A and 09BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower 08Excavation100.0%
Tower 08Basement (if any)80.0%
Tower 08Podiums (if any) 0.0%
Tower 08Plinth80.0%
Tower 08Stilt Floor 80.0%
Tower 08Slabs of Super Structure59.7%
Tower 08Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17.3%
Tower 08Sanitary Fittings within the flats / premises0.0%
Tower 08Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks14.0%
Tower 08External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.7.36%
Tower 08Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower 04Excavation100.0%
Tower 04Basement (if any)80.0%
Tower 04Podiums (if any) 0.0%
Tower 04Plinth80.0%
Tower 04Stilt Floor 80.0%
Tower 04Slabs of Super Structure27.8%
Tower 04Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises2.3%
Tower 04Sanitary Fittings within the flats / premises0.0%
Tower 04Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks14.0%
Tower 04External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower 04Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100052474

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹986,480,153₹3,828,350,000₹1,000,000,000₹5,814,830,153
Actual raised₹11,240,138₹97,721,522₹2,464,040,000₹2,573,001,660

MahaRERA project filing · read 19 July 2026 · registration P52100052474

Quarterly filing record

11 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100052474

Documents named in the filing

  • Promoter PAN · 3 listed
  • Commencement certificate · 3 listed
  • Occupancy / completion certificate · 6 listed
  • Form 1 — Architect's certificate · 4 listed
  • Form 3 — CA certificate · 4 listed
  • Form 2 — Engineer's certificate · 4 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Sanctioned layout plan · 2 listed
  • Sanctioned building plan · 44 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100052474

Builder and past records

What else does the record show?

Projects registered under this company

Gera Developments Private Limited

27Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

Past records of sales and unsold homes

  1. 27 September 2026

    23 marked unsold · 593 sold · 10 booked.

    Saved MahaRERA home list

  2. 19 September 2026

    23 marked unsold · 593 sold · 10 booked.

    Saved MahaRERA home list

  3. 11 September 2026

    23 marked unsold · 593 sold · 10 booked.

    Saved MahaRERA home list

  4. 19 July 2026

    23 marked unsold · 593 sold · 10 booked.

    Saved MahaRERA home list

These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

More projects to explore

Other projects in this locality.

These projects list the same locality. They may differ in exact location, home type and price.

Project Comparison Report

Which project should you buy in?
And which home?

Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

Create my Comparison Report →

2 projects · ₹7,999
3 projects · ₹9,999

Within 1 working day

Didn’t help you decide? Full refund — no questions asked.

Compare project details for free →

Sources and dates.

MahaRERA · registration record · read 12 July 2026

MahaRERA · per-home inventory · saved-file date 18 July 2026

This is a past RERA home list, not current availability. It does not give the date each home was sold.

The home-list date is based on the saved file’s details.

Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

Open MahaRERA · search P52100052474 ↗
homeonpaper