What does the RERA record show?

For Casagrand Caladium (P52100080302), 216 of 334 entries were marked unsold in the MahaRERA home list read 11 September 2026.

MahaRERA · per-home inventory · read 11 September 2026

For Casagrand Caladium, ₹11,133 per sq ft of carpet area is the median rate across 118 sold or booked entries with prices in the MahaRERA home list read 11 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-home inventory · read 11 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹11,133/ sq ft carpet area

Across 118 sold or booked entries with reported prices. The middle 80% of rates fall between ₹10,734 and ₹12,067.

MahaRERA · per-home inventory · read 11 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its carpet area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold homes and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar homes sell for?

Compare reported agreement values by building, size and floor. See which homes were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

334 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 11 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Tower R647948094.11–113.50 sq m≈ 1,013–1,222 sq ft
Tower S1646850094.06–113.46 sq m≈ 1,012–1,221 sq ft
Tower S2647750080.45–113.67 sq m≈ 866–1,224 sq ft
Tower T16251146089.80–113.60 sq m≈ 967–1,223 sq ft
Tower T280263222079.18–116.44 sq m≈ 852–1,253 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

334 listed entries

MahaRERA · per-home inventory · read 11 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1001Tower R10113.46 sq m≈ 1,221 sq ftSold₹13,560,984
1002Tower R10113.5 sq m≈ 1,222 sq ftMarked unsoldNot stated
1003Tower R10113.38 sq m≈ 1,220 sq ftMarked unsoldNot stated
1004Tower R10113.46 sq m≈ 1,221 sq ftBooked₹13,691,577
101Tower R1113.46 sq m≈ 1,221 sq ftMarked unsoldNot stated
102Tower R194.11 sq m≈ 1,013 sq ftMarked unsoldNot stated
103Tower R1113.45 sq m≈ 1,221 sq ftMarked unsoldNot stated
104Tower R1113.46 sq m≈ 1,221 sq ftMarked unsoldNot stated
1101Tower R11113.46 sq m≈ 1,221 sq ftBooked₹14,014,827
1102Tower R11113.5 sq m≈ 1,222 sq ftMarked unsoldNot stated
1103Tower R11113.38 sq m≈ 1,220 sq ftMarked unsoldNot stated
1104Tower R11113.46 sq m≈ 1,221 sq ftBooked₹14,972,940

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹39,517,557 of an estimated ₹1,294,976,458 was reported as incurred (3.1%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 19 July 2026 · registration P52100080302

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
Tower RExcavation0.0%
Tower RBasement (if any)0.0%
Tower RPodiums (if any) 0.0%
Tower RPlinth0.0%
Tower RStilt Floor 0.0%
Tower RSlabs of Super Structure0.0%
Tower RInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower RSanitary Fittings within the flats / premises0.0%
Tower RStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower RExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower RInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower S1Excavation0.0%
Tower S1Basement (if any)0.0%
Tower S1Podiums (if any) 0.0%
Tower S1Plinth0.0%
Tower S1Stilt Floor 0.0%
Tower S1Slabs of Super Structure0.0%
Tower S1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower S1Sanitary Fittings within the flats / premises0.0%
Tower S1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower S1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower S1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower S2Excavation0.0%
Tower S2Basement (if any)0.0%
Tower S2Podiums (if any) 0.0%
Tower S2Plinth0.0%
Tower S2Stilt Floor 0.0%
Tower S2Slabs of Super Structure0.0%
Tower S2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower S2Sanitary Fittings within the flats / premises0.0%
Tower S2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower S2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower S2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower T1Excavation0.0%
Tower T1Basement (if any)0.0%
Tower T1Podiums (if any) 0.0%
Tower T1Plinth0.0%
Tower T1Stilt Floor 0.0%
Tower T1Slabs of Super Structure0.0%
Tower T1Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower T1Sanitary Fittings within the flats / premises0.0%
Tower T1Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower T1External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower T1Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Tower T2Excavation0.0%
Tower T2Basement (if any)0.0%
Tower T2Podiums (if any) 0.0%
Tower T2Plinth0.0%
Tower T2Stilt Floor 0.0%
Tower T2Slabs of Super Structure0.0%
Tower T2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Tower T2Sanitary Fittings within the flats / premises0.0%
Tower T2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Tower T2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Tower T2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 19 July 2026 · registration P52100080302

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹422,580,000₹1,500,000,000₹1,396,287,645₹3,318,867,645
Actual raised₹422,580,000₹1,050,000,000₹119,312,680₹1,591,892,680

MahaRERA project filing · read 19 July 2026 · registration P52100080302

Quarterly filing record

4 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 19 July 2026 · registration P52100080302

Documents named in the filing

  • Sanctioned layout plan · 1 listed
  • Sanctioned building plan · 12 listed
  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Promoter PAN · 2 listed
  • Commencement certificate · 13 listed
  • Occupancy / completion certificate · 1 listed
  • Form 1 — Architect's certificate · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Form 2 — Engineer's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 19 July 2026 · registration P52100080302

Builder and past records

What else does the record show?

Projects registered under this company

Casagrand Millenia Private Limited

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 12 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 20 September 2026

      216 marked unsold · 51 sold · 67 booked.

      Saved MahaRERA home list

    2. 11 September 2026

      216 marked unsold · 51 sold · 67 booked.

      Saved MahaRERA home list

    3. 19 July 2026

      242 marked unsold · 37 sold · 55 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      242 marked unsold · 37 sold · 55 booked.

      Saved MahaRERA home list, date based on the saved file

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 12 July 2026

    MahaRERA · per-home inventory · read 11 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search P52100080302 ↗
    homeonpaper