What does the RERA record show?

For The Chordiya Towers (PM1260002501962), 152 of 246 entries were marked unsold in the MahaRERA unit list read 4 September 2026.

MahaRERA · per-unit inventory · read 4 September 2026

For The Chordiya Towers, ₹7,378 per sq ft of filed area is the median rate across 94 sold or booked entries with prices in the MahaRERA unit list read 4 September 2026. These are historical agreement values, not current asking prices.

MahaRERA · per-unit inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find units to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular unit

See its advantages, drawbacks and how it compares with other units in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended units in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Prices reported to RERA

What prices have been reported?

₹7,378/ sq ft filed area

Across 94 sold or booked entries with reported prices. The middle 80% of rates fall between ₹5,692 and ₹10,274.

MahaRERA · per-unit inventory · read 4 September 2026

How is this calculated?

For each sold or booked entry, we divide the reported agreement value by its filed area in square feet. The median is the middle rate when these rates are put in order. We show it only when at least five entries have prices. We exclude valuations of unsold units and government reference rates. The figures may include different sizes and property types. They are historical agreement values, not current asking prices or the total cost including extra charges.

Sales Report

What did similar units sell for?

Compare filed values by building, unit-number pattern and area. See which units were marked unsold on the date shown.

₹2,999 · delivered on payment

Inside this registered phase

How do the buildings compare in the record?

246 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-unit inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and filed areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded filed-area range
A wing15096084.64–109.70 sq m≈ 911–1,181 sq ft
B wing4022081.97–175.09 sq m≈ 882–1,885 sq ft
Bungalow10010363.06 sq m≈ 3,908 sq ft
C wing4040095.43–102.32 sq m≈ 1,027–1,101 sq ft
Commercial10010282.76 sq m≈ 3,044 sq ft
D wing4040095.43–102.32 sq m≈ 1,027–1,101 sq ft
E wing40400100.94–120.55 sq m≈ 1,087–1,298 sq ft
F wing126071550111.99–138.74 sq m≈ 1,205–1,493 sq ft
G wing6006087.75 sq m≈ 945 sq ft
H wing (MAHDA)810081052.80 sq m≈ 568 sq ft

Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →

Unit Report

Is this the right
unit for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your unit in the RERA list.

The same unit number may appear in more than one building. Check both before choosing.

246 listed entries

MahaRERA · per-unit inventory · read 4 September 2026

RERA unit list, not current availability
Unit / buildingFloor in the recordFiled areaReported statusAgreement valueAssess
101A wing / Wing NA187.52 sq m≈ 942 sq ft · RERA carpet areaBooked₹10,000,000
102A wing / Wing NA187.52 sq m≈ 942 sq ft · RERA carpet areaBooked₹8,000,000
103A wing / Wing NA1109.7 sq m≈ 1,181 sq ft · RERA carpet areaBooked₹9,000,000
104A wing / Wing NA1109.7 sq m≈ 1,181 sq ft · RERA carpet areaBooked₹10,000,000
105A wing / Wing NA185.34 sq m≈ 919 sq ft · RERA carpet areaMarked unsoldNot stated
106A wing / Wing NA184.64 sq m≈ 911 sq ft · RERA carpet areaBooked₹10,000,000
107A wing / Wing NA187.52 sq m≈ 942 sq ft · RERA carpet areaMarked unsoldNot stated
108A wing / Wing NA188.0 sq m≈ 947 sq ft · RERA carpet areaMarked unsoldNot stated
109A wing / Wing NA188.0 sq m≈ 947 sq ft · RERA carpet areaBooked₹7,000,000
110A wing / Wing NA188.0 sq m≈ 947 sq ft · RERA carpet areaBooked₹7,000,000
111A wing / Wing NA188.0 sq m≈ 947 sq ft · RERA carpet areaMarked unsoldNot stated
112A wing / Wing NA1106.39 sq m≈ 1,145 sq ft · RERA carpet areaBooked₹10,000,000

Read every entry in one table: Read the complete saved unit list.

Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Cost reported as incurred

₹38,176,368 of an estimated ₹967,500,000 was reported as incurred (3.9%). This percentage is about costs. It does not show how much construction is complete.

MahaRERA project filing · read 18 July 2026 · registration PM1260002501962

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
CommercialExcavation100.0%
CommercialBasement (if any)0.0%
CommercialPodiums (if any) 0.0%
CommercialPlinth0.0%
CommercialStilt Floor 0.0%
CommercialSlabs of Super Structure0.0%
CommercialInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
CommercialSanitary Fittings within the flats / premises0.0%
CommercialStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
CommercialExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
CommercialInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
A wingExcavation0.0%
A wingBasement (if any)0.0%
A wingPodiums (if any) 0.0%
A wingPlinth0.0%
A wingStilt Floor 0.0%
A wingSlabs of Super Structure0.0%
A wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
A wingSanitary Fittings within the flats / premises0.0%
A wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
A wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
A wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
B wingExcavation30.0%
B wingBasement (if any)0.0%
B wingPodiums (if any) 0.0%
B wingPlinth0.0%
B wingStilt Floor 0.0%
B wingSlabs of Super Structure0.0%
B wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
B wingSanitary Fittings within the flats / premises0.0%
B wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
B wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
B wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
C wingExcavation90.0%
C wingBasement (if any)0.0%
C wingPodiums (if any) 0.0%
C wingPlinth0.0%
C wingStilt Floor 0.0%
C wingSlabs of Super Structure0.0%
C wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
C wingSanitary Fittings within the flats / premises0.0%
C wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
C wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
C wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
D wingExcavation90.0%
D wingBasement (if any)0.0%
D wingPodiums (if any) 0.0%
D wingPlinth0.0%
D wingStilt Floor 0.0%
D wingSlabs of Super Structure0.0%
D wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
D wingSanitary Fittings within the flats / premises0.0%
D wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
D wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
D wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
E wingExcavation100.0%
E wingBasement (if any)0.0%
E wingPodiums (if any) 0.0%
E wingPlinth0.0%
E wingStilt Floor 0.0%
E wingSlabs of Super Structure0.0%
E wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
E wingSanitary Fittings within the flats / premises0.0%
E wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
E wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
E wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
F wingExcavation100.0%
F wingBasement (if any)0.0%
F wingPodiums (if any) 0.0%
F wingPlinth0.0%
F wingStilt Floor 0.0%
F wingSlabs of Super Structure0.0%
F wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
F wingSanitary Fittings within the flats / premises0.0%
F wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
F wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
F wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
G wingExcavation0.0%
G wingBasement (if any)0.0%
G wingPodiums (if any) 0.0%
G wingPlinth0.0%
G wingStilt Floor 0.0%
G wingSlabs of Super Structure0.0%
G wingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
G wingSanitary Fittings within the flats / premises0.0%
G wingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
G wingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
G wingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
H wing (MAHDA)Excavation0.0%
H wing (MAHDA)Basement (if any)0.0%
H wing (MAHDA)Podiums (if any) 0.0%
H wing (MAHDA)Plinth0.0%
H wing (MAHDA)Stilt Floor 0.0%
H wing (MAHDA)Slabs of Super Structure0.0%
H wing (MAHDA)Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
H wing (MAHDA)Sanitary Fittings within the flats / premises0.0%
H wing (MAHDA)Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
H wing (MAHDA)External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
H wing (MAHDA)Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
BungalowExcavation0.0%
BungalowBasement (if any)0.0%
BungalowPodiums (if any) 0.0%
BungalowPlinth0.0%
BungalowStilt Floor 0.0%
BungalowSlabs of Super Structure0.0%
BungalowInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
BungalowSanitary Fittings within the flats / premises0.0%
BungalowStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
BungalowExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
BungalowInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PM1260002501962

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹150,000,000₹200,000,000₹1,200,000,000₹2,050,000,000
Actual raised₹117,458,908₹0₹0₹546,765,907

MahaRERA project filing · read 18 July 2026 · registration PM1260002501962

Quarterly filing record

2 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.

MahaRERA project filing · read 18 July 2026 · registration PM1260002501962

Documents named in the filing

  • Occupancy / completion certificate · 11 listed
  • Sanctioned building plan · 34 listed
  • Commencement certificate · 7 listed
  • Promoter PAN · 6 listed
  • Form B — Promoter declaration · 1 listed
  • Form 3 — CA certificate · 1 listed
  • Title / search report · 1 listed
  • Sanctioned layout plan · 1 listed
  • Form 2 — Engineer's certificate · 1 listed
  • Form 1 — Architect's certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PM1260002501962

Builder and past records

What else does the record show?

Projects registered under this company

M/s. Chordiya Infrastructure

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026

Explore other registrations

    Past records of sales and unsold units

    1. 30 September 2026

      152 marked unsold · 0 sold · 94 booked.

      Saved MahaRERA unit list

    2. 21 September 2026

      152 marked unsold · 0 sold · 94 booked.

      Saved MahaRERA unit list

    3. 12 September 2026

      152 marked unsold · 0 sold · 94 booked.

      Saved MahaRERA unit list

    4. 4 September 2026

      152 marked unsold · 0 sold · 94 booked.

      Saved MahaRERA unit list

    These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, property type and price.

    Project Comparison Report

    Which project should you buy in?
    And which unit?

    Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 2 July 2026

    MahaRERA · per-unit inventory · read 4 September 2026

    This is a past RERA unit list, not current availability. It does not give the date each unit was sold.

    Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search PM1260002501962 ↗
    homeonpaper