The builder’s RERA record, explained

R28A Everglades - Phase 2

ARYS REALTORS PRIVATE LIMITED · PM1260002502776

MahaRERA · registration record · read 2 July 2026

Choose a report ↓

What does the RERA record show?

For R28A Everglades - Phase 2 (PM1260002502776), 299 of 299 entries were marked unsold in the MahaRERA home list read 4 September 2026.

MahaRERA · per-home inventory · read 4 September 2026

These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.

What would help you decide?

Buyer’s Report

Understand this project

Find homes to consider, with advice on light, layout, privacy and surroundings.

₹4,999

Unit Report

Check a particular home

See its advantages, drawbacks and how it compares with other homes in this project.

₹3,999

Project Comparison Report

Choose between projects

Compare two or three projects and get recommended homes in order, with reasons for each choice.

From ₹7,999

Choose projects →

Project status and completion date.

Inside this registered phase

How do the buildings compare in the record?

299 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.

MahaRERA · per-home inventory · read 4 September 2026

Scroll sideways to see all columns.

Building names, sale status and carpet areas — not current availability
Filed buildingEntriesSoldBookedMarked unsoldOther / unstated statusRecorded carpet-area range
Commercial Wing240024047.57–71.49 sq m≈ 512–769 sq ft
H1A14800148044.25–68.69 sq m≈ 476–739 sq ft
H1B11000110043.80–67.21 sq m≈ 471–723 sq ft
H1C6006042.75–92.18 sq m≈ 460–992 sq ft
H2110011045.11–68.62 sq m≈ 486–739 sq ft

Different sizes are not necessarily different bedroom types. How we read and summarise the filing →

Unit Report

Is this the right
home for you?

Understand its light, privacy, layout and surroundings. See how it compares with similar homes and other options in this project.

₹3,999 · 1 working day

Didn’t help you decide? Full refund — no questions asked.

Find your home in the RERA list.

The same home number may appear in more than one building. Check both before choosing.

299 listed entries

MahaRERA · per-home inventory · read 4 September 2026

RERA home list, not current availability
Home / buildingFloor in the recordCarpet areaReported statusAgreement valueAssess
1Commercial Wing20558.26 sq m≈ 627 sq ftMarked unsoldNot stated
101Commercial Wing20557.701 sq m≈ 621 sq ftMarked unsoldNot stated
102Commercial Wing20559.673 sq m≈ 642 sq ftMarked unsoldNot stated
103Commercial Wing20550.0 sq m≈ 538 sq ftMarked unsoldNot stated
104Commercial Wing20558.773 sq m≈ 633 sq ftMarked unsoldNot stated
105Commercial Wing20547.684 sq m≈ 513 sq ftMarked unsoldNot stated
106Commercial Wing20547.567 sq m≈ 512 sq ftMarked unsoldNot stated
2Commercial Wing20570.723 sq m≈ 761 sq ftMarked unsoldNot stated
201Commercial Wing20557.701 sq m≈ 621 sq ftMarked unsoldNot stated
202Commercial Wing20559.673 sq m≈ 642 sq ftMarked unsoldNot stated
203Commercial Wing20550.0 sq m≈ 538 sq ftMarked unsoldNot stated
204Commercial Wing20558.773 sq m≈ 633 sq ftMarked unsoldNot stated

Read every entry in one table: Read the complete saved home list.

Choose the home you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.

More from the RERA documents

Construction progress and project documents.

Work reported, by building

Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.

See all reported activities
BuildingActivityReported
H1AExcavation0.0%
H1APodiums (if any) 0.0%
H1APlinth0.0%
H1AStilt Floor 0.0%
H1ASlabs of Super Structure0.0%
H1AInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
H1ASanitary Fittings within the flats / premises0.0%
H1AStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
H1AExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
H1AInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
H1BExcavation0.0%
H1BPodiums (if any) 0.0%
H1BPlinth0.0%
H1BStilt Floor 0.0%
H1BSlabs of Super Structure0.0%
H1BInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
H1BSanitary Fittings within the flats / premises0.0%
H1BStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
H1BExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
H1BInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
H1CExcavation0.0%
H1CPodiums (if any) 0.0%
H1CPlinth0.0%
H1CStilt Floor 0.0%
H1CSlabs of Super Structure0.0%
H1CInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
H1CSanitary Fittings within the flats / premises0.0%
H1CStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
H1CExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
H1CInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
H2Excavation0.0%
H2Podiums (if any) 0.0%
H2Plinth0.0%
H2Stilt Floor 0.0%
H2Slabs of Super Structure0.0%
H2Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
H2Sanitary Fittings within the flats / premises0.0%
H2Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
H2External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
H2Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%
Commercial WingExcavation0.0%
Commercial WingPlinth0.0%
Commercial WingSlabs of Super Structure0.0%
Commercial WingInternal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0.0%
Commercial WingSanitary Fittings within the flats / premises0.0%
Commercial WingStaircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0.0%
Commercial WingExternal plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0.0%
Commercial WingInstallation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0.0%

MahaRERA project filing · read 18 July 2026 · registration PM1260002502776

Where the project funding comes from

RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.

FilingOwn fundsBorrowingPayments from buyersTotal
Estimated plan₹121,052,270₹165,000,000₹190,000,000₹476,052,270
Actual raised₹0₹165,000,000₹0₹165,000,000

MahaRERA project filing · read 18 July 2026 · registration PM1260002502776

Quarterly filing record

11 elapsed quarterly periods in the captured compliance schedule. Active default was recorded for FY 2025-2026.

MahaRERA project filing · read 18 July 2026 · registration PM1260002502776

Documents named in the filing

  • Title / search report · 1 listed
  • Form B — Promoter declaration · 1 listed
  • Commencement certificate · 7 listed
  • Sanctioned building plan · 9 listed
  • Promoter PAN · 3 listed
  • Occupancy / completion certificate · 4 listed
  • Sanctioned layout plan · 1 listed
  • Form 3 — CA certificate · 1 listed

A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.

MahaRERA project filing · read 18 July 2026 · registration PM1260002502776

Builder and past records

What else does the record show?

Projects registered under this company

ARYS REALTORS PRIVATE LIMITED

1Pune registrations

These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.

MahaRERA Pune registration records · read 2 July 2026

Explore other registrations

    Past records of sales and unsold homes

    1. 21 September 2026

      299 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    2. 12 September 2026

      299 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    3. 4 September 2026

      299 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    4. 18 July 2026

      53 marked unsold · 0 sold · 0 booked.

      Saved MahaRERA home list

    These dates show when the records were saved, not when homes were sold. Sales may have changed since then, even if the saved counts are the same.

    More projects to explore

    Other projects in this locality.

    These projects list the same locality. They may differ in exact location, home type and price.

    Project Comparison Report

    Which project should you buy in?
    And which home?

    Compare up to three projects. We read their plans and RERA documents, recommend homes in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.

    Create my Comparison Report →

    2 projects · ₹7,999
    3 projects · ₹9,999

    Within 1 working day

    Didn’t help you decide? Full refund — no questions asked.

    Compare project details for free →

    Sources and dates.

    MahaRERA · registration record · read 2 July 2026

    MahaRERA · per-home inventory · read 4 September 2026

    This is a past RERA home list, not current availability. It does not give the date each home was sold.

    Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.

    Open MahaRERA · search PM1260002502776 ↗