Buyer’s Report
Understand this project
Find units to consider, with advice on light, layout, privacy and surroundings.
₹4,999
Builder’s RERA records,
explained for buyers.
The builder’s RERA record, explained
Intofinity Promoters Private Limited · PR1261012501461
For Kohinoor Woodshire Phase 2 (PR1261012501461), 144 of 144 entries were marked unsold in the MahaRERA unit list dated 18 July 2026 (saved-file date).
MahaRERA · per-unit inventory · saved-file date 18 July 2026
These are past reported prices and sale statuses, not today’s quotes or availability. The details apply to this registered phase only.
Builder’s completion target
The builder reported this target date. It is not a confirmed handover date.
Status shown on RERA
This is the status shown on RERA. It does not confirm an occupancy certificate or today’s construction progress.
Inside this registered phase
144 filed entries, grouped by their recorded building names. These entries may include homes, shops or other property types.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
Scroll sideways to see all columns.
| Filed building | Entries | Sold | Booked | Marked unsold | Other / unstated status | Recorded filed-area range |
|---|---|---|---|---|---|---|
| Tower No 5 | 144 | 0 | 0 | 144 | 0 | 72.35–107.86 sq m≈ 779–1,161 sq ft |
Area means carpet area for building units and plot area for plots. Size alone does not establish use or layout. How we read and summarise the filing →
Unit Report
Understand its light, privacy, layout and surroundings. See how it compares with similar units and other options in this project.
Didn’t help you decide? Full refund — no questions asked.
The same unit number may appear in more than one building. Check both before choosing.
MahaRERA · per-unit inventory · saved-file date 18 July 2026
| Unit / building | Floor in the record | Filed area | Reported status | Agreement value | Assess |
|---|---|---|---|---|---|
| 1001Tower No 5 / Wing NA | 10 | 107.78 sq m≈ 1,160 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1002Tower No 5 / Wing NA | 10 | 72.35 sq m≈ 779 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1003Tower No 5 / Wing NA | 10 | 72.35 sq m≈ 779 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1004Tower No 5 / Wing NA | 10 | 107.86 sq m≈ 1,161 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1005Tower No 5 / Wing NA | 10 | 107.86 sq m≈ 1,161 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1006Tower No 5 / Wing NA | 10 | 72.35 sq m≈ 779 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 1007Tower No 5 / Wing NA | 10 | 72.35 sq m≈ 779 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 101Tower No 5 / Wing NA | 1 | 107.78 sq m≈ 1,160 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 102Tower No 5 / Wing NA | 1 | 72.35 sq m≈ 779 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 103Tower No 5 / Wing NA | 1 | 72.35 sq m≈ 779 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 104Tower No 5 / Wing NA | 1 | 107.86 sq m≈ 1,161 sq ft · RERA carpet area | Marked unsold | Not stated | |
| 105Tower No 5 / Wing NA | 1 | 107.86 sq m≈ 1,161 sq ft · RERA carpet area | Marked unsold | Not stated |
Read every entry in one table: Read the complete saved unit list.
Choose the unit you want us to assess. When preparing your report, we find it on the plans and examine its position and layout.
More from the RERA documents
₹194,091,133 of an estimated ₹653,842,944 was reported as incurred (29.7%). This percentage is about costs. It does not show how much construction is complete.
MahaRERA project filing · read 19 July 2026 · registration PR1261012501461
Different activities can be at different stages. The builder reported these percentages to RERA. They do not come from a site inspection or confirm a handover date.
| Building | Activity | Reported |
|---|---|---|
| Tower No 5 | Excavation | 100.0% |
| Tower No 5 | Basement (if any) | 100.0% |
| Tower No 5 | Plinth | 0.0% |
| Tower No 5 | Slabs of Super Structure | 0.0% |
| Tower No 5 | Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0.0% |
| Tower No 5 | Sanitary Fittings within the flats / premises | 0.0% |
| Tower No 5 | Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0.0% |
| Tower No 5 | External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0.0% |
| Tower No 5 | Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0.0% |
MahaRERA project filing · read 19 July 2026 · registration PR1261012501461
RERA records separate the builder’s own funds, loans and payments from buyers. Money raised and the project budget are different figures.
| Filing | Own funds | Borrowing | Payments from buyers | Total |
|---|---|---|---|---|
| Estimated plan | ₹277,000,000 | ₹0 | ₹705,523,444 | ₹982,523,444 |
| Actual raised | ₹0 | ₹418,373,666 | ₹0 | ₹418,373,666 |
MahaRERA project filing · read 19 July 2026 · registration PR1261012501461
3 elapsed quarterly periods in the captured compliance schedule. No active quarterly default was recorded in this snapshot.
MahaRERA project filing · read 19 July 2026 · registration PR1261012501461
A listed document does not confirm that an approval is still valid. Paid reports examine the documents themselves.
MahaRERA project filing · read 19 July 2026 · registration PR1261012501461
Builder and past records
Projects registered under this company
6Pune registrations
These registrations use the same company name. Each phase counts separately. This is not a count of completed developments or a rating of the builder’s delivery record.
MahaRERA Pune registration records · read 2 July 2026 – 12 July 2026
Past records of sales and unsold units
29 September 2026
144 marked unsold · 0 sold · 0 booked.
Saved MahaRERA unit list
20 September 2026
144 marked unsold · 0 sold · 0 booked.
Saved MahaRERA unit list
12 September 2026
144 marked unsold · 0 sold · 0 booked.
Saved MahaRERA unit list
19 July 2026
144 marked unsold · 0 sold · 0 booked.
Saved MahaRERA unit list
These dates show when the records were saved, not when units were sold. Sales may have changed since then, even if the saved counts are the same.
Project Comparison Report
Compare up to three projects. We read their plans and RERA documents, recommend units in each, and put the best choices for you in order. See the advantages and drawbacks of each choice.
2 projects · ₹7,999
3 projects · ₹9,999
Within 1 working day
Didn’t help you decide? Full refund — no questions asked.
Compare project details for free →MahaRERA · registration record · read 12 July 2026
MahaRERA · per-unit inventory · saved-file date 18 July 2026
This is a past RERA unit list, not current availability. It does not give the date each unit was sold.
The unit-list date is based on the saved file’s details.
Filed area means carpet area for building units and plot area for plots. Areas are reported in square metres. Square-foot figures are rounded conversions. This free page does not calculate dimensions or facing directions from drawings.
Open MahaRERA · search PR1261012501461 ↗